• Title/Summary/Keyword: Repair Rate

Search Result 763, Processing Time 0.032 seconds

Fatigue Behavior of Cracked Al 6061-T6 Alloy Structures Repaired with Composite Patch

  • Yoon, Young-Ki;Park, Jong-Joon;Kim, Guk-Gi;Yoon, Hi-Seak
    • International Journal of Precision Engineering and Manufacturing
    • /
    • v.2 no.3
    • /
    • pp.5-10
    • /
    • 2001
  • Due to the development of high-strength fibers and adhesives, it is now possible to repair cracked metallic plates by bonding reinforced patches to the plate over the crack. In this study, pre-cracked aluminum 6061-T6 alloy plates repaired with bonded carbon/epoxy composite patch are applied to investigate the effect of various patch shapes on the tensile strength and the fatigue behavior of the structure. A non-patch-boned cased and 2 type-50$\times$50, 40$\times$20 mm-composite patch-bonded cases were tested to obtain fracture loads and fatigue crack growth rate. The results showed that the patch-bonded repair improves the static strength by 17% and the fatigue life by 200% compared to non-repaired case. It means that patch-boned repair is more effective in the fatigue life. It was also revealed that the patching method along crack growth direction is more efficient in cost and weight reduction. By observing the fractography, patch-bonded repair specimens demonstrated zigzag fracture patterns compared with the non-patched specimens, which shows a typical ductile fracture.

  • PDF

Treatment of Acute Achilles Tendon Rupture (급성 아킬레스건 파열의 치료)

  • Lee, Tae Hoon;Kim, Hak Jun;Jeon, Young Sik
    • Journal of Korean Foot and Ankle Society
    • /
    • v.19 no.3
    • /
    • pp.77-80
    • /
    • 2015
  • Acute Achilles tendon rupture is a frequent injury during sports and recreational activities. Treatments for Achilles tendon rupture have been controversial in recent decades. Traditionally the surgical treatment had benefit over nonsurgical treatment in terms of low rerupture rate and early functional restoration. Recently, nonsurgical treatment was found to show no statistically significant inferiority in re-rupture rate, functional outcome, and calf strength. Whereas, surgical treatment had some complications including adhesion, nerve injury, and infection. Nonsurgical treatment has been increasing due to functional rehabilitation with early weight bearing and restricted early motion. It focuses more attention on the course of caring for patients with deep discussion. There are open repair and minimally invasive repair in terms of surgical treatment. There are various techniques for minimally invasive repair of Achilles tendon, which has some advantages over the open repair. However, the optimal technique for minimally invasive repair has not been established. The number of suture strands is important regardless of suture technique.

A Study on the Evaluation of Competitiveness and Economic Feasibility of Ship Repair Industry in Korea (우리나라 수리조선의 경쟁력 및 경제성 평가에 관한 연구)

  • Kim, Dug-Sup;Shin, Sang-Hoon;Shin, Yong-John
    • Journal of Korea Port Economic Association
    • /
    • v.38 no.3
    • /
    • pp.69-86
    • /
    • 2022
  • This study analyses the necessity of the large-size shipyard and explores competitiveness factors of it. Furthermore, the competitiveness is evaluated and the economic feasibility of building and operation of shipyard is examined. As a result of AHP analysis of the determining factors of the competitiveness of the repairing shipyard, the importance of the factors was found in the order of arrival and departure safety, repair technology, dock and wharf facilities, repair cost, repair period (on time delivery), and repair parts supply. Moving distance, repair service quality, repair parts supply, arrival and departure safety, repair technology, dock and quay wall facilities, and repair period (on time delivery) were identified as key factors in the AHP analysis for competitiveness of the Busan Port repair shipyard to be built in the future. As a result of the analysing economic feasibility, the net present value of the Busan Port repair shipyard construction and operation investment project was KRW 435.6 billion, and the internal rate of return was 9.8%, higher than the social discount rate (4.5%), and the cost-benefit ratio (B/C) was high at 1.167. As a result of the study, the necessity and economic feasibility of the Busan Port repair shipyard are sufficiently ensured, and the competitiveness assessment was highly positive.

Replacement Policies Based on System Age and Random Repair Cost under Imperfect Repair

  • Yun, Won Young
    • Journal of Korean Society for Quality Management
    • /
    • v.18 no.2
    • /
    • pp.1-8
    • /
    • 1990
  • Replacement policies based on both the system age and the random repair cost are studied. The system is replaced when it reaches age T (Policy A), or when it fails for the first time after age T (Policy B). If the system fails before age T, the repair cost is estimated and repair is then undertaken if the estimated cost is less than a predetermined limit L ; otherwise, the system is replaced. After repair, the system is as good as new with probability (1-p) or is as good as old with probability P. The expected cost rate is obtained, its behavior is examined, and way of obtaining optimal T and L is explored.

  • PDF

A study on the optimized requirement estimation of K-1 tank repair parts (K-1전차 수리부속 최적소요산정에 관한 연구)

  • 김희철;최석철
    • Journal of the military operations research society of Korea
    • /
    • v.26 no.2
    • /
    • pp.39-54
    • /
    • 2000
  • This research is carried out solving problem of reduction in the rate of operation for the k-1 tank in order to increase the availability, caused by the delay in supply of k-1 tank repair parts in field operations. In other words, the study aims to find the most suitable requirement estimate pattern for the main repair parts that are used for k-1 tank. This study intends to present the most suitable requirement estimate pattern for k-1 trank repair pats by comparing the results of repair parts consumption data in relation to their pattern created by the programs of the requirement estimate technique(moving average method) currently used in the Army and adaptive exponential smoothing model. The results of this study numerically proved that the adaptive exponential smoothing model is the most appropriate technique in estimating the requirement for k-1 tank repair parts.

  • PDF

A Study on the Repair Time of the Construction Type in the Apartment Housings (공동주택 공종별 수선시기 설정 연구)

  • Lee, Kang-Hee;Park, Geun-Soo;Chae, Chang-U
    • Journal of the Korean housing association
    • /
    • v.22 no.4
    • /
    • pp.83-92
    • /
    • 2011
  • Apartment is settled down as a main housing type and massive supply has been conducted since 1990's. The government has focused on the housing supply to improve the housing number and cut its price. On the contrary, the management of the housing has been neglected to get an early deterioration. Since 1995's, various ways have been made to improve and maintain the building function and performance. Among these, the long-term repair plan has played a main role to manage the housing condition and plan the repair schedule for preparing the massive cost of repair such as a roof proof, elevator change. The long-tern repair plan provides the repair time and repair rate according to various construction types. Most of the management agent apply the repair standard into the field area. But the repair time could not reflect the present condition and bring into the wrong maintenance. Therefore, the repair time for the long-term maintenance plan would be revised and reflected from the material and technology development. |n this study, it aimed at improvement for the repair time in various construction types which are provided in the long-term repair plan. For this, the 22 management agents are surveyed directly. This study shows that the repair time of the painting are correspondent to the repair time of the long-term plan irregardless of the painting materials. Most of other areas would correspondently similar to the long-term plan. This study could not include the building location, material and other haracteristics. Therefore, the further study would be needed to reflect the building and materials attributes to get the detailed repair time.

Optimal Preventive Replacement Policies for a Change of Operational Environment (사용환경의 변화에 대한 최적예방교환정책)

  • Kong, M.B.
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.21 no.4
    • /
    • pp.507-517
    • /
    • 1995
  • The failure rate of an item depends on operational environment. When an item has a chance failure period and a wearout failure period in sequel, the severity of operational environment causes the increase in the slop of wearout failure rate or the increase in the magnitude of chance failure rate. For such a change of operational environment, this paper concerns the change of optimal preventive replacement time. Two preventive replacement policies, age replacement policy and periodic replacement policy with minimal repair, are considered. Investigated properties are: (a) in age replacement policy, optimal preventive replacement time increases as the chance failure rate increases and optimal preventive replacement time decreases as the slope of wearout failure rate increases, and (b) in periodic replacement policy with minimal repair, optimal preventive replacement time increases as the slope of wearout failure rate increases; however, the change of chance failure rate does not alter the optimal preventive replacement time.

  • PDF

Analysis of Defect Repair Cost by Work Type based on Defect Inspection of Apartments (공동주택의 하자진단에 기초한 공종별 하자보수비용의 분석)

  • Lee, Jin-Eung;Kim, Byung-Yun;Jeong, Byung-Joo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.5
    • /
    • pp.491-500
    • /
    • 2015
  • This study investigated defect status by work type, based on the report data of defect inspection results, acquired by consumers' request to safety inspection agencies, before the expiration of legal defect repair warranty period. In fact, the data was not acquired by centering on suppliers, namely, construction companies in relation with the defects becoming causes to increase construction cost of apartments. This study aims to provide objective and basic data for quality improvement at construction stage and for solution to defect disputes. The study results are presented below: (1) The number of defect cases occurring from architectural work among total work types were 1,986, defect occurrence rate was 62.5%, and defect repair cost was KRW $25,851/m^2$, which stood at 78.2% of the total work types. This means the defect occurrence rate and defect repair cost in architectural work are bigger than those of other work types. (2) Major defects in architectural work were revealed in the following order: cracks from frame work, inferior interior finishing work, inferior finishing work of plaster/masonry works, water leak/damage from waterproof work and withering/omission from landscape work. The total repair cost of the major selected defects was KRW $12,220/m^2$, and was analyzed to take up 37% of the total defect repair cost.

A Study on the Improvement of Aircraft Contract Maintenance System (항공장비 외주정비체계 개선방안 연구)

  • Suh Sung-chul;Park Seung-hwan
    • Journal of the military operations research society of Korea
    • /
    • v.30 no.2
    • /
    • pp.96-107
    • /
    • 2004
  • This paper deals with $\ulcorner$Requirement Decision Model for Repair Parts supplied by the Government$\lrcorner$ which is to reduce Aircraft Contract Maintenance Cost. It aims to find solutions to the fundamental problems of the Aircraft Contract Maintenance System. Under the current Aircraft Contract Maintenance System, it is hard to forecast the exact demand of repair parts, so support rate of Repair Parts supplied by the Government is restricted under 50 percent. It is inevitable to purchase Repair Parts from the firm with much higher price than those of Government source. However, absence of fixed demand pattern makes it difficult to improve accuracy of demand forecast. As a solution to these problems, this model prevents a cost increase due to the unit price difference between Repair Parts supplied by the Government and Repair Parts purchased by the Firm. It also reflects demand characteristics of each repair part, and prevents continual stock increase by setting an upper limit on the amount of Repair Parts supplied by the Government. The effectiveness of this model is verified by empirical analysis using the latest raw data. By applying this model to real situation, we expect to reduce about 4 billion won every year.

Biomechanical Test for Repair Technique of Full-thickness Rotator Cuff Tear

  • Lim, Chae-Ouk;Park, Kyoung-Jin
    • Clinics in Shoulder and Elbow
    • /
    • v.19 no.1
    • /
    • pp.51-58
    • /
    • 2016
  • The arthroscopic rotator cuff repair is now considered a mainstream technique with highly satisfactory clinical results. However, concerns remain regarding healing failures for large and massive tears and high revision rate. In recent decades, various repair strategies and construct configurations have been developed for rotator cuff repair with the understanding that many factors contribute to the structural integrity of the repaired construct. The focus of biomechanical test in arthroscopic repair has been on increasing fixation strength and restoration of the footprint contact characteristics to provide early rehabilitation and improve healing. These include repaired rotator cuff tendon-footprint motion, increased tendon-footprint contact area and pressure, and tissue quality of tendon and bone. Recent studies have shown that a transosseous tunnel technique provides improved contact area and pressure between rotator cuff tendon and insertion footprint, and the technique of using double rows of suture anchors to recreate the native footprint attachment has been recently described. The transosseous equivalent suture bridge technique has the highest contact pressure and fixation force. In this review, the biomechanical tests about repair techniques of rotator cuff tear will be reviewed and discussed.