• Title/Summary/Keyword: Required Items of Stakeholder

Search Result 2, Processing Time 0.017 seconds

Improved Method for VE Items Selection by Analysing the Required Items of Stakeholder on the Apartment in Design Phase (공동주택의 설계VE단계에서 주체별 요구항목 분석을 통한 대상선정 개선방안)

  • Jeong, Ho-Geun;Yang, Jin-Kook;Lee, Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.111-119
    • /
    • 2008
  • VE is one of the most effective and systematic tool available to achieve the required function at minimum cost and manage in many industrial fields. The purpose of the preparation phase VE job plan is to establish a cooperation system referring to groups for the successful implementation of VE, and to achieve a common objective to collect sufficient materials required in the analysis phase. The Quality Model is used to measure the requirement of shareholders(users and owners)in the project. It also offers a guideline on decision making when executing the function definition, function arrangement, function evaluation, and the idea evaluation of VE. However, the current the preparation phase business confirms that the required items of owners and users has not suggested definite goals and directions. This study analyzes the problems of current work in the preparation phase from case study, survey and interviews of experts. It then proposes a new process after understanding the required items of owners, users and experts.

Evaluation of the ODA Forest Cooperation Projects in Korea through Stakeholder and Visitor Survey - A Case Study of the Rumpin Seed Source and Nursery Center Projects in Indonesia - (이해관계자와 이용객 설문 조사를 통한 국내 ODA 산림협력사업 평가 연구 - 인도네시아 룸핀양묘장 사업을 대상으로 -)

  • Lee, Hyun-Jung;Kim, Whee-Moon;Kim, Kyeong-Tae;Kim, Young;Choi, Jae-Yong;Song, Won-Kyong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.24 no.2
    • /
    • pp.19-37
    • /
    • 2021
  • It is essential that the evaluation of official development assistance (ODA) projects is conducted based on empirical research for the performance and improvement of the project. This study intended to quantitatively figure out the actual status and performance of ODA projects. The performance of the Rumpin Seed Source and Nursery Center project implemented by the KOICA was evaluated in items of relevance, efficiency, effectiveness, impact, sustainability, which are OECD Development Assistance Committee(DAC) evaluation criteria. From August 26, 2019 to August 29, 2019, a survey was conducted on 50 visitors and 54 stakeholders of the Rumpin Seed Source and Nursery Center. Through on-site survey, problems in the donation project and operation in Indonesia were identified and measures for improvement was grasped. As a result of the study, the value scored by OECD DAC evaluation criteria of the Rumpin Seed Source and Nursery Center project based on the Economic Development Cooperation Fund(EDCF) evaluation grade was evaluated as a very successful class in all items. The average score of the recognition question was 4.08 points for visitors and 4.08 points for stakeholders, and the average score for the satisfaction question was 4.37 points for visitors and 4.11 points for stakeholders, which were high overall in both groups. The main factor that affects the project awareness of the visitors was the fact that the Rumpin Seed Source and Nursery Center was created based on Korean technology, and it was confirmed that Indonesia's own items related to similar projects had a great influence on the project satisfaction. In the case of stakeholders, project support in Korea affected their recognition, and it was found that relevance, efficiency, effectiveness items had the greatest impact on the level of project satisfaction of stakeholders derived from the DAC individual evaluation results. Efforts are required to increase the main factors by reflecting the results of each item and to preserve and maintain the project. This study is significant in determining the performance of the ODA project based on empirical data, and it is believed that it can be used as basic data for supplementing and strengthening the project in the future.