• Title/Summary/Keyword: Reliability-Cost Matrix

Search Result 35, Processing Time 0.024 seconds

A Study on Reliability Evaluation and Improvement Process of Aerospace Electronic Equipments using Operational Reliability-Cost Matrix (신뢰성-비용 매트릭스를 이용한 항공전자장비의 신뢰성 평가 및 개선 프로세스 연구)

  • Jo, In-Tak;Lee, Sang-Cheon;Park, Jong-Hun;Bae, Sung-Moon
    • Journal of Korean Society for Quality Management
    • /
    • v.42 no.4
    • /
    • pp.633-646
    • /
    • 2014
  • Purpose: The conventional predicted MFTBF by military standard has a wide discrepancy to that of real-world operation, which leads to overstock and increase operation cost. This paper introduces a analyzing frame using operational reliability and cost data to overcome the discrepancy, and provides reliability improvement process employing the analyzing frame. Methods: This paper suggests Reliability-Cost Matrix (R-C Matrix) and Operational Reliability & Cost Index (ORCI) as a tool for reliability evaluation. Results: KOREIP(KAI's Operational Reliability Evaluation and Improvement Process) is developed employing Reliability-Cost Matrix and Operational Reliability & Cost Index. Conclusion: KOREIP provides a process and its activities based on Reliability-Cost Matrix frame. The process and activities leads reliability improvement of aerospace electronic equipments by means of categorizing and follow-up action based on the concept of frame.

Generator Scheduling Considering System's Reliability and Demand Response (시스템의 신뢰도와 수요 반응을 고려한 발전 운영)

  • Kwag, Hyung-Geun;Kim, Jin-O
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.5
    • /
    • pp.929-935
    • /
    • 2011
  • Customers hardly change to electric prices in old days because electricity is essential commodity, while demand changes with price after deregulation. It's explained by price-based demand response with demand-elasticity matrix. Also all of the customers have had identical demand-price elasticity matrix till now. But in a practical power system, various customers are present with taking a variety of demand-price elasticity. Therefore this paper proposes demand-price sensitivity to represent different demand-price elasticity. Also as proposing demand-reliability sensitivity, it is modeling various customers' characteristics to reliability. And then this paper calculates total expected interruption cost of customer from the customer interruption cost and the demand-reliability sensitivity. A total expected interruption cost of system is shown as opportunity cost of a generation cost.

Study on Reserve Requirement for Wind Power Penetration based on the Cost/Reliability Analysis

  • Shin, Je-Seok;Kim, Jin-O;Bae, In-Su
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.4
    • /
    • pp.1397-1405
    • /
    • 2017
  • As the introduction of wind power is steadily increasing, negative effects of wind power become more important. To operate a power system more reliable, the system operator needs to recognize the maximum required capacity of available generators for a certain period. For recognizing the maximum capacity, this paper proposes a methodology to determine an optimal reserve requirement considering wind power, for the certain period in the mid-term perspective. As wind speed is predicted earlier, the difference of the forecasted and the actual wind speed becomes greater. All possible forecast errors should be considered in determining optimal reserve, and they are represented explicitly by the proposed matrix form in this paper. In addition, impacts of the generator failure are also analyzed using the matrix form. Through three main stages which are the scheduling, contingency and evaluation stages, costs associated with power generation, reserve procurement and the usage, and the reliability cost are calculated. The optimal reserve requirement is determined so as to minimize the sum of these costs based on the cost/reliability analysis. In case study, it is performed to analyze the impact of wind power penetration on the reserve requirement, and how major factors affect it.

Optimal Placement of Phasor Measurement Unit for Observation Reliability Enhancement

  • TRAN, Van-Khoi;ZHANG, He-sheng;NGUYEN, Van-Nghia
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.3
    • /
    • pp.996-1006
    • /
    • 2017
  • Phasor Measurement Unit (PMU) placement is a crucial problem for State Estimation (SE) of the power system, which can ensure that the power network is fully observed. Further, the observation reliability problem of the system has been concerned in the operation conditions. In this paper, based on modified weighted adjacent matrix ($A_w$), an optimal placement method is proposed to solve simultaneously two problems involving the optimal PMU placement problem and the observation reliability enhancement problem of the system. The purpose of the proposed method is to achieve both the minimum total cost and the maximum observation reliability, with a focus on increasing the security of observability, strengthening the observation reliability of buses as well as enhancing the effectiveness of redundancy. Simulations on IEEE 14, 24, 30 and 57 bus test systems are presented to justify the methodology. The results of this study show that the proposed method is not only ensuring the power network having the observability effectively but also enhancing significantly the observation reliability. Therefore, it can be a useful tool for SE of the power system.

Accelerated life test plan under modified ramp-stress loading with two stress factors

  • Srivastava, P.W.;Gupta, T.
    • International Journal of Reliability and Applications
    • /
    • v.18 no.2
    • /
    • pp.21-44
    • /
    • 2017
  • Accelerated life tests (ALTs) are frequently used in manufacturing industries to evaluate the reliability of products within a reasonable amount of time and cost. Test units are subjected to elevated stresses which yield quick failures. Most of the previous works on designing ALT plans are focused on tests that involve a single stress. Many times more than one stress factor influence the product's functioning. This paper deals with the design of optimum modified ramp-stress ALT plan for Burr type XII distribution with Type-I censoring under two stress factors, viz., voltage and switching rate each at two levels- low and high. It is assumed that usage time to failure is power law function of switching rate, and voltage increases linearly with time according to modified ramp-stress scheme. The cumulative exposure model is used to incorporate the effect of changing stresses. The optimum plan is devised using D-optimality criterion wherein the ${\log}_{10}$ of the determinant of Fisher information matrix is maximized. The method developed has been explained using a numerical example and sensitivity carried out.

  • PDF

Recent Research Activities for Continuous SiC Fiber Reinforced Ceramic Matrix Composites in Japan (일본에서의 탄화규소장섬유세라믹스강화 복합재료 연구개발)

  • Ogasawara, Toshio
    • Ceramist
    • /
    • v.9 no.6
    • /
    • pp.18-23
    • /
    • 2006
  • In this article, the present activities regarding research and development of continuous SiC fiber reinforced ceramic matrix composites (CFCC) in Japan are reviewed. The key technologies in SiC fiber composites are interphase between fiber and matrix and its oxidation resistance. To improve oxidation resistance of interphase, various kinds of technologies such as environment barrier coating, high dense matrix, unti-oxidation matrix, multi-layered intephase have been developed. It is suggested that high performance, affordable processing cost, and excellent reliability will be important factors to be in practical use of CMCs in future.

  • PDF

Finite Control Set Model Predictive Control of AC/DC Matrix Converter for Grid-Connected Battery Energy Storage Application

  • Feng, Bo;Lin, Hua
    • Journal of Power Electronics
    • /
    • v.15 no.4
    • /
    • pp.1006-1017
    • /
    • 2015
  • This paper presents a finite control set model predictive control (FCS-MPC) strategy for the AC/DC matrix converter used in grid-connected battery energy storage system (BESS). First, to control the grid current properly, the DC current is also included in the cost function because of input and output direct coupling. The DC current reference is generated based on the dynamic relationship of the two currents, so the grid current gains improved transient state performance. Furthermore, the steady state error is reduced by adding a closed-loop. Second, a Luenberger observer is adopted to detect the AC input voltage instead of sensors, so the cost is reduced and the reliability can be enhanced. Third, a switching state pre-selection method that only needs to evaluate half of the active switching states is presented, with the advantages of shorter calculation time, no high dv/dt at the DC terminal, and less switching loss. The robustness under grid voltage distortion and parameter sensibility are discussed as well. Simulation and experimental results confirm the good performance of the proposed scheme for battery charging and discharging control.

Reliability Evaluation on the Transit O/D matrix from Traffic Counts (통행량 기반 대중교통 기종점행량(O/D) 추정의 신뢰성 평가에 관한 연구)

  • 이신해;문수연;이승재;임강원;최인준
    • Journal of Korean Society of Transportation
    • /
    • v.19 no.5
    • /
    • pp.61-70
    • /
    • 2001
  • The origin and destination(O-D) matrix is one of the most important elements in transportation planning process. Traditionally, transport planners survey the O-D movements in order to estimate the O-D matrix. Even though the cost of the O-D survey requires high amounts of resources, the accuracy is relatively low. Therefore, many researchers have studied the estimation of the O-D matrix for automobile from traffic counts. however, there is a little attention for the application on the transit O-D matrix estimation from traffic counts. The objective of this study is therefore the estimation of the transit O-D matrix from traffic counts using Gradient method. which is verified by the reliability analysis using a contrived small example network.

  • PDF

Determining Optimal Installed Capacity and the Interconnected Bus of Renewable Energy Sources Considering the Cost of Energy Not Supplied (정전비용을 고려한 신재생에너지원의 최적 연계 용량 및 연계 위치 결정에 관한 연구)

  • Kim, Sung-Yul;Lee, Sung-Hun;Kim, Jin-O
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.10
    • /
    • pp.1393-1398
    • /
    • 2012
  • Due to environmental regulation and technical improvements, renewable energy sources (RES) are increasingly penetrated and operated in power systems. Clean energy technologies have become cost-competitive with conventional power systems, and in the near future, the generation cost of RES is expected to approach grid parity. In this situation, it should be considered an extraordinarily important issue to be maximized resulting in utilization of RES as well as to develop technologies for efficiency improvement of RES. Therefore, in this paper, the method for determining an optimal installed capacity and interconnected location of RES is proposed in order to minimize the cost of energy not supplied, which can contribute to improve distribution reliability.

Service Deployment Strategy for Customer Experience and Cost Optimization under Hybrid Network Computing Environment

  • Ning Wang;Huiqing Wang;Xiaoting Wang
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.17 no.11
    • /
    • pp.3030-3049
    • /
    • 2023
  • With the development and wide application of hybrid network computing modes like cloud computing, edge computing and fog computing, the customer service requests and the collaborative optimization of various computing resources face huge challenges. Considering the characteristics of network environment resources, the optimized deployment of service resources is a feasible solution. So, in this paper, the optimal goals for deploying service resources are customer experience and service cost. The focus is on the system impact of deploying services on load, fault tolerance, service cost, and quality of service (QoS). Therefore, the alternate node filtering algorithm (ANF) and the adjustment factor of cost matrix are proposed in this paper to enhance the system service performance without changing the minimum total service cost, and corresponding theoretical proof has been provided. In addition, for improving the fault tolerance of system, the alternate node preference factor and algorithm (ANP) are presented, which can effectively reduce the probability of data copy loss, based on which an improved cost-efficient replica deployment strategy named ICERD is given. Finally, by simulating the random occurrence of cloud node failures in the experiments and comparing the ICERD strategy with representative strategies, it has been validated that the ICERD strategy proposed in this paper not only effectively reduces customer access latency, meets customers' QoS requests, and improves system service quality, but also maintains the load balancing of the entire system, reduces service cost, enhances system fault tolerance, which further confirm the effectiveness and reliability of the ICERD strategy.