• Title/Summary/Keyword: Removal process

Search Result 4,458, Processing Time 0.032 seconds

Organic Removal Efficiency and Toxicity Evaluation of Persistent Microorganism from Dye Wastewater Treatment using a Photooxidation system (광산화시스템을 이용한 염색폐수의 유기물 처리효율 및 잔류미생물의 독성 평가)

  • Jung, Ho Jun;Rhee, Dong Seok
    • Journal of Industrial Technology
    • /
    • v.29 no.A
    • /
    • pp.83-88
    • /
    • 2009
  • The removal efficiency of organic compounds and the toxicity evaluation of microorganism have been studied in dye wastewater treatment using $UV/TiO_2$ and $UV/H_2O_2$ photooxidation system. Sample waters tested in this work were raw dye wastewater and dye wastewater treated in $UV/TiO_2$ and $UV/H_2O_2$ photooxidation system respectively. Total organic carbon(TOC) removal rate was 50% in $UV/TiO_2$ process and 80% in $UV/H_2O_2$ process. It has been investigated with colony counting agar method and paper disk method whether the type of treatment process has affected the microorganism growth. In the raw wastewater, more than four types of microorganisms have survived. But, little of microorganisms were alive at TOC removal rate of 50% in $UV/TiO_2$ system. In contrast to that, two types of microorganisms were found at TOC removal rate of 80% in $UV/H_2O_2$ system.

  • PDF

Optimization of Ultrafiltration Process using $MIEX^{(R)}$+Coagulation Process ($MIEX^{(R)}$+응집공정을 이용한 한외여과 공정의 최적화 : 다양한 전처리 공정의 적용에 따른 막 오염 현상 규명)

  • Son, Hee-Jong;Hwang, Young-Do;Roh, Jae-Soon;Jung, Chul-Woo;Kang, Lim-Seok
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.27 no.7
    • /
    • pp.753-761
    • /
    • 2005
  • In this study, pretreatment of organic matters with $MIEX^{(R)}$ was evaluated using bench-scale experimental procedures on four organic matters to determine its effect on subsequent UF membrane filtration. For comparison, coagulation process was also used as a pretreatment of UF membrane filtration. Moreover, the membrane fouling potential was identified using different fractions and molecular weights of organic matters. From the removal property of MW organic matters by coagulation process for the sample water NOM and AOM, the removal efficiency of high MW organic matters were much higher than those of low MW organic matters. It was shown that the removal efficiency of high MW organic matter more than 10 kDa was lower than that of low MW organic matter for $MIEX^{(R)}$ process. For the change of permeate flux by the pretreatment process, $MIEX^{(R)}$+UF process showed high removal efficiency of organic matter as compared with coagulation-UF processes, but high reduction rate of permeate flux was presented through the reduction of removal efficiency of high MW organic matter. From sequential filtration test results in order to examine the effect of MW of organic matter on membrane fouling, it was found that the membrane foulant was occurred by high MW organic matter, and the DOC of organic matter less than 0.5 mg/L was working as the membrane foulant. In the case of sample water composed of low MW organic matter less than 10 kDa, since the low MW organic matter less than 10 kDa has high removal efficiency by $MIEX^{(R)}$, low reduction rate of permeate flux is obtained as compared with coagulation-UF processes. In summary, it is required to conduct the research on physical/chemical characteristic of original water before pretreatment process of membrane process is selected, and a pertinent pre-treatment process should be employed based on the physical/chemical characteristic of original water.

Development of BNR(Biological Nutrient Removal) Process Using Expanded Polystylene(EPS) Media (Expanded Polystylene(EPS) 여재를 이용한 BNR(Biological Nutrient Removal) 공정 개발)

  • Ryu, Hong-Duck;Min, Kyung-Kook;Lee, Jeong-Hun;Choi, Kyoung-Young;Lim, Heun-Eun;Kim, Chul-Hwan;Lee, Sang-Ill
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.28 no.1
    • /
    • pp.1-6
    • /
    • 2006
  • Biological nutrient removal(BNR) process used in this study, which was packed with EPS(expanded polystylene) media, has more many advantages in aspect of reducing hydraulic retention time(HRT) of the process and having less effect of temperature in the winter season than commercial process in the present. Bench-scale study was performed using domestic wastewater. In the results, it was observed that the T-N removal efficiencies in HRT 6 hr and HRT 4 hr were 55% and 51%, respectively, showing the small reduction (about 4%) of T-N removal efficiency according to shortening of HRT. In comparison of T-N removal characteristic in summer and winter seasons, it showed that T-N removal efficiencies in summer and winter seasons were 65% and 54%, respectively, showing the 11% lower T-N removal efficiency in winter season than in summer season due to deterioration of nitrification in winter season. In the studies of influent loading rate and C/N ratio, the process showed stable effluent quality under the condition of broad influent loading rate and C/N ratio. Therefore, it is anticipated that the developed process in this study could be applicable to small wastewater treatment plant in nutrient removal.

A Study on $SO_2$Removal in Flue Gas by Semidry Flue Gas Desulfurization Method (반건식 배연탈황법에 의한 연소 페가스 중 $SO_2$제거에 관한 연구)

  • Song, Ho-Cheol;Lee, Yun-Gi;Park, Jin-Won
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.14 no.4
    • /
    • pp.273-280
    • /
    • 1998
  • The investigation on the removal of 502 gas fro.In flue gas which causes serious air pollution was made by using a semi dry flue gas desulfurization method. Experiments were carried out as a function of process variables which would affect SO2 removal efficiency. Process variables inclilded SO2 inlet concentration, inlet temperature of simulated flue gas, sorbent weight fraction, and volume flow rate of sorbent slurry. In this study, used sorbent was Ca(OH), and simulated flue gas was prepared by mixing pure SO2 gas with air. Experimental conditions were varied at 140~18$0^{\circ}C$ of inlet temperature of the simulated flue gas, 500~2000ppm of inlet SO2 concentration, 0.4~1.0% of sorbent concentration, and 10~25 mL/min of flow rate of sorbent slurry. Among process variables, inlet concentration of SO2 was found to be the most significant factor to affect SO2 removal efficiency. The concentration of Ca(OH2) had a lower effect on SO2 removal than SO2 inlet concentration removal amount was 0.108, 0.141, 0.153 g SO2/g Ca(OH)2 respectively- As 200 mmol of HNO3 was added into slurry to improve removal efficiency, initial pH was maintained and solubility of slurry increased, so that removal efficiency elevated. Adding over 200 mmol of HNO3 into slurry caused removal efficiency lower. Therefore it could be concluded the optimum was 200 mmol of HNO3 input.

  • PDF

Development of a Rotating Biological Contactor(RBC) Process for the Advanced Wastewater Treatment (회전원판(回轉圓板) 생물막(生物膜) 공법(工法)을 이용한 하(下)·폐수(廢水)의 고도처리(高度處理) 공정(工程) 개발(開發))

  • Kim, Eung Ho;Park, Jae Lo;Yoon, Jung Ro
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.8 no.2
    • /
    • pp.1-11
    • /
    • 1994
  • This study was conducted to develop a new RBC process available for the effective removal of organic matters and nitrogen in sewage. The RBC process for the oxidation organic compounds and nitrification was designed to occur at the 1st-stage and next-stage RBC respectively. Then nitrified water was recycled to the denitrifying RBC located at the lower part of the 1st-stage RBC. Some results were summarized as follows. 1. The loading limitation was represented as $60g{\cdot}COD/gm^2/day$ in experiment of simultaneous removal of organic matter and nitrogen. The maxmum COD % removal was 85% at the load $35g{\cdot}COD/m^2/day$. 2. The $NO_3-N$ % removal was approximately 80% at the load $60g{\cdot}COD/m^2/day$ and the maximum $NO_3-N$ remaval rate was $3.9g{\cdot}COD/m^2/day$ and the overall C/N ratio of 11.0 as required to achive 80% of $NO_3-N$% removal. 3.$NO_3-N$ removal rate was rapidly decreased above the load $7g{\cdot}NH_4{^+}-N/m^2/day$ and the maximum $NO_3-N$ removal rate was $3.7g{\cdot}NO_3-N/m^2/day$. 4. Irrespective of the recycle ratio, the COD % removal at the system of 2-stage RBC unit was nearly constant as 89% while the maximum one in the 1st-stage unit was 77% in the case of 50% recycle. 5. The maximum COD % removal in the 3-stage RBC system was 93% while 1st-stage one being 80%, under the $NH_4{^+}-N$ load of $7.4g/m^2{\cdot}d$. Also maximum percentage of nitrification and denitrification was 69% and 41% respectively, under the same $NH_4{^+}-N$ load.

  • PDF

Evaluation of electrical energy consumption in UV/H2O2 advanced oxidation process for simultaneous removal of NO and SO2

  • Shahrestani, Masoumeh Moheb;Rahimi, Amir
    • Environmental Engineering Research
    • /
    • v.24 no.3
    • /
    • pp.389-396
    • /
    • 2019
  • The electrical energy consumption (EEC) in removal of NO by a $UV/H_2O_2$ oxidation process was introduced and related to removal efficiency of this gas. The absorption-reaction of NO was conducted in a bubble column reactor in the presence of $SO_2$. The variation in NO removal efficiency was investigated for various process parameters including NO and $SO_2$ inlet concentrations, initial concentration of $H_2O_2$ solution and gas flow rate. EEC values were obtained in these different conditions. The removal efficiency was increased from about 22% to 54.7% when $H_2O_2$ concentration increased from 0.1 to 1.5 M, while EEC decreased by about 70%. However, further increase in $H_2O_2$ concentration, from 1.5 to 2, had no significant effect on NO absorption and EEC. An increase in NO inlet concentration, from 200 to 500 ppm, decreased its removal efficiency by about 10%. However, EEC increased from $2.9{\times}10^{-2}$ to $3.9{\times}10^{-2}kWh/m^3$. Results also revealed that the presence of $SO_2$ had negative effect on NO removal percentage and EEC values. Some experiments were conducted to investigate the effect of $H_2O_2$ solution pH. The changing of pH of oxidation-absorption medium in the ranges between 3 to 10, had positive and negative effects on removal efficiency depending on pH value.

Analysis of the operating factors of dissolved air flotation (DAF) process for effluent quality improvement from aquaculture rearing tank (양식장 배출수 수질관리를 위한 용존공기부상 공법의 운전 인자 영향 분석)

  • Ki, Jae-Hong;Kim, Hyoung-Jun;Lee, Ju-Young;Han, Moo-Young;Gang, Hee-Woong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.26 no.1
    • /
    • pp.107-113
    • /
    • 2012
  • Pollutants in aquaculture system effluent mostly originated from solid wastes including uneaten feed and excreta of cultured species. In this research, DAF(Dissolved Air Flotation) unit is suggested as an integrated solid control unit especially as a form of IIBG(Inline Injection Bubble Generation) process in aquaculture system. Solid removal performance of DAF unit was examined under various operation and salinity conditions with turbidity and suspended solid. Solid waste removal efficiencies were found to be affected by operation conditions including saturator pressure, recycle ratio, coagulant concentration. Solid removal efficiency was higher under higher saturator pressure and recycle ratio under which condition larger number of bubbles is generated. Coagulant is thought to have important role in creating bubble-particle aggregate by showing better removal efficiency with higher concentration. However higher saline water showed less effectiveness in removing solids by DAF(IIBG). Application of DAF(IIBG) process also showed additional effect in phosphate removal and DO(Dissolved Oxygen) supply. Phosphate existed in polluted water was removed up to 46% after treatment, which is thought to attribute to aluminium phosphate precipitation. And DO concentration was found to increase over 50% of initial saturation concentration after the injection of micro-bubbles. Through experiments on solid removal from aquaculture effluent, DAF(IIBG) process is estimated to be effective solid control method. This property can help aquaculture system being installed and operated simply and effectively.

Nitrogen and Phosphorus Removal in Domestic Wastewater using SBR Process with Flow Changing Continuous Feed and Cyclic Draw (교대연속유입식 SBR 공정을 이용한 하수중의 질소 및 인 제거)

  • Seo, In-seok;Kim, Hong-suck;Kim, Youn-kwon;Kim, Ji-yeon
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.2
    • /
    • pp.203-208
    • /
    • 2006
  • A continuous feed and cyclic draw SBR process was developed to overcome flow rate fluctuation and to maximize organic matters utilization efficiency for nitrogen and phosphorus removal. The developed SBR process was operated with two parallel reactors. Influent was supplied to one reactor which was not obligately aerated. At the same time, the other reactor was just aerated without supplying influent. In addition this mode was changed periodically. Cycle time was 6hr and aeration time ratio($t_{aer}/t_{total}$) was 0.33, respectively. $COD_{cr}$ and SS removal efficiencies of 95% or higher were achieved. Nitrogen removal was so greatly influenced by influent $COD_{cr}/T-N$ ratio. At influent $COD_{cr}/T-N$ ratio of 5.7, removal efficiencies of ammonia-N, T-N and T-P were 96%, 78% and 55%, respectively. Influent $COD_{cr}/T-N$ of 4 or higher ratio was necessary to achieve 60% or higher nitrogen removal. Organic matters of influent was efficiently utilized in denitrification reaction and consumed COD has a good correlation with removed T-N(about 6.5 mgCOD/mgTN). Continuous feed and cyclic draw SBR process could be one of alternative processes for the removal of nutrients in rural area where $COD_{cr}/T-N$ ratio was low and fluctuation of flow rate was severe.

Adsorption and electro-Fenton processes over FeZSM-5 nano-zeolite for tetracycline removal from wastewater

  • Niaei, Hadi Adel;Rostamizadeh, Mohammad
    • Advances in nano research
    • /
    • v.9 no.3
    • /
    • pp.173-181
    • /
    • 2020
  • Adsorption and heterogeneous electro-Fenton process using iron-loaded ZSM-5 nano-zeolite were investigated for the removal of Tetracycline (TC) from wastewater. The nano-zeolite was synthesized hydrothermally and modified through impregnation. The zeolite was characterized by XRD, FT-IR, FE-SEM, N2 adsorption-desorption, and NH3-TPD techniques. The equilibrium data were best represented by the Freundlich isotherm. The pseudo-second-order kinetic model was the most accurate model for the adsorption of TC on the modified nano-zeolite. The effect of parameters such as pH of solution and current density were investigated for the heterogeneous electro-Fenton process. The results showed that the current density of 150 mA and pH of 3 led to the highest TC removal (90.35%) at 50 min. The nano-zeolite showed the appropriate reusability. Furthermore, the developed kinetic model was in good agreement with the removal data of TC through the electro-Fenton process.

Numerical Study of Inclusion removal from Molten Steel by Argon Gas Flotation (용강 내 아르곤가스의 개재물 흡착에 대한 수치적 연구)

  • 문창호;황상무
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2003.05a
    • /
    • pp.335-338
    • /
    • 2003
  • A finite element-based, integrated process model has been developed and applied to predict the detailed, three-dimensional aspects of the thermo-mechanical behavior occurring in the slab caster considering inclusion removal from molten steel by argon bubble flotation. Gas bubbles are simulated using the dispersion model calculating the volume fraction, and the bubble capture effect is included by a source term in the transport equation for particles. The process model is applied to the investigation of the effect of various process parameters on the inclusion removal in the molten steel.

  • PDF