• 제목/요약/키워드: Remodeling Phase

검색결과 62건 처리시간 0.026초

1기 신도시 노후 공동주택 리모델링 평면 프로토타입 개발에 관한 연구 - 2 Bay 형식의 1기 신도시 대표유형을 중심으로 - (Development of Remodeling Prototype Plans in 1st-Phase New Town Aged Apartment - Based on '2 Bay Type' of 1st-Phase New Town Representatives -)

  • 최재필;최준호;김영선;문성훈
    • 대한건축학회논문집:계획계
    • /
    • 제34권6호
    • /
    • pp.67-76
    • /
    • 2018
  • A prototype of remodeling floor plans are proposed in this study. They are researched base on the majority floor plan type which forms 19% out of representatives 1st-Phase New Town Aged Apartment compositions. In order to examine possible scenarios of the prototypes, prototype planning model is derived from the president studies on aged apartment remodeling. The prototype plans reflect residents' preference survey and lead 6 different kinds of prototype plans regarding 3 different remodeling scenarios. Prototypes consider characteristics of multi-complex buildings and households which applicably various remodeling planning options; story-Increase remodeling, residents custom remodeling etc. The study has significance to be basic planning materials for remodeling of association and local government.

퍼지추론 기반 멀티 에이전트를 통한 리모델링 사업 전 추진단계에서의 갈등관리 (Conflict Management in Planning phase of Remodeling Project through Multi-Agent based on Fuzzy Inference.)

  • 박지은;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.202-203
    • /
    • 2015
  • To promote the remodeling project it is important to get apartment residents' consent. It is significant variable to determine project to progress smoothly from planning stage which committee of association establishment sets up to establishment stage of association. On average, it takes about 1~1.6 year in planning phase which means before construction phase of remodeling. Therefore, it is very important issue to get apartment residents' consent in planning phase. In this research, we focused on residents' opinion and proposed solution of conflict with gathering residents' opinion to proceed remodeling project. By setting particular remodeling situation, related residents represented as agents made effort to efficient coordination to reduce total duration of decision making. Therefore, we proposed multi-agent based on fuzzy inference to simulate behavior of decision making on remodeling project effectively. From this method, optimal alternative is selected by considering each agents' attributes which represented by fuzzy set. This research will develope to further research for realizing concrete multi-agent based on fuzzy inference considering all stakeholders in remodeling project.

  • PDF

건축 리모델링 사업단계별 참여주체자의 업무와 역할정립 (The Establishment of the Task and Role of the Participants at Building Remodeling Phases)

  • 정덕우;박찬식
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.331-334
    • /
    • 2002
  • 건축 리모델링 사업에 참여하고 있는 주체자의 업무와 역할은 기존의 신축공사와 달리 명확히 구분되어야 한다. 그러나 리모델링 공사비의 규모나 시장 참여자들 대부분이 충분한 경험과 기술을 보유하고 있지 못한 실정이며, 진행과정에서 참여주체자간의 업무와 역할이 중복되거나 간섭이 발생하고 있다. 따라서 체계적이고 성공적인 리모델링 사업을 수행하기 위한 방안이 필요하며, 이를 위해 리모델링 사업단계별 참여주체자의 업무와 역할을 정립하고자 한다.

  • PDF

BIM을 활용한 리모델링계획 사례연구 (A Case study on the Remodeling Design through BIM(Building Information Modeling))

  • 민영기;이재국
    • 한국디지털건축인테리어학회논문집
    • /
    • 제12권4호
    • /
    • pp.125-132
    • /
    • 2012
  • In this study based on BIM(Building Information Modeling) apply for performing efficient remodeling project and utilized. And this study will examine a real project where a BIM based process was used in the remodeling of an single-family homes. In the remodeling design phase of the planning process was conducted for the BIM process modeling, BIM in the remodeling stage while performing the required range and level of the remodeling process were studied. Based on this, communication between client and remodeling designer, participants more expect that smooth and speeds up in remodeling. For client decision support, troubleshooting of remodeling of the design process to be effective in the BIM have been identified. The BIM model and deliverables data used for the remodeling design process of building remodeling is the most effective way, due to the increased efficiency gained in many areas.

공동주택의 그린 리모델링을 위한 외피시스템 환경영향 DB 구축에 관한 연구 (A Study on the Establish Environmental Impact of Database of the Envelope System for Green Remodeling of Apartment Housing)

  • 이종건;태성호;채창우;김낙현
    • KIEAE Journal
    • /
    • 제16권5호
    • /
    • pp.73-79
    • /
    • 2016
  • Purpose: In order to improve the energy performance of existing buildings, so actively promoted green remodeling business. Also, improvement of the performance of envelope system of apartment housing is an absolute. The purpose of implementation of the data base and application plan of the envelope system for green remodeling of apartment housing. Method: For this study, It proposed a classification system of green remodeling envelope system constructed actual to select the applicable representative method and input material of apartment housing for green remodeling. In this study, divided into construction waste processing stage and production phase of the material for the boundary of the system, and implementation the classification system of the envelope system for applicable green remodeling. For this, established 6 environmental impact categories database. Result: As a result of various suggestions were available for case study research, alternative combinations of existing combinations than six kinds of environmental impact insulation system with superior input materials combining 96 kinds, window system, 12 kinds for determining the applicability of the established database. Depending on the account for a large proportion if compared to the detailed analysis of the environmental impact resulting from the production phase and disposal phase was analyzed that the operating management of the necessary input materials. Is considered that the economic performance and integrated energy performance required by the applicable public housing green remodeling evaluation techniques considered for future improvements insulation sheath.

A Case Study on BIM-enabled Evaluation of Design Alternatives for an Actual Remodeling Project in Korea - Focusing on the Spatial Program Review in Early Phase of Design -

  • 김현정;이진국
    • 한국실내디자인학회논문집
    • /
    • 제24권5호
    • /
    • pp.117-127
    • /
    • 2015
  • This paper depicts a case study of the BIM (Building Information Modeling)-enabled evaluation of design alternatives for an actual remodeling project in Yeongwol, Korea. The increase of urban population and income followed by the growth of economy has derived massive supply of grand scale housing project in Korea since 1970s. Consequently, building remodeling became one of the feasible resolutions for renovating such old housings in these days. This paper aims to introduce a technical approach to such remodeling projects based on BIM-enabled applications focusing on quantitative analysis of design alternatives. Among the technical issues of such building remodeling projects, this paper focuses on the BIM-enabled area analysis and comparison between design alternatives to support decision-making even in early phase of remodeling design process. BIM and its variety of applications have broadly influenced the domain of AEC-FM (Architecture, Engineering, Construction, and Facility Management) within the lifecycle of buildings. As one of the applications facilitated by BIM, the automated area calculation and scenario-based comparison between alternatives can play an important role in the early phase of remodeling project. We modeled three design alternatives (buildings) and three housing modules (units) based on the actual case in Yeongwol city, Korea using a BIM design authoring tool. Nine combinatorial BIM models were demonstrated for the BIM-enabled review process described in this paper. To determine the most optimal design scenario among nine alternatives, this paper demonstrates a result of the conducted spatial program review. The main subject includes specific spatial program issues on; 1) the number of unit spaces; and 2) area of individual/grouped and private/shared spaces.

공동주택 리모델링 사업관리를 위한 영향요인 분석 -시공단계를 중심으로- (An Analysis of Influence Factors for the Remodeling Project Management of Apartment Buildings -Focused on Construction Phase-)

  • 심규정;서종민;나영주;송용식;김선국
    • KIEAE Journal
    • /
    • 제8권5호
    • /
    • pp.77-83
    • /
    • 2008
  • Housing development, particularly apartment buildings, has been increasingly growing due to the construction promotion policy of the government since the 1980s. However such a volume-oriented policy results in unfavorable side effect of substandard quality and early deterioration in line with the expansion in volume. As part of measures to deal with the problems, rebuilding and remodeling have surfaced as alternative recently. Remodeling is expected to create the more benefits, compared to the rebuilding, in cost, efficiency and duration. To come up with the solution to such a challenge, it's necessary to analyze the influence factors of remodeling. Hence, the study was intended to compare the remodeling in the aspect of influence factors. The results of this study is expected to the propose of effectual management factors of the remodeling construction.

건축물 리모델링 기획단계에서의 사업수행 프로세스 구축 (Constitution of Work Process for the Remodeling Construction Project in Planning Phase)

  • 권원;전재열
    • 한국건설관리학회논문집
    • /
    • 제7권6호
    • /
    • pp.165-174
    • /
    • 2006
  • 최근 건축 리모델링은 건축물의 수명주기에 대한 관심이 증대하면서 침체된 건설시장을 활성화하기 위한 새로운 대안으로 부상하고 있다. 그러나 현재 리모델링 사업은 사업시행자의 리모델링에 대한 전반적 이해부족과 더불어 리모델링 효과, 성능에 대한 평가, 사용자 요구 반영체계의 미비, 투입된 공사비에 의한 경제적 가치상승의 타당성 분석 등 객관적 평가기준, 리모델링 주기(Remodeling Life Cycle : 기획, 타당성${\rightarrow}$설계${\rightarrow}$시공${\rightarrow}$관리)에 대한 체계적 수행절차 및 평가 등에 종합적 관리기술과 요소기술의 부재로 인하여 사업수행에 여러 가지 어려움을 겪고 있는 실정이다. 이에 본 연구에서는 현재 리모델링 사업수행에 있어서 기획단계, 설계단계, 시공단계 중 초기 기획단계를 중심으로 리모델링 사업의 업무절차 및 의사결정을 위한 분석항목 등을 제시하여 사업수행의 전반적 이해를 통해 효율적인 관리방법을 모색하고자 하였다 이를 위해 먼저 각 단계별 필요한 Input 정보를 분석하고 활용 가능한 도구(Tool)와 기술을 통해 요소 결과물(Output)을 제시하였으며, 이러한 일련의 과정에 있어서 사업 참여주체별 책임과 역할을 규정하여, 리모델링 사업의 체계적 수행 프로세스를 구축하고자 하였다.

Bone Regeneration in the Extraction Socket Filled with Atelocollagen: Histological and Radiographic Study in Beagle Dogs

  • Lee, Hyeonjong;Noh, Kwantae;Lee, Deok-Won
    • Journal of Korean Dental Science
    • /
    • 제9권2호
    • /
    • pp.55-62
    • /
    • 2016
  • Purpose: Alveolar bone develops with tooth eruption and is absorbed following tooth extraction. Various ridge preservation techniques have sought to prevent ridge atrophy, with no superior technique evident. Collagen has a long history as a biocompatible material. Its usefulness and safety have been amply verified. The related compound, atelocollagen, is also safe and displays reduced antigenicity since telopeptides are not present. Materials and Methods: The current study evaluated whether the $Rapiderm^{(R)}$ atelocollagen plug (Dalim Tissen, Seoul, Korea) improves tissue healing of extraction sockets and assessed the sequential pattern of bone regeneration using histology and microcomputed tomography in six beagle dogs. To assess the change of extraction socket, hard tissues were examined 2, 4, 6, and 8 weeks after tooth extraction. Result: The experimental groups showed better bone fill with slow remodeling process compared to the control groups although there was no statistical difference between groups. Conclusion: The atelocollagen seems to have a tendency to slow bone remodeling in the early phase of healing period and maintain remodeling capacity until late phase of remodeling. Also, use of atelocollagen increased the bone-to-tissue ratio compared to healing of untreated extraction socket.

노후 공동주택 리모델링 계획안 거주민 선호도 연구 (A Study on the Residents' Preference on Apartment Remodeling Proposals)

  • 최재필;최준호;백수연;염수
    • 대한건축학회논문집:계획계
    • /
    • 제35권6호
    • /
    • pp.13-20
    • /
    • 2019
  • This study analyzes the residents' preference of apartment unit remodeling proposals for the 3-bay old apartments built in the 1st phase New Town. The remodeling unit plans were previously developed for a 3-bay large-sized unit plan (over 85m2) and a 3-bay medium-sized unit plan (60~85m2). Surveys and interview were conducted with the residnets of the two apartment complexes in Bundang. The contents of the questionnaire consisted of the preferred plan, the reason for the preference, the improvement factors, etc. A total of 88 questionnaires were received. It was found that two-thirds of respondents favored the general 3LDK format, where living rooms and kitchens were located in the middle of the front and rear bay. The one-third of the respondents favored a plan combining the living room and the kitchen in the front. It was also found that the limitation of the remodeling unit plan caused by the location of existing bearing walls should be carefully considered, and that many residents asked additional storage space.