• Title/Summary/Keyword: Replacement Rate

Search Result 1,113, Processing Time 0.026 seconds

Clinical Experience of Multiple Valve Replacement (심장 다판치환술의 임상적 고찰)

  • Kim, Sang-Hyeong;Na, Guk-Ju
    • Journal of Chest Surgery
    • /
    • v.22 no.6
    • /
    • pp.970-979
    • /
    • 1989
  • From April 1982 to December, 1988, multiple valve replacement was performed in 49 patients. Mitral and aortic valve replacement were done in 42 patients, 4 underwent mitral and tricuspid valve replacement and 3 patients underwent triple valve replacement. Of the valve implanted, 50 were Duromedics, 21 St. Jude, 13 Bjork-Shiley, 9 Carpentier-Edwards, 6 Ionescu-Shiley, and 2 Medtronic. The hospital mortality rate was 28.5 % [14 patients] and the late mortality rate was 6.1 % [3 patients], the mortality rate was high in early operative period but decreased with time. [20% at 1986, 18.2 % at 1987, 9.5% at 1988] The causes of death were low cardiac output in 8, congestive heart failure in 2, multiple organ failure in 1, LV rupture in 1, intracerebral hemorrhage in 1 and sudden death in l. The actuarial survival rate excluding operative death was 77% at 7 years.

  • PDF

A Bayesian Approach to Replacement Policy with Extended Warranty (연장된 보증이 있는 교체정책에 대한 베이지안 접근)

  • Jung, Ki Mun
    • Journal of Applied Reliability
    • /
    • v.13 no.4
    • /
    • pp.229-239
    • /
    • 2013
  • This paper reports a manner to use a Bayesian approach to derive the optimal replacement policy. In order to produce a system with minimal repair warranty, a replacement model with the extended warranty is considered. Within the warranty period, the failed system is minimally repaired by the manufacturer at no cost to the end-user. The failure time is assumed to follow a Weibull distribution with unknown parameters. The expected cost rate per unit time, from the end-user's viewpoints, is induced by the Bayesian approach, and the optimal replacement policy to minimize the cost rate is proposed. Finally, a numerical example illustrating to derive the optimal replacement policy based on the Bayesian approach is described.

A New Direction of National Pension System for Aging : Different age insurance premium rate and income replacement rate application (노령화로 인한 국민연금의 새로운 제도 방향: 연령별 차등 보험료율, 소득대체율 적용)

  • Park, Sanghong;Kim, Eunsoo;Park, Yiseul;Lee, Jiyun;Jun, Doobae
    • The Journal of the Convergence on Culture Technology
    • /
    • v.4 no.4
    • /
    • pp.201-206
    • /
    • 2018
  • The fourth fiscal estimate of the national pension following the aging of the population and falling yields estimated that the fund ran out in 2057, three years earlier than the third fiscal calculation. Accordingly, the government proposed a plan to immediately raise the insurance premium rate by 2 percent and maintain the income replacement rate by 45 percent, and to reduce the income replacement rate by 40 percent in 2028. In this form, increasing premiums and reducing income replacement rates will allow younger generations to sign up differently from existing subscribers, who previously had higher income replacement rates at lower rates. Therefore, the study aims to ease the burden on the elderly and younger by applying different insurance rates and income replacement rates for different ages.

Evaluation of Properties of Mortar and Concrete using Wood Chip Cogeneration Plant Flooring as Fine Aggregate (목재칩 열병합 발전소 바닥재를 잔골재로 활용한 모르타르 및 콘크리트 특성 평가)

  • Kang, Suk-Pyo;Hong, Seong-Uk
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.10 no.3
    • /
    • pp.327-334
    • /
    • 2022
  • In this study, in order to evaluate the characteristics of mortar and concrete using wood chip cogeneration plant flooring as fine aggregate, mortar characteristics according to wood chip aggregate replacement rate and water-cement ratio as a substitute for crushed sand, and concrete characteristics according to wood chip aggregate replacement rate were compared and evaluated. The cement mortar flow according to the wood chip aggregate replacement rate showed a tendency to increase as the wood chip aggregate replacement rate increased, and the compressive strength and flexural strength increased as the wood chip aggregate replacement rate increased. The slump and air content of concrete increased as the aggregate replacement rate increased, and the compressive strength and tensile splitting strength of concrete tended to increase as the wood chip aggregate replacement rate increased. Accordingly, the possibility of using the flooring by the cogeneration plant as a fine aggregate for concrete was confirmed.

Replacement Model Following the Expiration of Free RRNMW (무료 재생교체-비재생수리보증이 종료된 이후의 교체모형)

  • Jung, Ki-Mun
    • Communications for Statistical Applications and Methods
    • /
    • v.18 no.6
    • /
    • pp.697-705
    • /
    • 2011
  • This paper proposes an optimal replacement policy following the expiration of a free renewing replacement-non-renewing minimal repair warranty. To do so, the free renewing replacement-non-renewing minimal repair warranty is defined and then the maintenance model following the expiration of free renewing replacement-non-renewing minimal repair warranty from the user's point of view is studied. As the criteria to determine the optimality of the maintenance policy, we consider the expected cost rate per unit time from the user's perspective. We derive the expressions for the expected cycle length and the expected total cost to obtain the expected cost rate per unit time. Finally, the numerical examples are presented for illustrative purposes.

An Experimental Study on the Flowing and Strength Properties of Mortar using Low Carbon Inorganic Binder by Sand Replacement Ratio (잔골재 치환율별 저탄소 무기결합재를 사용한 모르타르의 유동 및 강도 특성에 관한 실험적 연구)

  • Bae, Sang-Woo;Lee, Yun-Seong;Lee, Kang-Pil;Lee, Sang-Soo;Song, Ha-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.63-64
    • /
    • 2011
  • This study is about the mortar in which fine aggregate is substituted by low-carbon eco-friendly inorganic composite prepared by addition of alkali accelerator in industrial by-products such as blast furnace slag, red mud and silica fume as a replacement for cement. Results of experiments on flow and strength properties in mortar of inorganic composite according to replacement rate of fine aggregate showed that amount of air and table flow decreased as replacement rate of fine aggregate about inorganic composite got higher. Also, it's shown that the compressive strength was the highest at replacement rate 50% of fine aggregate about inorganic composite.

  • PDF

Preventive maintenance policy following the expiration of replacement-repair warranty (교체-수리보증이 종료된 이후의 예방보전정책)

  • Jung, Ki-Mun
    • Journal of Applied Reliability
    • /
    • v.12 no.2
    • /
    • pp.57-66
    • /
    • 2012
  • In this paper, we consider the periodic preventive maintenance model for a repairable system following the expiration of replacement-repair warranty. Under this preventive maintenance model, we derive the expressions for the expected cycle length, the expected total cost and the expected cost rate per unit time. Also, we determine the optimal preventive maintenance period and the optimal preventive maintenance number by minimizing the expected cost rate per unit time. Finally, the optimal periodic preventive maintenance policy is given for Weibull distribution case.

Proper Decision for Maintenance Intervals of Equipment in Power Stations by Considering Maintenance Replacement Rate and Operation Rate

  • Nakamura, Masatoshi;Suzuki, Yoshihiro;Hatazaki, Hironori
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.157.3-157
    • /
    • 2001
  • In this paper, the optimal maintenance scheduling for turbine with considering maintenance replacement rate was proposed in order to reduce the maintenance cost during the whole period of operation, meanwhile keeping current reliability of turbine. The proposed method is only based on a few limited available data with various factors relating to maintenance replacement and repair of turbine. The proposed method will be adopted by Kyushu Electric Power Co., Inc. from April in 2002 to determine the maintenance schedule of thermal power plants.

  • PDF

A Study on the Mechanical Characteristics of the replaced concrete by the Waste Glass Powder (폐류리분미를 사용한 콘크리트의 역학적 특성에 관한 연구)

  • 김명재;송창영;정호철;설광욱;부척량
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.10a
    • /
    • pp.247-253
    • /
    • 1997
  • This study performed the experimental research comparing mechanical characteristics of the concrete replaced by the waste glass powder with the non-replaced concrete. The experimental parameters are kinds of the waste glass powder and replacement rate of the waste glass powder on the cement. As as result, the slump value, the flow value and the amount of air were decreased as the waste glass powder replacement rate increased, and the strength was increased when the waste glass powder replacement rate is 5%~15%.

  • PDF

Preventive Policy With Minor Failure Under Age and Periodic Replacement (경미한 고장을 수반하는 시스템에 대한 노화 및 예방적 교체 정책)

  • Lee, Jinpyo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.45 no.3
    • /
    • pp.78-89
    • /
    • 2022
  • The purpose of this study was to propose useful suggestion by analyzing preventive replacement policy under which there are minor and major failure. Here, major failure is defined as the failure of system which causes the system to stop working, however, the minor failure is defined as the situation in which the system is working but there exists inconvenience for the user to experience the degradation of performance. For this purpose, we formulated an expected cost rate as a function of periodic replacement time and the number of system update cycles. Then, using the probability and differentiation theory, we analyzed the cost rate function to find the optimal points for periodic replacement time and the number of system update cycles. Also, we present a numerical example to show how to apply our model to the real and practical situation in which even under the minor failure, the user of system is not willing to replace or repair the system immediately, instead he/she is willing to defer the repair or replacement until the periodic or preventive replacement time. Optimal preventive replacement timing using two variables, which are periodic replacement time and the number of system update cycles, is provided and the effects of those variables on the cost are analyzed.