• 제목/요약/키워드: Repair time limit

검색결과 36건 처리시간 0.028초

Reliability assessment of concrete bridges subject to corrosion-induced cracks during life cycle using artificial neural networks

  • Firouzi, Afshin;Rahai, Alireza
    • Computers and Concrete
    • /
    • 제12권1호
    • /
    • pp.91-107
    • /
    • 2013
  • Corrosion of RC bridge decks eventually leads to delamination, severe cracking and spalling of the concrete cover. This is a prevalent deterioration mechanism and demands for the most costly repair interventions during the service life of bridges worldwide. On the other hand, decisions for repairs are usually made whenever the extent of a limit crack width, reported in routine visual inspections, exceeds an acceptable threshold level. In this paper, while random fields are applied to account for spatial variation of governing parameters of the corrosion process, an analytical model is used to simulate the corrosion induced crack width. However when dealing with random fields, the Monte Carlo simulation is apparently an inefficient and time consuming method, hence the utility of neural networks as a surrogate in simulation is investigated and found very promising. The proposed method can be regarded as an invaluable tool in decision making concerning maintenance of bridges.

공동주택의 장기수선계획을 위한 유지관리시스템 (Maintenance Management System for Long-range Planning of Apartment Buildings)

  • 이종균
    • KIEAE Journal
    • /
    • 제3권3호
    • /
    • pp.67-74
    • /
    • 2003
  • The repair and maintenance planning is the principal transaction to prevent from the degradation of apartment buildings to prolong their lives. Various building components as part of living area should be maintained properly and timely before critical defects are realized, then the building life might be extended until the limit of its usability. In other words, various building components such as utilities, finishes and structural members are needed to be repaired and replaced in different time interval after completion. To do this systematically, a maintenance management system for Long-Range Planning (LRP) needs developing. The LRP should be figured out based on the forecast of repairing and replacing cycle of building components according to work trades. And the precise forecast of repairing and replacing time of the components helps to enhance the usability of the developed system. The purpose of this paper is to suggest a system with which apartment building managers carry out the tasks of periodical check, diagnosis and replacement of building components based on the maintenance calendar. By using the system, they can easily forecast repairing and replacing time of the components with the consideration of life cycle of building materials and build the LRP.

교육시설의 옥상방수 열화도 진행 모델에 관한 연구 (A Study on the Establishment of the Deterioration Process Model of Roof Waterproofing in the Education facilities)

  • 이강희;채창우;류수훈
    • 교육시설 논문지
    • /
    • 제24권6호
    • /
    • pp.11-18
    • /
    • 2017
  • Education facilities have much affect to make a good condition for the learning environment. Therefore, various approaches have been conducted to improve the physical, social and educational achievement. Especially, the physical aspect is very important to get rid of the building defect and improve the student their learning environment. For these, it needs to explain the performance and function of components and materials, which is linked with the deterioration degree. The deterioration degree is a imperative factor to make a decision whether the component would be repaired or not and to provide the repair scope of its component. In this paper, it aimed at making the deterioration degree model of roof proof under the hypothesis of which deterioration degree would be equal the repair cost at this time. Results of the study are shown that first, the $3^{rd}$ function is most proper to explain the deterioration degree model among 11 functions in view of resulted statistics. Second, the inflection of deterioration is shown at 15yr of the elementary school and 13yr of the middle and high school. This study has a limit of disclassification of the component or materials and it is, therefore, favorable to include the classification of waterproof material and work. These results would make a change from the breakdown maintenance to preventive maintenance and give a decent the learning environment for student.

문화재수리 종합심사낙찰제·종합평가낙찰제 운영결과 및 낙찰률하락 원인 분석 (A Study for operation results of the comprehensive examination on tendering system in the cultural heritage repair and restoration, focusing on the cause of the decline in the winning bid rate)

  • 정영훈;윤현도
    • 헤리티지:역사와 과학
    • /
    • 제55권1호
    • /
    • pp.111-132
    • /
    • 2022
  • 2014년 불거진 숭례문 부실수리 논란에 대응하고자 문화재청은 2016년 문화재수리 종합심사낙찰제·종합평가낙찰제를 전격 도입하였다. 동 제도의 도입취지는 문화재수리업체에게 적정한 문화재수리비용을 제공하고 보다 나은 문화재수리 품질을 확보하고자 한 것이다. 이렇게 2016년부터 도입된 종합심사낙찰제·종합평가낙찰제는 운영된 지 벌써 5년이 넘어가고 있어 동 낙찰제도의 운영결과를 중간 점검하고 새로운 입찰제도의 도입취지인 수리이행능력이 높은 업체에게 적정한 대가를 보장한다는 목표가 현재 달성되고 있는지 확인할 필요가 있다. 이에 본 연구에서는 2016년부터 2020년까지 문화재수리 종합심사낙찰제·종합평가낙찰제로 입찰된 총 114개의 입찰사례를 위주로 통계적접근 등을 통해 분석하고자 하였다. 조사분석 기간 중 발주된 114건의 분석결과, 첫 번째로 수리이행능력이 높은 문화재수리업체 선정 여부에 대해서는 낙찰자의 과반수가 문화재수리능력평가액 순위 중 상위 20%에 위치해 있어 '수리이행능력이 좋은 문화재수리업체 선정'이라는 목표를 전반적으로 달성하였다고 판단된다. 두 번째로 적정한 대가가 보장되었는지에 대해 문화재수리 종합심사낙찰제·종합평가낙찰제의 도입취지와는 달리 2017년 86.847%에서 2020년 85.488%로 매년 낙찰률이 저하되고 있고, 문화재수리 종심제·종평제 대상의 94.7%가 속하는 50억원 미만의 문화재수리의 경우에는 예상되는 시설공사 적격심사 낙찰하한율 보다도 낙찰률이 낮아 이를 개선할 필요가 있을 것으로 판단된다. 세 번째로, 2019년 개정된 문화재수리 종합심사낙찰제·종합평가낙찰제 경제성평가 배점구조의 변화로 경제성 평가의 영향력 즉, 변별력이 더 강해졌음을 알 수 있다. 문화재수리 종합심사낙찰제·종합평가낙찰제 시행 이후 낙찰률 하락의 원인을 분석한 결과, 첫 번째로 투찰률이 매년 하락하는 추세인 '1등 초과 그룹'과 '1등 그룹'이 전체 투찰자 수의 과반 이상이기 때문이며, 둘째로 낙찰률을 상향시켜 주는 역할을 하는 '1등 초과 그룹' 내에서도 높은 투찰가격을 써낸 투찰자를 '1등 미만 그룹'의 균형가격 배제범위보다 상대적으로 많이 배제시키기 때문인 것으로 보인다 결론적으로 상위 투찰가격의 과도한 배제를 지양해야 하고, 시설공사 적격심사제도의 낙찰하한율과 같이 낙찰률 저하를 막아줄 장치가 필요하다.

A performance-based design method for chloride-induced cover cracking of RC structures

  • Yang, Dong-Hui;Yi, Ting-Hua;Li, Hong-Nan
    • Computers and Concrete
    • /
    • 제20권5호
    • /
    • pp.573-582
    • /
    • 2017
  • Chloride-induced cover cracking will aggravate the performance deterioration for RC structures under the chlorideladen environment, which may endanger the safety of structures and occupants. Traditional design method cannot ensure that a definite performance is satisfied. To overcome the defects, a study on the performance-based design method was carried out in this paper. Firstly, the limit state functions were established for the corrosion initiation and cover cracking. Thereafter, the uncertainty analysis was performed to study the effects of random factors on the time-dependent performances. Partial factor formulae were deduced through the first-order reliability method for performance verification. Finally, an illustrative example was presented and the sensitivity of cover depth to other parameters was carried out. It is found that the uncertainties of the random variables have great effects on the required cover depth. It is demonstrated that the performance-based design method can ensure that the target performance can be satisfied and support to formulate a rational maintenance and repair strategy for RC structures under the chloride environment.

접착 시스템이 수리된 복합 레진의 전단 결합 강도에 미치는 영향 (The effect of different bonding systems on shear bond strength of repaired composite resin)

  • 선은미;김현철;허복;박정길
    • Restorative Dentistry and Endodontics
    • /
    • 제33권2호
    • /
    • pp.125-132
    • /
    • 2008
  • 이 연구의 목적은 서로 다른 접착제들로 수리된 복합 레진의 전단 결합 강도를 비교하고, 접착 시스템이 복합레진의 수리 강도에 미치는 영향을 평가하기 위한 것이다. 40개의 복합 레진 시편 (Z-250)을 준비하였으며, 1주일 동안 열순환을 시행한 후, $50\;{\mu}m$ 알루미나 입자로 샌드 블라스팅 하였다. 이 시편들을 네 개의 그룹으로 나누었으며 (n = 10), 다음과 같은 서로 다른 종류의 접착제를 각각 적용하였다; SB 그룹 : Scotchbond multipurpose ; SE 그룹 : Clearfil SE bond ; XP 그룹 : XP bond ; XE 그룹 : Xeno III. 접착 과정을 완료한 후에, 새로운 레진 (Z-250, 3M ESPE)을 몰드에 적용하여, 광조사 하였다. 대조군으로, 접착 과정 없이 10개의 시편을 준비하였다. 7일 동안 열순환을 시행한 후 전단 결합 강도를 측정하였고, 파절 양상을 조사하였으며, 다음과 같은 결과를 얻었다. 1. 기존 복합 레진과 수리용 복합 레진 사이의 전단 결합 강도는 접착제 종류에 따른 유의한 차이를 보이지 않았다. 2. 재료의 응집 강도 (대조군)와 수리한 결합 강도 (실험군) 사이에 유의한 차이를 보이지 않았다. 3. 파절 양상은 대부분 응집성 파절 또는 혼합 파절을 보였다.

추계학적 확률과정을 이용한 경사제 피복재의 예방적 유지관리를 위한 조건기반모형 (Condition-Based Model for Preventive Maintenance of Armor Units of Rubble-Mound Breakwaters using Stochastic Process)

  • 이철응
    • 한국해안·해양공학회논문집
    • /
    • 제28권4호
    • /
    • pp.191-201
    • /
    • 2016
  • 추계학적 확률과정을 이용하여 경사제 피복재를 예방적으로 유지관리할 수 있는 조건기반모형을 개발하였다. 완전 보수보강 조건에서 가장 경제적으로 보수보강이 수행되어야 하는 최적의 시점을 결정할 수 있는 모형이다. 본 연구에서 개발된 RRP(Renewal Reward Process) 기반 경제성 모형은 이자율을 고려할 수 있을 뿐만 아니라 기존 연구에서 상수로 취급하던 비용을 시간에 따른 확률변수로 고려할 수 있다. 누적피해와 사용한계 그리고 구조물의 중요도를 모두 고려할 수 있는 함수식을 제시하여 ABM(Age-Based Maintenance)을 CBM(Condition-Based Maintenance)으로 쉽게 확장할 수 있게 하였다. 또한 함수식에 포함된 계수들을 수학적으로 산정할 수 있는 방법도 제시하였다. 두 가지 추계학적 확률과정, WP(Wiener Process)와 GP(Gamma Process)를 이용하여 경사제 사석재를 해석하였다. 사용한계, 이자율 그리고 구조물의 중요도에 따라 시간에 따른 기대총비용율을 산정하여 기대총비용율이 최소가 되는 예방적 유지관리의 최적 시점을 쉽게 추정할 수 있었다. 동일한 사용한계에서 이자율이 높을수록 최적시점은 늦어지고 그에 따라 기대총비용율도 낮아졌다. 또한 상대적으로 GP가 WP보다 더 보수적으로 최적시점을 예측하였다. 마지막으로 동일한 조건에서 구조물의 중요도가 높을수록 더 자주 예방적 보수보강을 실시하여야 한다는 것을 알았다.

교량 성능변화를 고려한 유지관리비용 추계분석 방법 개발 (Development of maintenance cost estimation method considering bridge performance changes)

  • 선종완;이후석;박경훈
    • 한국산학기술학회논문지
    • /
    • 제19권12호
    • /
    • pp.717-724
    • /
    • 2018
  • 사회기반시설물의 노후화에 따른 교량 유지관리비용의 급격한 증가에 대비하기 위해서는 미래 발생 가능한 유지관리비용의 예측이 선행되어야 한다. 이를 위해 본 논문에서는 교량 관리주체의 유지관리 현황 분석을 통해 교량의 관리수준을 파악하고, 이를 생애주기에 따른 목표관리수준과 성능향상 한계 값으로 모델링하였다. 이와 함께 교량 안전점수에 따른 보수보강비용 예측모델, 성능열화모델, 평균개축비용단가, 평균 개축시기로 구성된 기존의 비용 및 성능 예측모델과 연계하여, 교량 유지관리비용 추계분석을 위한 방법론 및 절차를 제안하였다. 제안된 방법의 활용성 검증을 위해 특정 관리주체가 관리하는 교량의 규모, 노후화 정도, 현재 관리현황을 고려하여 미래 유지관리비용 추계 분석을 수행하였다. 연차별로 개별 교량 수준의 안전등급과 유지관리 조치에 따른 비용 추정 결과와 이들을 관리주체 수준으로 합산하여 연차별 평균 안전점수, 안전등급 구성비, 점검진단비용, 보수보강비용, 개축비용을 합리적으로 추정할 수 있다. 향후 목표성능관리수준의 변경에 따른 생애주기 예산의 변화를 추정하여 최적의 관리수준을 제안할 수 있을 것으로 판단된다.

현대미술 개념의 보존 (Conservation in Contemporary Art)

  • 김겸
    • 한국문화재보존과학회:학술대회논문집
    • /
    • 한국문화재보존과학회 2005년도 제22회 학술대회 발표 논문집
    • /
    • pp.154-159
    • /
    • 2005
  • The most common conception of a work of art is as a unique object. In conservation the prevalent notion of authenticity is based on physical integrity, this guides judgements about loss. For the majority of traditional art objects, minimising change to the physical work means minimising loss, where loss is understood as compromising the (physical) integrity of a unique object, and this forms the focus of conservation. Fundamental to conservators' approach to the conservation of contemporary art is the notion that the artist's intent should guide conservators' practice. Since most of the artists creating installation art are living, it is possible to interview them about the details of the installation, attitudes to changing technology, parameters of acceptable change and their views about what aspects of the installation are essential to preserve. Conservation is no longer focused on intervening to repair the art object but has become concerned with documentation and determining what change is acceptable and managing those changes. In order to accurately install works in the future it is necessary to broaden our focus to include elements of an installation that affect the viewer's experience. This might mean documenting the space, the acoustics, the balance of the different channels of sound, the light levels and the way one enters and leaves the installation. These are as important as the more tangible or material elements in the conservation of the work. It is also necessary to work with industry and specialists outside the field of conservation to develop new skills to preserve and manage new types of objects in our care. We can also document the less tangible details of an installation such as the light levels, the character of the sound etc. This is a new area of conservation and as a profession our understanding and knowledge will deepen with time. All of these strategies work together to help to limit the risk of not being able to accurately install these works in the future. Deciding what can be changed and how to best care for any element of an installation will depend on its meaning and role. For both contemporary and traditional objects such decisions are documented by conservators and although the focus of the conservator may have moved away from the material object, the approach is still rooted in traditional notions of collection care.

  • PDF

펄스 신호 및 절연저항 측정 알고리즘을 이용한 전동기 열화 추정 (Estimation of Motor Deterioration using Pulse Signal and Insulation Resistance Measurement Algorithm)

  • 정성인
    • 한국인터넷방송통신학회논문지
    • /
    • 제22권5호
    • /
    • pp.111-116
    • /
    • 2022
  • 전동기 소손의 원인으로는 과부하, 결상, 구속, 층간단락, 권선의 지락, 순간과전압의 유입, 회전자가 고정자에 닿는 경우 등 절연파괴로 이어져 고장 또는 전기 사고로 이어지고 있다. 따라서 기기 고장은 기기의 보수/수리에 필요한 비용에 의한 손실뿐만 아니라, 전동기가 포함된 공정 자체를 멈추기 때문에 공정 정지에 따른 생산성 저하에 의한 막대한 경제적 손실을 초래한다. 전동기의 고장을 진단하기 위한 현재의 기술의 수준은 진동, 열, 전력분석 방식을 이용하고 있지만, 고장에 따른 상당 부분의 시간이 진행되어야 문제점을 분석할 수 있는 한계점을 가지고 있다. 따라서 본 논문에서는 이러한 문제점을 해결하고자 DC AMP 신호를 이용하여 절연저항을 측정하는 장치 및 알고리즘을 산업용 전동기에 적용하여 절연저항 상태값을 추종하여 기존방식에서 해결되지 못한 전동기의 열화 및 고장 진단을 제안한다.