• Title/Summary/Keyword: Repair and Replacement Cost

Search Result 133, Processing Time 0.021 seconds

Reliability-based Life Cycle Cost Analysis for Optimal Seismic Upgrading of Bridges

  • Alfredo H-S. Ang;Cho, Hyo-Nam;Lim, Jong-Kwon;An, Joong-San
    • Computational Structural Engineering : An International Journal
    • /
    • v.1 no.1
    • /
    • pp.59-69
    • /
    • 2001
  • This study is intended to propose a systematic approach for reliability-based assessment of life cycle cost (LCC) effectiveness and economic efficiency for cost-effective seismic upgrading of existing bridges. The LCC function is expressed as the sum of the upgrading cost and all the discounted life cycle damage costs, which is formulated as a function of the Park-Ang damage index and structural damage probability. The damage costs are expressed in terms of direct damage costs such as repair/replacement costs, human losses and property damage costs, and indirect damage costs such as road user costs and indirect regional economic losses. For dealing with a variety of uncertainties associated with earthquake loads and capacities, a simulation-based reliability approach is used. The SMART-DRAIN-2DX, which is a modified version of the well-known DRAIN-2DX, is extended by incor-porating LCC analysis based on the LCC function developed in the study. Economic efficiencies for optimal seismic upgradings of the continuous PC segmental bridges are assessed using the proposed LCC functions and benefit-cost ratio.

  • PDF

A Production and Preventive Maintenance Policy with Two Types of Failures (두 가지 고장형태를 고려한 생산 및 예방보전 정책)

  • 김호균;조형수
    • Journal of Korean Society for Quality Management
    • /
    • v.30 no.3
    • /
    • pp.53-65
    • /
    • 2002
  • This paper studies an economic manufacturing quantity (EMQ) model with two types of failures and planned preventive maintenance of the production facility. One is a type I (major) failure which should be corrected by a failure maintenance and the other is a type H (minor) failure which can be minimally repaired without interrupting the production run. The objective is to determine the lot size and preventive replacement policy minimizing the long-run expected cost per unit time. We consider a control policy with a constant production lot size and preventive maintenance after completing n production runs. It is assumed that both preventive and failure maintenance times are random and the demand arriving during a stock-out period is lost. An expression for the expected cost per unit time is obtained in the general case. A special case is discussed and numerical results are provided.

RELIABILITY-BASED COMPONENT DETERIORATION MODEL FOR BRIDGE LIFE-CYCLE COST ANALYSIS

  • Rong-yau Huang;Wen-zheng Hsu
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.386-397
    • /
    • 2007
  • One major development in bridge life cycle cost analysis (LCCA) in recent years is to develop deterioration model for bridge components so that the times of repair/replacement throughout a component's life span can be properly determined. Taiwan also developed her own bridge LCCA model in 2003, integrating with the bridge inspection database in the local bridge management system (T-BMS). Under the framework of the local LCCA model, this study employs the reliability method in developing a deterioration model of bridge components. A component deteriorates through time in its reliability, which represents the probability of a component's condition index exceeds a user specified threshold. Model assumptions and rationale are described in the paper. The steps for applying the developed model are explained in detail. Results and findings are reported.

  • PDF

Reliability growth management for the delayed fixes and development cost in the reliability growth development phase (신뢰성 성장 개발단계에서 지연수정과 개발시험비용을 고려한 신뢰성 성장관리)

  • Kim, Jun-Hong;Jung, Won
    • Journal of Applied Reliability
    • /
    • v.5 no.3
    • /
    • pp.381-391
    • /
    • 2005
  • The level of reliability attained largely depends upon the investment in reliability growth programs during development phase. In order to find the relationship between reliability growth test time and BRTE(basic reliability tasks effectiveness) in a reliability improvement program that minimizes LCC in which contains the reliability growth cost, repair and replacement costs, and spare parts ordering costs in service with given service rate in management policy, the growth rate has been suggested proper LCC versus growth rate. This model employs the reliability growth projection with delayed fixes in avionic equipment based on AMSAA.

  • PDF

Optimum Life-Cycle Cost-Effective Seismic Design for Continuous PSC Bridges Considering Lifetime Expected Seismic Risks (구조 수명간 지진위험도를 고려한 연속 PSC교의 LCC 최적 내진설계)

  • Cho Hyo Nam;Lee Kwang Min;Park Kyung Hoon;Kim Pyung Seok
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.05a
    • /
    • pp.720-723
    • /
    • 2004
  • This study is intended to propose a systematic approach for determining optimum Life-Cycle Cost (LCC)-effective seismic design for continuous PSC bridges considering lifetime expected seismic risks. In the paper, a set of cost function for LCC analysis of bridges is proposed. The total LCC functions consist of initial cost and direct/indirect damage costs considering repair/replacement costs, human losses and property damage costs, road user costs, and indirect socio-economic losses. The damage costs are expressed in terms of Park-Ang median global damage indices (Park and Ang, 1985) and lifetime damage probabilities. The proposed approach is applied to model bridges of both moderate seismicity regions like Korea and high seismicity regions like Japan. Since, in case of bridges, a number of parameters may have an influence on optimal target reliability, various sensitivity analyses are performed in this study. It may be expected that the proposed approach can be effectively utilized for the development of cost-effective performance criteria for design and upgrading of various types of bridges as well as continuous PC bridges.

  • PDF

Warranty Cost Models for a Product Subject to Two Types of Failure (두 가지 고장(故障) 형태(形態)를 가진 제품(製品)에 대한 보증비용(保證費用) 모형(模型))

  • Bae, Do-Seon;Kim, Su-Myeong
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.14 no.2
    • /
    • pp.81-90
    • /
    • 1988
  • This paper is concerned with warranty cost models for a product with two types of failure ; type 1 failures corrected by minimal repair and type 2 failures removed only by replacement. Two warranty policies involving an initial free service period followed by a pro-rata period are considered ; the difference is whether the warranty is renewed or not when type 2 failure occures during its free service period. Expected warranty costs under the two policies are obtained, and their behaviors are examined for the case where type 1 and 2 failure distributions are Weibull and exponential, respectively.

  • PDF

Warranty Servicing Cost Analysis Using Phase-Type Lifetime Distributions (Phase-Type 분포를 이용한 보증서비스 비용 분석)

  • 김호균;백천현;조형수
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.25 no.3
    • /
    • pp.41-48
    • /
    • 2000
  • We consider the question of warranties for repairable items. During the warranty period, each time an item fails the manufacturer has the obligation to restore the item to operational condition either by repairing the item or by replacing it by a new item. In this paper, we consider a warranty policy for making this decision based on the condition of the failed item. For products with phase-type lifetime distributions where the phases represent the condition of the item, we develop algorithms to determine the expected cost of servicing a warranty and use it in making the repair/replacement decision. illustrative numerical examples are presented.

  • PDF

Demolition and Maintenance/Repair Cost Estimation of Road Drop Obstacle for Safety Risk Removal of Anti-tank Defense Facility (대전차 방어시설의 안전위해요소 제거를 위한 낙석 장애물 철거 및 유지보수 비용 산정 연구)

  • Yoo, Yang-Soo;Park, Young Jun;Eun, Hee-Chang;Baek, Jang-Woon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.4
    • /
    • pp.375-382
    • /
    • 2020
  • Rock drop obstacles on major roads in the border area in South Korea has been installed and operated to prevent and block the movement of enemy units. However, the increase in traffic volume due to the development of the border region causes many problems such as road traffic congestion due to rock drop, traffic safety, and impaired urban aesthetics. Therefore, this study aimed to provide guidelines for demolition and replacement facility installation for rock drop obstacles, which are differently applied to each unit, and to suggest the direction of the Ministry of National Defense's policy regarding maintenance cost for necessary rock drop obstacles required for operation. In this study, as part of a guideline study on the removal of rock drop obstacles and the installation of alternative facilities, a standard unit price was suggested for essential rock drop obstacles, so as to be used as judgment data when deciding whether to remove rock drop obstacles.

Economic Analysis with Development of Rapid Setting Alumina-based Binder for Road Repair (알루미나계열 속경성 도로 보수재료 개발에 따른 경제성 분석)

  • Yang, Hee-Jun;Yang, Min-Jae;Hong, Sung-In;Ann, Ki-Yong
    • Journal of the Korea Concrete Institute
    • /
    • v.29 no.1
    • /
    • pp.3-10
    • /
    • 2017
  • In case of Korea highways, about 60% of highways are paved by concrete and more than 50% of them were repaired due to reduction in required performance such as damage in pave or joint and delamination of cover pavement. However, repairing old material in such structure generally costs a lot of money and induces difficulty in maintenance. Thus, enhanced material for ensuring economic efficiency should be developed. The present study designed concrete mixtures with 3 levels of replacement using OPC (0, 10, 20%) in calcium aluminate cement and to evaluate material performance for load pavement, experimental works for setting time, compressive strength and flexural strength were carried out on those materials. As a result, 20% replacement for OPC was determined as an optimized material in terms of required physical performance and its unit price. Moreover, to determine cost in load pavement economy analysis using a program (CA4PRS) was conducted with widely used paving materials. Result showed that application for 20% replacement for OPC was the most efficient in economical aspect, arising from 4.052 and 1.577 billion won for total construction and user cost, respectively.

On determining a non-periodic preventive maintenance schedule using the failure rate threshold for a repairable system

  • Lee, Juhyun;Park, Jihyun;Ahn, Suneung
    • Smart Structures and Systems
    • /
    • v.22 no.2
    • /
    • pp.151-159
    • /
    • 2018
  • Maintenance activities are regarded as a key part of the repairable deteriorating system because they maintain the equipment in good condition. In practice, many maintenance policies are used in engineering fields to reduce unexpected failures and slow down the deterioration of the system. However, in traditional maintenance policies, maintenance activities have often been assumed to be performed at the same time interval, which may result in higher operational costs and more system failures. Thus, this study presents two non-periodic preventive maintenance (PM) policies for repairable deteriorating systems, employing the failure rate of the system as a conditional variable. In the proposed PM models, the failure rate of the system was restored via the failure rate reduction factors after imperfect PM activities. Operational costs were also considered, which increased along with the operating time of the system and the frequency of PM activities to reflect the deterioration process of the system. A numerical example was provided to illustrate the proposed PM policy. The results showed that PM activities performed at a low failure rate threshold slowed down the degradation of the system and thus extended the system lifetime. Moreover, when the operational cost was considered in the proposed maintenance scheme, the system replacement was more cost-effective than frequent PM activities in the severely degraded system.