• Title/Summary/Keyword: Repair works

Search Result 195, Processing Time 0.026 seconds

Analytical Study on I-beam of I-beam Grated Concrete slab (I 형강 격자 상판의 주부재 I형강에 대한 해석적 연구)

  • 박창규;김용곤;정영수
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.05a
    • /
    • pp.437-442
    • /
    • 2001
  • Recently, there have been increased much concerns about repair and rehabilitation works for aged concrete structures. In particular, it is known that due to repeated overburden vehicle there are significantly increasing number of aged concrete bridge slabs, which are strongly needed to construct and rehabilitate by innovative construction method. The objective of this research is to develop the new construction method of concrete slab in bridge structure, which can contribute to minimize the traffic congestion during the repair and rehabilitation works of aged concrete slab, and can also sufficiently assure the quality through the minimization of in-situ works at the site. I-beams with punch holes, which are substituted instead of main reinforcing steels in concrete slabs, will be manufactured in accordance with the specification in the factory. and will be preassembled into the Panel. After erecting the preassembled panels in the site, concrete will be poured into the slab panel. This research is to investigate physical properties of I-Beam with punch holes itself through static and fatigue test with rational numerical analysis Finally this research is to suggest reformed I-beam through the numerical analysis.

  • PDF

Experimental Comparison for Static Performance of I-beam Concrete Slab (I-형강 합성바닥판의 정적 성능비교)

  • 박길용;박창규;정영수
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.05a
    • /
    • pp.947-952
    • /
    • 2002
  • Recently, there have been increased much concerns about repair and rehabilitation works for aged concrete structures. In particular, it is known that due to repeated overburden vehicle there are significantly increasing number of aged concrete bridge slabs, which are strongly needed to construct and rehabilitate by innovative construction method. The objective of this research is to develop the new construction method of concrete slab in bridge structure, which can contribute to minimize the traffic congestion during the repair and rehabilitation works of aged concrete slab, and can also sufficiently assure the quality through the minimization of in-situ works at the site. I-beams with punch holes, which are substituted instead of main reinforcing steels in concrete slabs, will be manufactured in accordance with the specification in the factory, and will be preassembled into the panel. After erecting the preassembled panels in the site, concrete will be poured into the slab panel. This research is to investigate physical properties of I-Beam concrete slab through static test.

  • PDF

Establishment of Service Life of Educational Facilities - Focused on the rooftop waterproofing and floor finishing -

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • v.14 no.5
    • /
    • pp.5-12
    • /
    • 2014
  • Building has been deteriorated gradually owing to geographic, physical complex and other factors. School living condition has a key role to improve the learning ability, life attitude and qualifications to adopt to social life. Therefore, it is important for school environment to keep the living condition. Repair time and scope of school facilities are required to maintain the function and performance to plan the long term repair. But there are little information about the school maintenance such as repair time and function. In this paper, it aimed at providing the service life to suggest the repair time and scope in the roof-proofing and floor finishing which used the three estimation method in probabilistic approach. The service life has a key role to decide the repair time and to make the plan for the repair maintenance. Results of this study are as follows ; First, the 1st repair time were taken through three methods in probabilistic and deterministic functions to eliminate the estimation bias. Second, the service life is suggested 36 years of an elementary school, 34 years of a middle school and 41 years of a high school. Third, the service life of a floor finishing is 43 years of an elementary, 39 years of a middle school and 41 years of a high school. The above study could not include the detailed information about the materials and repair works. Therefore it needs a further study to reflect the detailed information and to make a repair strategy.

Optimal Periodic Replacement Policy Under Discrete Time Frame (이산 시간을 고려한 시스템의 교체와 수리 비용 최적화 연구)

  • Lee, Jinpyo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.1
    • /
    • pp.61-69
    • /
    • 2020
  • Systems such as database and socal network systems have been broadly used, and their unexpected failure, with great losses and sometimes a social confusion, has received attention in recent years. Therefore, it is an important issue to find optimal maintenance plans for such kind of systems from the points of system reliability and maintaining cost. However, it is difficult to maintain a system during its working cycle, since stopping works might incur users some troubles. From the above viewpoint, this paper discusses minimal repair maintenance policy with periodic replacement, while considering the random working cycles. The random working cycle and periodic replacement policies with minimal repair has been discussed in traditional literatures by usually analyzing cases for the nonstopping works. However, maintenance can be more conveniently done at discrete time and even during the working cycle in real applications. So, we propose that periodic replacement is planned at discrete times while considering the random working cycle, and moreover provide a model in which system, with a minimal repair at failures between replacements, is replaced at the minimum of discrete times KT and random cycles Y. The average cost rate model is used to determine the optimal number of periodic replacement.

Studies on Repair of Reinforced Concrete Structures(I) -Repair Materials and Methods- (철근콘크리트 구조물의 보수공법 연구(I) -보수재료 및 공법-)

  • 연규석;정영수;한만엽;이종열;장태연;정경현
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1995.04a
    • /
    • pp.212-218
    • /
    • 1995
  • This study experimentally evaluated the performance of damaged section which was repaired using polymer materials in reinforced flexural flexural members Six different materials, two types of polymer, two types of polymer-cement and two types of cement, were used by means of injection method on prepacked concrete and spray mortar patching method. As results, the repair works could be done easily and surfaces of the repaired section were smooth.

  • PDF

A Novel BIRA Method with High Repair Efficiency and Small Hardware Overhead

  • Yang, Myung-Hoon;Cho, Hyung-Jun;Jeong, Woo-Sik;Kang, Sung-Ho
    • ETRI Journal
    • /
    • v.31 no.3
    • /
    • pp.339-341
    • /
    • 2009
  • Built-in redundancy analysis (BIRA) is widely used to enhance the yield of embedded memories. In this letter, a new BIRA method for both high repair efficiency and small hardware overhead is presented. The proposed method performs redundancy analysis operations using the spare mapping registers with a covered fault list. Experimental results demonstrate the superiority of the proposed method compared to previous works.

  • PDF

The Forecasting Model of the Repair Cost in Apartment Housing - Focused roof water proofing and Elevator work - (공동주택 공종별 수선비용 예측모델 연구 - 옥상방수 공사와 승강기 공사를 중심으로 -)

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • v.15 no.6
    • /
    • pp.63-68
    • /
    • 2015
  • Purpose: Most if buildings need various repair works for preventing or delaying the deterioration which gives rise to affect the living condition or function after constructed. Therefore, a long-term repair schedule should be planned and a repair cost is required. In this paper, it aimed at providing the statistical forecast model for a repair cost in roof water-proofing work and elevator work using statistical approach with three variables such as number of household, management area and a elapsed year. Data are collected in apartment housings which are located in Seoul area and conducted with interview and questionnaire sheet. Each analyzed work is divided into a partly work and fully work. Results of this study are shown that, first, the regression model takes a multiplying type like a Cobb-Douglas function and is changed into the log-linear type to include the three variable simultaneously. Second, the goodness-of-fit of the repair cost forecasting model has a good statistics in determinant's coefficient and Dubin-Watson value. Third, the management area is stronger factor than other the number of household and an elapsed year in roof water-proofing work and elevator work.

Repair Accumulation Cost for the Long-Term Repair Plan in Multifamily Housing Using the Forecasting Model of the Repair Cost (공종별 수선비용 추계모델을 활용한 공동주택 장기수선충당금 적립금액 산정)

  • Lee, Kang-Hee;Chae, Chang-U
    • KIEAE Journal
    • /
    • v.16 no.3
    • /
    • pp.137-143
    • /
    • 2016
  • Purpose: Apartment housing should conduct a cyclic repair to keep and maintain the building performance since they are constructed. Therefore, the repair plan would be provided for long term period which explains the repair time, items and repair cost. Residents of apartment housing are responsible to pay for the repair activities. For repair cost, residents would reserve the money for repair little by little continuously until the required repair time because the repair cost takes a big burden for residents and lots of money a time. But, there is no systematic approach to provide the long term repair cost because it is no proper forecast of the repair cost to the upcoming repair time. In this study, it aimed at providing the monthly accumulation of the long term repair cost with the survey data in Seoul. Method: For these, the surveyed data are classified into 6 categories and number of data are 1,918. In addition, it developed the repair cost model for the 24 repair works and the cumulation function which is reflected with the each cost model. Result: This study are shown as follows : First, among the various estimation for the repair cost, the power function has a goodness of fit in statistics. Second, the monthly accumulation would be 12,840 won/household in size of $100,000m^2$ management area and $81.7won/m^2$ in size of the 1,000 household number during 40 years.

A study on Conservation Works Trend of Architectural Heritage in Buddhism (불교건축문화재를 통한 보존공사경향 연구)

  • Cho, Hyun-Jung;Kim, Wang-Jik
    • Journal of architectural history
    • /
    • v.16 no.3
    • /
    • pp.39-56
    • /
    • 2007
  • This study is conservation works trend since 1900. Objects for study are National Treasures and Treasures in Buddhism, in wooden architecture. And researched about the factor of conservation works, roof and tile, painting and dissolution conservation works cycle by dissolution, timber change ratio. The factor of conservation works is the most, roof and tile. Conservation works cycle by dissolution is 12.8 years. Painting cycle is 16.3 years. There are two concepts of conservation works, that is restoration and preservation. There are many restoration before 1960's. To 1960's the preservation to be many to 1970's many Restoration. And since the end of 1970's is Preservation. These reasons are conservation works history of object, the rule for Heritage protection, people on works, and study of architecture. history.

  • PDF

A study on the correlation of tourism development with conservation activities in the 1930s through the repair work on the main building of J angansa temple (장안사 대웅전 보존 수리공사와 1930년대 금강산 개발 - 근대기 건축문화유산 보존과 관광지 개발의 영향관계 연구)

  • Seo, Hyowon
    • Journal of architectural history
    • /
    • v.29 no.3
    • /
    • pp.25-36
    • /
    • 2020
  • The purpose of this study was to analyze the correlation between conservation activities and the development of tourism in the modern period in the Korean peninsula. The main building of Jangansa Temple, located in Mt. Geumgang, was repaired in the 1930s. During the repairs, the Japanese General-Government actively engaged in the development of Mt. Geumgang and raised funds for the operation of the Korean Peninsula through tourism revenue. The repair work was carried out under the influence of the Mt. Geumgang development project. And its influence is revealed by reviewing official documents recording repair work. This study tried to clarify the relationship between development and repair work through official documents.