• Title/Summary/Keyword: Renewable energy system

Search Result 2,432, Processing Time 0.031 seconds

Use of Geo-spatial Information System for the Potential Location Analysis of Small Hydropower.

  • Bastola, Shiksha;Lee, Sangheop;Kareem, Kola Yusuff;Jung, Younghun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.151-151
    • /
    • 2021
  • The alarming climate change impacts are demanding the use of renewable energy sources like never before. Hydropower is one of the most cost-effective and environmental friendly energy technology recognized in the world. Big hydropower projects come up with the requirements of huge investment costs along with environmental impacts, whereas small hydropower(SHP) are considered a best solution for the economical source of energy. SHP, basically Run-of-River (RoR) type plants can be sustainable renewable energy sources and given the nature of perennial rivers flowing from steep gradient and rugged topography, feasibility of such plants is equally high in Nepal. The objective of this study is to determine the primary potential sites for the development of RoR type SHP sites using Geo-spatial Information System(GSIS). The use of GSIS enables precise survey of large area within a short period of time. This study has focused on the determination of locations by establishing defined criterions and methodologies and hence have located multiple locations rather than selecting one best location. The approach is applicable for the rapid initial screening of potential locations and results can facilitate detail feasibility study for the technical and economic analysis of SHP in the basin.

  • PDF

Parametric Study of a Fixed-blade Runner in an Ultra-low-head Gate Turbine

  • Mohamed Murshid Shamsuddeen;Duc Anh Nguyen;Jin-Hyuk Kim
    • New & Renewable Energy
    • /
    • v.20 no.1
    • /
    • pp.116-125
    • /
    • 2024
  • Ultra-low-head is an unexplored classification among the sites in which hydroelectric power can be produced. This is typically owing to the low power output and the economic value of the turbines available in this segment. A turbine capable of operating in an ultra-low-head condition without the need of a dam to produce electricity is developed in this study. A gate structure installed at a shallow water channel acting as a weir generates artificial head for the turbine mounted on the gate to produce power. The turbine and generator are designed to be compact and submersible for an efficient and silent operation. The gate angle is adjustable to operate the turbine at varying flow rates. The turbine is designed and tested using computational fluid dynamics tools prior to manufacturing and experimental studies. A parametric study of the runner blade parameters is conducted to obtain the most efficient blade design with minimal hydraulic losses. These parameters include the runner stagger and runner leading edge flow angles. The selected runner design showed improved hydraulic characteristics of the turbine to operate in an ultra-low-head site with minimal losses.

INVESTIGATION ON OPTIMAL LOCATION OF SEPARATION PART FOR LARGE SCALE WIND TURBINE BLADE

  • Wooseong Jeong;Hyunbum Park
    • International Journal of Aerospace System Engineering
    • /
    • v.11 no.1
    • /
    • pp.1-3
    • /
    • 2024
  • Around the world, fossil fuel energy is being replaced with renewable energy due to environmental problems and sharp price increases. Many countries are making a change in the direction of moving toward eco-friendliness by reducing carbon emissions. Among renewable energies, the wind energy is eco-friendly because it produces electricity by wind power without carbon emissions, and it attracts attention worldwide as a great alternative to the exhausted fuel energy. To improve the efficiency of wind turbines, large and extra-large wind turbines have been developed all over the world by increasing install and diameter. These wind turbines have difficulty in transport after manufacture because of their size and height. Since the height of wind turbine blades is higher than the existing tunnel height, it is impossible to transport them. In this study, therefore, a 5 MW class large blade was separated for transport easiness as wind power generators became larger globally. Aerodynamic design and analysis was carried out for the blade. After performing structural design and analysis with the model designed, the stress concentration of the analyzed model and the various factors for consideration when separating were considered to conduct the study of selecting the optimal blade separation positions.

A study on the estimation of the renewable energy certificates(REC) weight considering the life cycle assessment(LCA) of greenhouse gas emission (전과정(LCA) 온실가스 평가를 고려한 신재생에너지 공급인증서 가중치 산정 방안 연구)

  • Beak, Hun;Kim, Tae Sung
    • Journal of the Korea Convergence Society
    • /
    • v.11 no.8
    • /
    • pp.173-182
    • /
    • 2020
  • The government continuously improves the RPS system to expand the supply of renewable energy, but there has been criticism that more environmental aspects should be considered to reduce GHG emission. REC weights are differentiated according to renewable energy sources. Greenhouse gas emission is one of the decisive factors, and its value is set by experts' opinion. This study assigns LCA to get accurate value of GHG emission. The LCA calculates emitted greenhouse gases from entire process of fuel production, transportation, power plant construction, operation, and decommission. This study suggests a method to change the greenhouse gas reduction effect from the existing qualitative method to the quantitative method and evaluates them. As a result, the evaluation score is changed, but the tier interval is so large that it does not affect the REC weight. Therefore, this study suggests the way that directly reflect the greenhouse gas reduction effect in the REC weight.

Introductions for Foreign PEM Systems and It's Field Test Plan Linked to Renewable Energy in Jeju Island (국외 PEM 수전해시스템 도입 및 제주도 재생에너지 연계 실증방안)

  • Sangyup Jang;Jaedong Kim;Dongmin Kim;Jinmo Park;Youngseuk So
    • Journal of the Korean Institute of Gas
    • /
    • v.27 no.1
    • /
    • pp.33-37
    • /
    • 2023
  • Efforts by each country to solve the climate change problem continue, and the transition to eco-friendly fuels is a task for mankind to continue. Recently, Jeju Island, where renewable energy resources are relatively abundant, is preparing to demonstrate the technology to produce green hydrogen linked to renewable energy and this study aims to introduce and apply polymer electrolyte water electrolysis devices of advanced foreign companies after comparing domestic and foreign technologies. This study aims to solve domestic safety regulations for water electrolysis devices manufactured overseas and system introduction process and evaluation method of core components.

Novel control algorithm for smart PCS with harmonics and reactive power compensation (고조파와 무효전력 보상기능을 가지는 Smart PCS의 새로운 제어 알고리즘)

  • Seo, Hyo-Ryong;Jang, Seong-Jae;Park, Sang-Soo;Kim, Sang-Yong;Kim, Gyeong-Hun;Park, Min-Won;Yu, In-Keun
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.1053_1054
    • /
    • 2009
  • A significant number of renewable energy systems have been connected to the grids as supplement power source. The renewable energy systems require control algorithm to maintain the power-supply reliability and quality. This paper proposes a novel control algorithm for smart Power Conditioning System (PCS) with harmonics and reactive power compensation. The smart PCS is used to feed Photovoltaic (PV) power to utility and compensate harmonics and reactive power at the same time. The experimentation is carried out on the proposed grid-connected PV generation system, and controlled by digital signal processor. The grid-connected PV generation system injects PV energy into the grid and performs as Active Filter (AF) and Static Synchronous Compensator (STATCOM) without additional devices. The experiment results show that the proposed control algorithm is effective for smart PCS with harmonics and reactive power compensation.

  • PDF

Comparative Study on Performance of Wet-type and Dry-type Floor Heating Systems Using Geothermal Heat Pump (지열히트펌프를 이용한 습식.건식 바닥난방 성능평가 연구)

  • Lee, Byoung-Doo;Lee, Se-Jin;Lee, Dae-Woo;Oh, Sung-Hae;Nam, Woo-Dong
    • New & Renewable Energy
    • /
    • v.5 no.4
    • /
    • pp.60-65
    • /
    • 2009
  • The present study was conducted for a comparative evaluation of wet and dry floor heating systems using geothermal heat pump. We circulated hot water from geothermal heat pump which is $10{\sim}15^{\circ}C$ lower than that from boiler. In order to access indoor temperature ($25^{\circ}C$) it took 74 minutes for dry type and 247 minutes for wet type. Average floor temperature was $23.9^{\circ}C$ for wet type and $32.7^{\circ}C$ for dry type. Energy saving rate gradually increased by 66% after 138 minutes. As a result, in case of floor heating system using low temperature circulation water, dry type was more practicable for stable floor heating than wet type in terms of floor temperature and access time to indoor set temperature.

  • PDF

A Study of the Efficient Planning of Governance for Building Biomass Circulation Estate (바이오매스 순환단지조성을 위한 거버넌스 구축방안 연구)

  • Kwon, Goo-Jung;Lee, Su-Young;Hwang, Jae-Hyun
    • Korean Journal of Organic Agriculture
    • /
    • v.22 no.4
    • /
    • pp.561-579
    • /
    • 2014
  • This research estimates the necessity of a better governance plan on the purpose of fulfillment energy recovery by building resource recycling system for biomass resources and waste resources that derive from agricultural and mountain village areas. The utilization of new renewable energy technology which uses waste and biomass sources diverse as variety of resources, collecting method, operator etc. and is structurally complicated the formation of policy is also very difficult. There is failure because of the problems which occurs from the policy led by government. Biomass Town Development Project should be made through the central government and the local government integrated support system and should be formed a consultative group in order to process the project mutually with these two department including the experts from the related areas. This consultative group, while government organizations carry out the hub function of strategic knowledge management, should carry out the control tower function to be able to be net working transfer the information with the cooperation of private and government so vitalize the communication area among the related actors. And to be able to increase the participation rate of the local people the consistent and various educations should be given so a smooth business promotion progress will be desired through the change of perception and coactive participation of people.

자연 에너지 이용과 환경건축을 위한 신기술

  • Lee, Gyeong-Hoe
    • Solar Energy
    • /
    • v.13 no.2_3
    • /
    • pp.107-119
    • /
    • 1993
  • This paper is to refine the concept of utilizing natural energy, and to introduce new technologies of building energy control. For the global environment protection, it is essential to turn attention to latent capacity of natural renewable energy. Especially the concept of 'Environmental Architecture' is very important from this viewpoint. This paper reviews many of new technologies for environmental architecture developed recently : TIM, high effective solar radiation control strategy of glazing, new passive cooling and heating system etc. The design application of the technology has been introduced.

  • PDF

Development Trends of Tidal Current Energy and Its Test Bed (조류에너지의 이용기술)

  • Yang, Changjo;Hoang, T.G.
    • Vacuum Magazine
    • /
    • v.3 no.2
    • /
    • pp.11-16
    • /
    • 2016
  • Tidal current energy is the most interesting renewable resources that have been less harnessed. Korea has globally outstanding tidal current energy resources and it is highly needed to develop a tidal current energy conversion system. It is reported that the total amount of available tidal current energy is approximately 6GW in Korea. A good tidal site candidate is required a large amount of fast moving water, bathymetry and seabed properties, no conflicts with other users and is close to a load and grid interconnection. In this review, we summarized the results of R&D projects regarding tidal current resources, utilization projects and demonstration test bed.