• Title/Summary/Keyword: Repairing time

Search Result 209, Processing Time 0.03 seconds

T Lymphocyte Subsets and Cytokines in Rats Transplanted with Adipose-Derived Mesenchymal Stem Cells and Acellular Nerve for Repairing the Nerve Defects

  • Jiang, Liang-fu;Chen, Ou;Chu, Ting-gang;Ding, Jian;Yu, Qing
    • Journal of Korean Neurosurgical Society
    • /
    • v.58 no.2
    • /
    • pp.101-106
    • /
    • 2015
  • Objective : The aim of this study was to explore the immunity in rats transplanted with adipose-derived mesenchymal stem cells (ADSCs) and acellular nerve (ACN) for repairing sciatic nerve defects. Methods : ADSCs were isolated from the adipose tissues of Wistar rats. Sprague-Dawley rats were used to establish a sciatic nerve defect model and then divided into four groups, according to the following methods : Group A, allogenic nerve graft; Group B, allograft with ACN; Group C, allograft ADSCs+ACN, and Group D, nerve autograft. Results : At the day before transplantation and 3, 7, 14, and 28 days after transplantation, orbital venous blood of the Sprague-Dawley rats in each group was collected to detect the proportion of $CD3^+$, $CD4^+$, and $CD8^+$ subsets using flow cytometry and to determine the serum concentration of interleukin-2 (IL-2), tumor necrosis $factor-{\alpha}$ ($TNF-{\alpha}$) and $interferon-{\gamma}$ ($IFN-{\gamma}$) using enzyme-linked immunosorbent assay (ELISA). At each postoperative time point, the proportion of $CD3^+$, $CD4^+$, and $CD8^+$ subsets and the serum concentration of IL-2, $TNF-{\alpha}$, and $IFN-{\gamma}$ in group C were all near to those in group B and group D, in which no statistically significant difference was observed. As compared with group A, the proportion of $CD3^+$, $CD4^+$, and $CD8^+$ subsets and the serum concentration of IL-2, $TNF-{\alpha}$, and $IFN-{\gamma}$ were significantly reduced in group C (p<0.05). Conclusion : The artificial nerve established with ADSCs and ACN has no obvious allograft rejection for repairing rat nerve defects.

Trenchless Repairing-Reinforcing Process of Underground Pipes with Advanced Composite Materials (신소재 복합재료를 이용한 비굴착 지하매설관 보수-보강공법)

  • 진우석;권재욱;이대길;유애권
    • Composites Research
    • /
    • v.15 no.1
    • /
    • pp.21-31
    • /
    • 2002
  • To overcome the disadvantages of conventional excavation technology various trenchless (or excavation free, or no-dig) repair-reinforcement technologies have been developed and tried. But trenchless technologies so far developed have some drawbacks such as high cost and inconvenience of operation. In this study, a repairing-reinforcing process for underground pipes with glass fiber fabric polymer composites using VARTM (Vacuum Assisted Resin Transfer Molding) has been developed. The developed process requires shorter operation time and lower cost with smaller and simpler operating equipments than those of the conventional trenchless technologies. For the reliable operation of the developed method, a simple method to apply pressure and vacuum to the reinforcement was devised and flexible mold technology was tried. Also, resin filling and cure status during RTM process were monitored with a commercial dielectrometry cure monitoring system, LACOMCURE. From the investigation, it has been found that the developed repairing-reinforcing technology with appropriate process variables and on-line cure monitoring has many advantages over conventional methods.

Rehabilitation of normal and self-compacted steel fiber reinforced concrete corbels via basalt fiber

  • Gulsan, Mehmet Eren;Al Jawahery, Mohammed S.;Alshawaf, Adnan H.;Hussein, Twana A.;Abdulhaleem, Khamees N.;Cevik, Abdulkadir
    • Advances in concrete construction
    • /
    • v.6 no.5
    • /
    • pp.423-463
    • /
    • 2018
  • This paper investigates the behavior of normal and self-compacted steel fiber reinforced concrete (SCC-SFRC) corbels rehabilitated by Basalt Fiber Mesh (BFM) and Basalt Fiber Fabric (BFF) for the first time in literature. The research objective is to study the effectiveness of BFM and BFF in the rehabilitation of damaged reinforced concrete corbels with and without epoxy injection. The experimental program includes two types of concrete: normal concrete, and self-compacted concrete. For normal concrete, 12 corbels were rehabilitated by BFM without injection epoxy in cracks, with two values of compressive strength, three ratios of steel fiber (SF), and two values of shear span. For self-compacted concrete, 48 corbels were rehabilitated with different parameters where 12 corbels were rehabilitated by BFM with and without epoxy injection, 18 heated corbels with three different high-temperature level were rehabilitated by repairing cracks only by epoxy injection, and 18 heated corbels with three different high-temperature level were rehabilitated by repairing cracks by epoxy and wrapping by BFF. All 48 corbels have two values of compressive strength, three values volumetric ratios of SF, and two values of the shear span. Test results indicate that RC corbels rehabilitated by BFM only without injection did not show any increase in the ultimate load capacity. Moreover, For RC corbels that were repaired by epoxy without basalt wrapping, the ultimate load capacities showed an increase depending on the mode of failure of corbels before the rehabilitation. However, the rehabilitation with only crack repairing by epoxy injection is more effective on medium strength corbels as compared to high strength ones. Finally, it can be concluded that use of BFF is an effective and powerful technique for the strengthening of damaged RC corbels.

A Tool for On-the-fly Repairing of Atomicity Violation in GPU Program Execution

  • Lee, Keonpyo;Lee, Seongjin;Jun, Yong-Kee
    • Journal of the Korea Society of Computer and Information
    • /
    • v.26 no.9
    • /
    • pp.1-12
    • /
    • 2021
  • In this paper, we propose a tool called ARCAV (Atomatic Recovery of CUDA Atomicity violation) to automatically repair atomicity violations in GPU (Graphics Processing Unit) program. ARCAV monitors information of every barrier and memory to make actual memory writes occur at the end of the barrier region or to make the program execute barrier region again. Existing methods do not repair atomicity violations but only detect the atomicity violations in GPU programs because GPU programs generally do not support lock and sleep instructions which are necessary for repairing the atomicity violations. Proposed ARCAV is designed for GPU execution model. ARCAV detects and repairs four patterns of atomicity violations which represent real-world cases. Moreover, ARCAV is independent of memory hierarchy and thread configuration. Our experiments show that the performance of ARCAV is stable regardless of the number of threads or blocks. The overhead of ARCAV is evaluated using four real-world kernels, and its slowdown is 2.1x, in average, of native execution time.

Experimental Study on Performance of MgO-based Patching Materials for Rapid Repair of Concrete Pavement (콘크리트 포장의 급속 보수를 위한 산화마그네슘계열 단면복구재의 성능에 대한 실험적 연구)

  • Lee, Hyeongi;Ann, Kiyong;Sim, Jongsung
    • International Journal of Highway Engineering
    • /
    • v.18 no.1
    • /
    • pp.43-55
    • /
    • 2016
  • PURPOSES : This study aims to develop a repair material that can enhance pavement performance, inducing rapid traffic opening through early strength development and fast setting time by utilizing MgO-based patching materials for repairing road pavements. METHODS : To consider the applicability of MgO-based patching materials for repairing domestic road pavements, first, strength development and setting time of the materials were evaluated, based on MgO to $KH_2PO_4$ ratio, water to binder ratio, and addition ratio of retarder (Borax), by which the optimal mixture ratio of the developed material was obtained. To validate the performance of the developed material as a repair material, the strength(compressive strength and bonding strength) and durability (freezing, thawing, and chloride ion penetration resistance) was checked through testing, and its applicability was evaluated. RESULTS : The results showed that when an MgO-based patching material was used, the condensation time was reduced by 80%, and the compressive strength was enhanced by approximately 300%, as compared to existing cement-based repair materials. In addition, it was observed that the strength (compressive strength and bonding strength) and durability (freezing and thawing, and chloride ion penetration resistance) showed an excellent performance that satisfied the regulations. CONCLUSIONS : The results imply that an emergent repair/restoration could be covered by a rapid-hardening cement to meet the traffic limitation (i.e. the traffic restriction is only several hours for repair treatment). Furthermore, MgO-based patching materials can improve bonding strength and durability compared to existing repair materials.

Restoration of pre-damaged RC bridge columns using basalt FRP composites

  • Fahmy, Mohamed F.M.;Wu, Zhishen
    • Earthquakes and Structures
    • /
    • v.14 no.5
    • /
    • pp.379-388
    • /
    • 2018
  • This study aims to identify the effect of both longitudinal reinforcement details and damage level on making a decision of repairing pre-damaged bridge columns using basalt fiber reinforced polymer (BFRP) jackets. Two RC bridge columns with improper details of the longitudinal and/or transverse reinforcement were tested under the effect of a constant axial load and increasing lateral cyclic loading. Test results showed that the lap-splice column exhibited an inferior performance where it showed rapid degradation of strength before achieving the theoretical strength and its deformation capacity was limited; however, quick restoration is possible through a suitable rehabilitation technique. On the other hand, expensive repair or even complete replacement could be the decision for the column with the confinement failure mode. After that, a rehabilitation technique using external BFRP jacket was adopted. Performance-based design details guaranteeing the enhancement in the inelastic performance of both damaged columns were addressed and defined. Test results of the repaired columns confirmed that both reparability and the required repairing time of damage structures are dependent on the reinforcement details at the plastic hinge zone. Furthermore, lap-splice of longitudinal reinforcement could be applied as a key design-tool controlling reparability and restorability of RC structures after massive actions.

Design and Manufacture of the Packer of Sewages Mainteance (하수관 보수를 위한 Packer 설계 및 제작)

  • 정재후;윤지섭;김영환;이종열;홍동희
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1997.10a
    • /
    • pp.576-579
    • /
    • 1997
  • In order to repair sewage pipes, it is necessary to dig up the damaged sewage pipes, which results in traffic jams. Since digging up the pipes takes too much time and cost, this method is inefficient. So, in stead of digging up the damaged pipes, a robot is sent down to the pipe to do the repair works. For big pipes, human workers go into the pipe and do to repair works, but for small pipes, it is impossible for human worker to go inside the pipe. In this case, mobile robots have used. The procedures for repairing pipes are as follows : First, the condition of the sewage pipes is observed by a robot. Second, appropriate steps for repair are determined according to the types of the damage. While repairing procedures, a newly-developed packer is sent into the sport to be repaired inside the pipe. Then, the packer is filled with air by a V-shaped wrinkel pipe. This makes the packer inflates uniformly and adhere closely to the inside wall of the pipe in large area. This increases the area that can be repaired. Therefore, the newly-developed packer will be very helpful for sewage pipe repair works.

  • PDF

A Study for Developing of Rail Bridge Inspection Robot (철도교량 자동화 로봇 개발을 위한 기초 연구)

  • Koo, Ja-Kyung;Hwang, In-Ho;Lee, Jong-Seh;Lee, Tai-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.188-193
    • /
    • 2008
  • According to introduce KTX in Korea, rail-road bridge section of KTX was increased approximately 50% of the total length. Bridge is required periodic inspection and check to prevent accident and hazard because various damage which have effects on traffic and replacement of damaged parts is difficult. Specifically, the train as large-scale transportation because accidents led to great damage, preventing these accidents are critical. Well-organized management and maintenance systems are required to prevent the accidents. In the case of roadway bridge, bridge inspection vehicle is used to deploy inspectors in roadway bridge. However, this method requires a lot of time and efforts, and inspectors are exposed to potential hazard. Also, surrounding environment like poor lighting system or electric wire could harm the inspector while repairing. Due to this reason, automatic repairing and inspecting system have been introduced to replace the old methods. Management system of the railroad bridge track for trains uses various advanced equipments, but whereas roadway bridge management system is lacking these efforts. As a result of that, this study looks over the existing management method. and review the method to apply the Bridge Inspection Robot in railroad bridge. Moreover, this study suggests future management technology using inspection robot.

  • PDF

A Survey on the Break-down and Repair of the Power Tillers in Korea (동력경운기(動力耕耘機) 이용실태(利用實態) 조사분석(調査分析)(II) -고장(故障) 및 수리(修理)에 관(關)하여-)

  • Hong, Jong Ho;Lee, Chai Shik
    • Journal of Biosystems Engineering
    • /
    • v.6 no.1
    • /
    • pp.28-38
    • /
    • 1981
  • A survey has been conducted to investigate the presents of breaks down and repair of power tiller for efficient use. Eight provinces were covered for this study. The results are summarized as follows. A. Frequency of breaks down. 1) Power tiller was breaken down 9.05 times a year and it represents a break down every 39.1 hours of use. High frequency of breaks down was found from the fuel and ignition system. For only these system, the number of breaks down were 2.02 and it represents 23.3% among total breaks down. It was followed by attachments, cylinder system, and traction device. 2) For the power tiller which was more than six years old, breaks down accured 37.7 hours of use and every 38.6 hours for the power tiller which was purchased in less than 2 years. 3) For the kerosene engine power tiller, breaks down occured every 36.8 hours of use, which is a higher value compared with diesel engine power tiller which break down every 42.8 hours of use. The 8HP kerosene engine power tiller showed higher frequency of break down compared with any other horse power tiller. 4) In October, the lowest frequency of break down was found with the value of once for every 51.5 hours of use, and it was followed by the frequency of break down in June. The more hours of use, the less breaks down was found. E. Repair place 1) 45.3% among total breaks down of power tiller was repaired by the owner, and 54.7% was repaired at repair shop. More power tiller were repaired at repair shop than by owner of power tiller. 2) The older the power tiller is, the higher percentage of repairing at the repair shop was found compared with the repairing by the owner. 3) Higher percentage of repairing by the owner was found for the diesel engine power tiller compared with the kerosene engine power tiller. It was 10 HP power tiller for the kerosene power tiller and 8 HP for the diesel engine power tiller. 4) 66.7% among total breaks down of steering device was repaired by the owner. It was the highest value compared with the percentage of repairing of any other parts of power tiller. The lowest percentage of repairing by owner was found for the attachments to the power tiller with the value of 26.5%. C. Cause of break down 1) Among the total breaks down of power tiller, 57.2% is caused by the old parts of power tiller with the value of 5.18 times break down a year and 34.7% was caused by the poor maintenance and over loading. 2) For the power tiller which was purchased in less than two years, more breaks down were caused by poor maintenance in comparison to the old parts of power tiller. 3) For the both 8-10 HP kerosene and diesel engine power tiller, the aspects of breaks down was almost the same. But for the 5 HP power tiller, more breaks down was caused by over loading in comparison to the old parts of power tiller. 4) For the cylinder system and traction device, most of the breaks down was caused by the old parts and for the fuel and ignition system, breaks down was caused mainly by the poor maintenance. D. Repair Cost 1) For each power tiller, repair cost was 34,509 won a year and it was 97 won for one hoar operation. 2) Repair cost of kerosene engine power tiller was 40,697 won a year, and it use 28,320 won for a diesel engine power tiller. 3) Average repair cost for one hour operation of kerosene engine power tiller was 103 won, and 86 won for a diesel engine power tiller. No differences were found between the horse power of engines. 4) Annual repair cost of cylinder system was 13,036 won which is the highest one compared with the repair cost of any other parts 362 won a year was required to repair the steering device, and it was the least among repair cost of parts. 5) Average cost for repairing the power tiller one time was 3,183 won. It was 10,598 won for a cylinder system and 1,006 won for a steering device of power tiller. E. Time requirement for repairing by owner. 1) Average time requirements for repairing the break down of a power tiller by owner himself was 8.36 hours, power tiller could not be used for operation for 93.58 hours a year due to the break down. 2) 21.3 hours were required for repairing by owner himself the break down of a power tiller which was more than 6 years old. This value is the highest one compared with the repairing time of power tiller which were purchased in different years. Due to the break down of the power tiller, it could not be used for operation annually 127.13 hours. 3) 10.66 hours were required for repairing by the owner himself a break down of a diesel engine power tiller and 6.48 hours for kerosene engine power tiller could not be used annually 99.14 hours for operation due to the break down and it was 88.67 hour for the diesel engine power tiller. 4) For both diesel and kerosene engine power tiller 8 HP power tiller required the least time for repairing by owner himself a break down compared with any other horse power tiller. It was 2.78 hours for kerosene engine power tiller and 8.25 hours fur diesel engine power tiller. 5) For the cylinder system of power tiller 32.02 hours were required for repairing a break down by the owner himself. Power tiller could not be used 39.30 hours a year due to the break down of the cylinder system.

  • PDF

A Study on Evaluation of High Early Strength Concrete as Pavement Overlay Materials for Early Traffic Opening(2) (신속개방형 콘크리트 도로포장재의 설계를 위한 평가 연구(2))

  • 엄태선;임채용;유재상;이종열;엄주용;조윤호
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.233-238
    • /
    • 2001
  • In road Pavements, it is known that cement concrete pavement has superior durability, safety compared with asphalt pavement. But in repairing pavement, cement concrete pavement is not usually applied because of the length of time while the road is interrupted when using Ordinary and Rapid-hardening Portland Cement. And Super High Early Strength Cement and Ultra Super High Early Strength Cement are not favorable for ready mixed concrete because of rapid setting time, high slump loss and other restrictions. We aim to develope special cement and concrete developing 1 day strength of over 300 kg/$\textrm{cm}^2$ to open the road within one day and workable time is maintained over 1 hour that can be used as ready mixed concrete. In this study, we produced cement using rapid-hardening cement, Hauyne clinker, anhydride gypsum and accelerator and studied on its properties. The comperssive strength was over 400 kg/$\textrm{cm}^2$ and tensile at 1 day and workable time was maintained for over 1 hour.

  • PDF