• Title/Summary/Keyword: Remodeling Phase

Search Result 62, Processing Time 0.022 seconds

Development of Remodeling Prototype Plans in 1st-Phase New Town Aged Apartment - Based on '2 Bay Type' of 1st-Phase New Town Representatives - (1기 신도시 노후 공동주택 리모델링 평면 프로토타입 개발에 관한 연구 - 2 Bay 형식의 1기 신도시 대표유형을 중심으로 -)

  • Choi, Jaepil;Choi, Junho;Kim, Youngsun;Moon, Sunghoon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.6
    • /
    • pp.67-76
    • /
    • 2018
  • A prototype of remodeling floor plans are proposed in this study. They are researched base on the majority floor plan type which forms 19% out of representatives 1st-Phase New Town Aged Apartment compositions. In order to examine possible scenarios of the prototypes, prototype planning model is derived from the president studies on aged apartment remodeling. The prototype plans reflect residents' preference survey and lead 6 different kinds of prototype plans regarding 3 different remodeling scenarios. Prototypes consider characteristics of multi-complex buildings and households which applicably various remodeling planning options; story-Increase remodeling, residents custom remodeling etc. The study has significance to be basic planning materials for remodeling of association and local government.

Conflict Management in Planning phase of Remodeling Project through Multi-Agent based on Fuzzy Inference. (퍼지추론 기반 멀티 에이전트를 통한 리모델링 사업 전 추진단계에서의 갈등관리)

  • Park, Ji-Eun;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.202-203
    • /
    • 2015
  • To promote the remodeling project it is important to get apartment residents' consent. It is significant variable to determine project to progress smoothly from planning stage which committee of association establishment sets up to establishment stage of association. On average, it takes about 1~1.6 year in planning phase which means before construction phase of remodeling. Therefore, it is very important issue to get apartment residents' consent in planning phase. In this research, we focused on residents' opinion and proposed solution of conflict with gathering residents' opinion to proceed remodeling project. By setting particular remodeling situation, related residents represented as agents made effort to efficient coordination to reduce total duration of decision making. Therefore, we proposed multi-agent based on fuzzy inference to simulate behavior of decision making on remodeling project effectively. From this method, optimal alternative is selected by considering each agents' attributes which represented by fuzzy set. This research will develope to further research for realizing concrete multi-agent based on fuzzy inference considering all stakeholders in remodeling project.

  • PDF

The Establishment of the Task and Role of the Participants at Building Remodeling Phases (건축 리모델링 사업단계별 참여주체자의 업무와 역할정립)

  • Jung Duk-Woo;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.331-334
    • /
    • 2002
  • This study proposes a scheme for successful remodeling projects by establishing the task and role of project participants. In doing so, the study investigates the natures and problems of the current remodeling practices through interview and questionnaire survey with experts. This study establishes the critical phase of remodeling process and defines the task and role of project participants at each phase. The related documents of being generated at each phase also match up the task and role. It is expected that this scheme can be applied to deal with conflicts, cost overruns, and delays of time.

  • PDF

A Case study on the Remodeling Design through BIM(Building Information Modeling) (BIM을 활용한 리모델링계획 사례연구)

  • Min, Young-Gi;Lee, Jae-Kook
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.12 no.4
    • /
    • pp.125-132
    • /
    • 2012
  • In this study based on BIM(Building Information Modeling) apply for performing efficient remodeling project and utilized. And this study will examine a real project where a BIM based process was used in the remodeling of an single-family homes. In the remodeling design phase of the planning process was conducted for the BIM process modeling, BIM in the remodeling stage while performing the required range and level of the remodeling process were studied. Based on this, communication between client and remodeling designer, participants more expect that smooth and speeds up in remodeling. For client decision support, troubleshooting of remodeling of the design process to be effective in the BIM have been identified. The BIM model and deliverables data used for the remodeling design process of building remodeling is the most effective way, due to the increased efficiency gained in many areas.

A Study on the Establish Environmental Impact of Database of the Envelope System for Green Remodeling of Apartment Housing (공동주택의 그린 리모델링을 위한 외피시스템 환경영향 DB 구축에 관한 연구)

  • Lee, Jong Geon;Tae, Sung Ho;Chae, Chang-U;Kim, Rak Hyun
    • KIEAE Journal
    • /
    • v.16 no.5
    • /
    • pp.73-79
    • /
    • 2016
  • Purpose: In order to improve the energy performance of existing buildings, so actively promoted green remodeling business. Also, improvement of the performance of envelope system of apartment housing is an absolute. The purpose of implementation of the data base and application plan of the envelope system for green remodeling of apartment housing. Method: For this study, It proposed a classification system of green remodeling envelope system constructed actual to select the applicable representative method and input material of apartment housing for green remodeling. In this study, divided into construction waste processing stage and production phase of the material for the boundary of the system, and implementation the classification system of the envelope system for applicable green remodeling. For this, established 6 environmental impact categories database. Result: As a result of various suggestions were available for case study research, alternative combinations of existing combinations than six kinds of environmental impact insulation system with superior input materials combining 96 kinds, window system, 12 kinds for determining the applicability of the established database. Depending on the account for a large proportion if compared to the detailed analysis of the environmental impact resulting from the production phase and disposal phase was analyzed that the operating management of the necessary input materials. Is considered that the economic performance and integrated energy performance required by the applicable public housing green remodeling evaluation techniques considered for future improvements insulation sheath.

A Case Study on BIM-enabled Evaluation of Design Alternatives for an Actual Remodeling Project in Korea - Focusing on the Spatial Program Review in Early Phase of Design -

  • Kim, Hyunjung;Lee, Jin-Kook
    • Korean Institute of Interior Design Journal
    • /
    • v.24 no.5
    • /
    • pp.117-127
    • /
    • 2015
  • This paper depicts a case study of the BIM (Building Information Modeling)-enabled evaluation of design alternatives for an actual remodeling project in Yeongwol, Korea. The increase of urban population and income followed by the growth of economy has derived massive supply of grand scale housing project in Korea since 1970s. Consequently, building remodeling became one of the feasible resolutions for renovating such old housings in these days. This paper aims to introduce a technical approach to such remodeling projects based on BIM-enabled applications focusing on quantitative analysis of design alternatives. Among the technical issues of such building remodeling projects, this paper focuses on the BIM-enabled area analysis and comparison between design alternatives to support decision-making even in early phase of remodeling design process. BIM and its variety of applications have broadly influenced the domain of AEC-FM (Architecture, Engineering, Construction, and Facility Management) within the lifecycle of buildings. As one of the applications facilitated by BIM, the automated area calculation and scenario-based comparison between alternatives can play an important role in the early phase of remodeling project. We modeled three design alternatives (buildings) and three housing modules (units) based on the actual case in Yeongwol city, Korea using a BIM design authoring tool. Nine combinatorial BIM models were demonstrated for the BIM-enabled review process described in this paper. To determine the most optimal design scenario among nine alternatives, this paper demonstrates a result of the conducted spatial program review. The main subject includes specific spatial program issues on; 1) the number of unit spaces; and 2) area of individual/grouped and private/shared spaces.

An Analysis of Influence Factors for the Remodeling Project Management of Apartment Buildings -Focused on Construction Phase- (공동주택 리모델링 사업관리를 위한 영향요인 분석 -시공단계를 중심으로-)

  • Shim, Gyu-Jung;Seo, Jong-Min;Na, Young-Ju;Song, Yong-Sik;Kim, Sun-Kuk
    • KIEAE Journal
    • /
    • v.8 no.5
    • /
    • pp.77-83
    • /
    • 2008
  • Housing development, particularly apartment buildings, has been increasingly growing due to the construction promotion policy of the government since the 1980s. However such a volume-oriented policy results in unfavorable side effect of substandard quality and early deterioration in line with the expansion in volume. As part of measures to deal with the problems, rebuilding and remodeling have surfaced as alternative recently. Remodeling is expected to create the more benefits, compared to the rebuilding, in cost, efficiency and duration. To come up with the solution to such a challenge, it's necessary to analyze the influence factors of remodeling. Hence, the study was intended to compare the remodeling in the aspect of influence factors. The results of this study is expected to the propose of effectual management factors of the remodeling construction.

Constitution of Work Process for the Remodeling Construction Project in Planning Phase (건축물 리모델링 기획단계에서의 사업수행 프로세스 구축)

  • Kwon, Won;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.165-174
    • /
    • 2006
  • Recently, the architecture remodeling is rising as new alternative for activating the construction market as the interest toward life cycle of buildings has increased. But the reality is that current remodeling business is suffering various types of difficulties in its performance due to the absence of general management technology and factor technology in systematic performance procedure or evaluation, etc toward remodeling effect, evaluation on performance, imperfect system for reflecting user requirements and remodeling life cycle ; planning, $feasibility ^{\circ}\hat{E}designing^{\circ}\hat{E}construction^{\circ}\hat{E}management$ along with lack of overall understanding on remodeling. Accordingly, this research has attempted to search for an effective management method through overall understanding in project performance by presenting work procedure of remodeling project and analysis items for decision making, etc centered on early planning stage out of three stages called planning, designing and construction.

Bone Regeneration in the Extraction Socket Filled with Atelocollagen: Histological and Radiographic Study in Beagle Dogs

  • Lee, Hyeonjong;Noh, Kwantae;Lee, Deok-Won
    • Journal of Korean Dental Science
    • /
    • v.9 no.2
    • /
    • pp.55-62
    • /
    • 2016
  • Purpose: Alveolar bone develops with tooth eruption and is absorbed following tooth extraction. Various ridge preservation techniques have sought to prevent ridge atrophy, with no superior technique evident. Collagen has a long history as a biocompatible material. Its usefulness and safety have been amply verified. The related compound, atelocollagen, is also safe and displays reduced antigenicity since telopeptides are not present. Materials and Methods: The current study evaluated whether the $Rapiderm^{(R)}$ atelocollagen plug (Dalim Tissen, Seoul, Korea) improves tissue healing of extraction sockets and assessed the sequential pattern of bone regeneration using histology and microcomputed tomography in six beagle dogs. To assess the change of extraction socket, hard tissues were examined 2, 4, 6, and 8 weeks after tooth extraction. Result: The experimental groups showed better bone fill with slow remodeling process compared to the control groups although there was no statistical difference between groups. Conclusion: The atelocollagen seems to have a tendency to slow bone remodeling in the early phase of healing period and maintain remodeling capacity until late phase of remodeling. Also, use of atelocollagen increased the bone-to-tissue ratio compared to healing of untreated extraction socket.

A Study on the Residents' Preference on Apartment Remodeling Proposals (노후 공동주택 리모델링 계획안 거주민 선호도 연구)

  • Choi, Jaepil;Choi, Junho;Baek, Sooyeon;Lian, Shuai
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.6
    • /
    • pp.13-20
    • /
    • 2019
  • This study analyzes the residents' preference of apartment unit remodeling proposals for the 3-bay old apartments built in the 1st phase New Town. The remodeling unit plans were previously developed for a 3-bay large-sized unit plan (over 85m2) and a 3-bay medium-sized unit plan (60~85m2). Surveys and interview were conducted with the residnets of the two apartment complexes in Bundang. The contents of the questionnaire consisted of the preferred plan, the reason for the preference, the improvement factors, etc. A total of 88 questionnaires were received. It was found that two-thirds of respondents favored the general 3LDK format, where living rooms and kitchens were located in the middle of the front and rear bay. The one-third of the respondents favored a plan combining the living room and the kitchen in the front. It was also found that the limitation of the remodeling unit plan caused by the location of existing bearing walls should be carefully considered, and that many residents asked additional storage space.