• Title/Summary/Keyword: Repair time limit

Search Result 36, Processing Time 0.028 seconds

Reliability assessment of concrete bridges subject to corrosion-induced cracks during life cycle using artificial neural networks

  • Firouzi, Afshin;Rahai, Alireza
    • Computers and Concrete
    • /
    • v.12 no.1
    • /
    • pp.91-107
    • /
    • 2013
  • Corrosion of RC bridge decks eventually leads to delamination, severe cracking and spalling of the concrete cover. This is a prevalent deterioration mechanism and demands for the most costly repair interventions during the service life of bridges worldwide. On the other hand, decisions for repairs are usually made whenever the extent of a limit crack width, reported in routine visual inspections, exceeds an acceptable threshold level. In this paper, while random fields are applied to account for spatial variation of governing parameters of the corrosion process, an analytical model is used to simulate the corrosion induced crack width. However when dealing with random fields, the Monte Carlo simulation is apparently an inefficient and time consuming method, hence the utility of neural networks as a surrogate in simulation is investigated and found very promising. The proposed method can be regarded as an invaluable tool in decision making concerning maintenance of bridges.

Maintenance Management System for Long-range Planning of Apartment Buildings (공동주택의 장기수선계획을 위한 유지관리시스템)

  • Lee, Jong-Kyoon
    • KIEAE Journal
    • /
    • v.3 no.3
    • /
    • pp.67-74
    • /
    • 2003
  • The repair and maintenance planning is the principal transaction to prevent from the degradation of apartment buildings to prolong their lives. Various building components as part of living area should be maintained properly and timely before critical defects are realized, then the building life might be extended until the limit of its usability. In other words, various building components such as utilities, finishes and structural members are needed to be repaired and replaced in different time interval after completion. To do this systematically, a maintenance management system for Long-Range Planning (LRP) needs developing. The LRP should be figured out based on the forecast of repairing and replacing cycle of building components according to work trades. And the precise forecast of repairing and replacing time of the components helps to enhance the usability of the developed system. The purpose of this paper is to suggest a system with which apartment building managers carry out the tasks of periodical check, diagnosis and replacement of building components based on the maintenance calendar. By using the system, they can easily forecast repairing and replacing time of the components with the consideration of life cycle of building materials and build the LRP.

A Study on the Establishment of the Deterioration Process Model of Roof Waterproofing in the Education facilities (교육시설의 옥상방수 열화도 진행 모델에 관한 연구)

  • Lee, Kang-Hee;Chae, Chang-U;Ryu, Soo-Hoon
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.24 no.6
    • /
    • pp.11-18
    • /
    • 2017
  • Education facilities have much affect to make a good condition for the learning environment. Therefore, various approaches have been conducted to improve the physical, social and educational achievement. Especially, the physical aspect is very important to get rid of the building defect and improve the student their learning environment. For these, it needs to explain the performance and function of components and materials, which is linked with the deterioration degree. The deterioration degree is a imperative factor to make a decision whether the component would be repaired or not and to provide the repair scope of its component. In this paper, it aimed at making the deterioration degree model of roof proof under the hypothesis of which deterioration degree would be equal the repair cost at this time. Results of the study are shown that first, the $3^{rd}$ function is most proper to explain the deterioration degree model among 11 functions in view of resulted statistics. Second, the inflection of deterioration is shown at 15yr of the elementary school and 13yr of the middle and high school. This study has a limit of disclassification of the component or materials and it is, therefore, favorable to include the classification of waterproof material and work. These results would make a change from the breakdown maintenance to preventive maintenance and give a decent the learning environment for student.

A Study for operation results of the comprehensive examination on tendering system in the cultural heritage repair and restoration, focusing on the cause of the decline in the winning bid rate (문화재수리 종합심사낙찰제·종합평가낙찰제 운영결과 및 낙찰률하락 원인 분석)

  • JUNG, Younghun;YUN, Hyundo
    • Korean Journal of Heritage: History & Science
    • /
    • v.55 no.1
    • /
    • pp.111-132
    • /
    • 2022
  • The comprehensive examination on tendering system has been introduced to the Cultural Heritage repair and restoration field since 2016 to remedy the repair issues of South Gate in 2014. The Cultural Heritage Administration tried to attain the high performance of the cultural heritage repair and restoration works securing the proper payment for the repair and restoration works. It is high time to review the operating performance of the comprehensive examination on tendering system (hereinafter referred to as the "CEOTS"), as the system has been run for over 5 years to correspond with its original goal, i.e., "The Proper Payment in return for the High Performance of Repair and Restoration works." This study intends to analyze 114 tenders of CEOTS from 2016 to 2020. As a result of the analysis of 114 tenders, firstly, more than half of bid winners were in the top 20% of repair & restoration capacity disclosure amount list, which mostly fulfilled the goal of 'attaining high performance.' Secondly, as the winning bid rate is decreasing from 86.847% in 2017 to 85.488% in 2020, the goal of 'guarantee of a proper payment' is not achieved yet. Thirdly, the influence of Economic Evaluation section in CEOTS has been grown since the change of scoring system in CEOTS in 2019. This study identifies two reasons why the winning bid rate of CEOTS has decreased. Firstly, it is caused by the fact that 'the group that got more than 1st place' and 'the first place group' that are more than half of the total bidders have the decreasing bidding rate trend as the years go by. Secondly, the exclusion rate of 'the group that got more than 1st place' is higher than the exclusion rate of 'the group that got less than 1st place', which means the expected winning rate would be lowered. It is proposed that the revision of CEOTS code is needed, i.e. easing the strict rule concerning the exclusion rate as well as setting up the lower bidding limit to prevent the excessive decreasing winning bid rate.

A performance-based design method for chloride-induced cover cracking of RC structures

  • Yang, Dong-Hui;Yi, Ting-Hua;Li, Hong-Nan
    • Computers and Concrete
    • /
    • v.20 no.5
    • /
    • pp.573-582
    • /
    • 2017
  • Chloride-induced cover cracking will aggravate the performance deterioration for RC structures under the chlorideladen environment, which may endanger the safety of structures and occupants. Traditional design method cannot ensure that a definite performance is satisfied. To overcome the defects, a study on the performance-based design method was carried out in this paper. Firstly, the limit state functions were established for the corrosion initiation and cover cracking. Thereafter, the uncertainty analysis was performed to study the effects of random factors on the time-dependent performances. Partial factor formulae were deduced through the first-order reliability method for performance verification. Finally, an illustrative example was presented and the sensitivity of cover depth to other parameters was carried out. It is found that the uncertainties of the random variables have great effects on the required cover depth. It is demonstrated that the performance-based design method can ensure that the target performance can be satisfied and support to formulate a rational maintenance and repair strategy for RC structures under the chloride environment.

The effect of different bonding systems on shear bond strength of repaired composite resin (접착 시스템이 수리된 복합 레진의 전단 결합 강도에 미치는 영향)

  • Seon, Eun-Mi;Kim, Hyeon-Cheol;Hur, Bock;Park, Jeong-Kil
    • Restorative Dentistry and Endodontics
    • /
    • v.33 no.2
    • /
    • pp.125-132
    • /
    • 2008
  • The purpose of this study is to compare the shear bond strength of repaired composite resin with different bonding agents and evaluate the effect of bonding agents on composite repair strength. Forty composite specimens (Z-250) were prepared and aged for 1 week by thermo cycling between 5 and $55^{\circ}C$ with a dwell time of 30s. After air abrasion with $50\;{\mu}m$ aluminum oxide, following different bonding agents were applied (n = 10); SB group: Scotchbond multipurpose adhesive (3 step Total-Etch system); XE group: Clearfil SE bond (2 step Self-Etch system); XP group: XP bond (2 step Total-Etch system); XE group: Xeno III (1 step Self-Etch system). After bonding procedure was completed, new composite resin (Z-250) was applied to the mold and cured. For control group. 10 specimens were prepared. Seven days after repair, shear bond strength was measured. Data was statistically analyzed using one-way ANOVA and Tukey's test (p<0.05). The means and standard deviations of shear bond strength (MPa ${\pm}$ S.D.) per group were as follows: SB group: 17.06; SE group: 19.10; XP group: 14.44; XE group: 13.57; Control Group: 19.40. No significant difference found in each group. Within the limit of this study, it was concluded that the different type of bonding system was not affect on the shear bond strength of repaired composite resin.

Condition-Based Model for Preventive Maintenance of Armor Units of Rubble-Mound Breakwaters using Stochastic Process (추계학적 확률과정을 이용한 경사제 피복재의 예방적 유지관리를 위한 조건기반모형)

  • Lee, Cheol-Eung
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.28 no.4
    • /
    • pp.191-201
    • /
    • 2016
  • A stochastic process has been used to develop a condition-based model for preventive maintenance of armor units of rubble-mound breakwaters that can make a decision the optimal interval at which some repair actions should be performed under the perfect maintenance. The proposed cost model in this paper based on renewal reward process can take account of the interest rate, also consider the unplanned maintenance cost which has been treated like a constant in the previous studies to be a time-dependent random variable. A function for the unplanned maintenance cost has been mathematically proposed so that the cumulative damage, serviceability limit and importance of structure can be taken into account, by which a age-based maintenance can be extended to a condition-based maintenance straightforwardly. The coefficients involved in the function can also be properly estimated using a method expressed in this paper. Two stochastic processes, Wiener process and gamma process have been applied to armor stones of rubble-mound breakwaters. By evaluating the expected total cost rate as a function of time for various serviceability limits, interest rates and importances of structure, the optimal period of preventive maintenance can easily determined through the minimization of the expected total cost rate. For a fixed serviceability limit, it shows that the optimal period has been delayed while the interest rate increases, so that the expected total cost rate has become lower. In addition, the gamma process tends to estimate the optimal period more conservatively than the Wiener process. Finally, it is found that the more crucial the level of importance of structure becomes, the more often preventive maintenances should be carried out.

Development of maintenance cost estimation method considering bridge performance changes (교량 성능변화를 고려한 유지관리비용 추계분석 방법 개발)

  • Sun, Jong-Wan;Lee, Huseok;Park, Kyung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.717-724
    • /
    • 2018
  • To prepare for the explosive increase in maintenance costs of bridges according to the aging of infrastructure, future maintenance costs of bridges should be predicted. For this purpose, the management status of bridges was investigated and modeled as the upper limit of the performance level and the target management level according to the life cycle. This paper proposes methodologies and procedures for estimating the bridge maintenance costs using two models and existing cost and performance prediction models that consist of unit repair cost model according to the safety score, performance degradation model of bridges, unit reconstruction cost, and average reconstruction time. To verify the applicability, future maintenance costs can be forecasted for specific management agency considering the number of bridges, degree of aging, and current management status. As a result, it is possible to obtain the maintenance cost and safety level of an individual bridge level for each year. In addition, by summing them up to the agency level, the average safety score, ratio of the safety level, inspection costs, repair costs, and reconstruction costs can be obtained. In a further study, the changes in maintenance costs can be analyzed according to the changes in the target management levels using the developed method. The optimal management level can be suggested by reviewing the results.

Conservation in Contemporary Art (현대미술 개념의 보존)

  • Kim Ken
    • 한국문화재보존과학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.154-159
    • /
    • 2005
  • The most common conception of a work of art is as a unique object. In conservation the prevalent notion of authenticity is based on physical integrity, this guides judgements about loss. For the majority of traditional art objects, minimising change to the physical work means minimising loss, where loss is understood as compromising the (physical) integrity of a unique object, and this forms the focus of conservation. Fundamental to conservators' approach to the conservation of contemporary art is the notion that the artist's intent should guide conservators' practice. Since most of the artists creating installation art are living, it is possible to interview them about the details of the installation, attitudes to changing technology, parameters of acceptable change and their views about what aspects of the installation are essential to preserve. Conservation is no longer focused on intervening to repair the art object but has become concerned with documentation and determining what change is acceptable and managing those changes. In order to accurately install works in the future it is necessary to broaden our focus to include elements of an installation that affect the viewer's experience. This might mean documenting the space, the acoustics, the balance of the different channels of sound, the light levels and the way one enters and leaves the installation. These are as important as the more tangible or material elements in the conservation of the work. It is also necessary to work with industry and specialists outside the field of conservation to develop new skills to preserve and manage new types of objects in our care. We can also document the less tangible details of an installation such as the light levels, the character of the sound etc. This is a new area of conservation and as a profession our understanding and knowledge will deepen with time. All of these strategies work together to help to limit the risk of not being able to accurately install these works in the future. Deciding what can be changed and how to best care for any element of an installation will depend on its meaning and role. For both contemporary and traditional objects such decisions are documented by conservators and although the focus of the conservator may have moved away from the material object, the approach is still rooted in traditional notions of collection care.

  • PDF

Estimation of Motor Deterioration using Pulse Signal and Insulation Resistance Measurement Algorithm (펄스 신호 및 절연저항 측정 알고리즘을 이용한 전동기 열화 추정)

  • Jeong, Sungin
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.22 no.5
    • /
    • pp.111-116
    • /
    • 2022
  • The causes of motor burnout include overload, phase loss, restraint, interlayer short circuit, winding ground fault, instantaneous overvoltage, and the rotor contacting the stator, leading to insulation breakdown, leading to breakdown or electrical accidents. Therefore, equipment failure causes not only loss due to cost required for equipment maintenance/repair, but also huge economic loss due to productivity decrease due to process stop because the process itself including the motor is stopped. The current level of technology for diagnosing motor failures uses vibration, heat, and power analysis methods, but there is a limit to analyzing the problems only after a considerable amount of time has passed according to the failure. Therefore, in this paper, a device and algorithm for measuring insulation resistance using DC AMP signal was applied to an industrial motor to solve this problem. And by following the insulation resistance state value, we propose a diagnosis of deterioration and failure of the motor that cannot be solved by the existing method.