• Title/Summary/Keyword: Reinforcement of the safety

Search Result 754, Processing Time 0.029 seconds

The Computation of Reinforcement Length of Afforestation Slope (사면녹화 보강토공법의 보강재길이 산정에 관한 연구)

  • Park, Sik-Choon;Nam, Kwang-On;Kim, Jong-Hwan;Lee, Soo-Yang
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1302-1308
    • /
    • 2010
  • This study the change of the safety factor before and after the reinforcement were compared by performing the parameter research based on the limit equilibrium analysis regarding the same cross section after carrying out the safety factor before the reinforcement on the virtual section in order to observe the change of the safety factor of the slop reinforced with the slope planting reinforced earth, and the variation of the safety factor according to the increase of the length of the reinforcement materials and the change of the slope height was analyzed. As the result, the reinforcement effect was insignificant at no more than 0.6 of L/H, the reinforcement length ratio when the reinforcement length was increased, as the increase of the safety factor was slow comparing with the non-reinforced slope. At 3.0m of the slope height, reinforcement on the slope is not necessary, and at 3.0m to 5.0m of the slope height, the inclination was not influencing at no less than 0.6 of L/H. At 5.0m to 9.0m of the slope height, the safety factor was mostly secured on the slope at 0.8 of L/H and the over-reinforced slope appeared at no less than 1.0 of L/H. Also, the safety factor increased as the slope height increases and the slope gets steeper till 0.8 of L/H, but the slope steepness affects more on the increase of the safety factor than the reinforcement material, as the reinforcing force by the reinforcement material became steady.

  • PDF

A Case study on the construction badness for slope reinforcement (사면보강공법 시공불량사례 검토를 통한 개선방안 연구)

  • Kwon, Sung-Ju;Kim, Yong-Soo;Chang, Bum-Soo;Nah, Kwang-Hee
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.739-744
    • /
    • 2005
  • The construction road work are increasing now. And the domestic slope construction are steadily increased and changed the complicated and large-scale. Therefore ground reinforcement for slope stabilization has been increasingly used during the past few decades with a wide variety of techniques including soil nailing, rock bolt, anchor and different types. But in some cases which applied slope reinforcement construction by badness or mistake. So this paper is the study of construction badness for slope reinforcement.

  • PDF

Systems to prevent the load resistance loss of pallet racks exposed to cyclic external force

  • Heo, Gwanghee;Kim, Chunggil;Baek, Eunrim;Jeon, Seunggon
    • Structural Engineering and Mechanics
    • /
    • v.83 no.6
    • /
    • pp.745-756
    • /
    • 2022
  • This study aims to determine the cause of the load resistance loss in storage racks that can be attributed to external forces such as earthquakes and to improve safety by developing reinforcement systems that can prevent load resistance loss. To this end, a static cyclic loading test was performed on pallet racks commonly used in logistics warehouses. The test results indicated that a pallet rack exposed to an external force loses more than 50% of its load resistance owing to the damage caused to column-beam joints. Three reinforcement systems were developed for preventing load resistance loss in storage racks exposed to an external force and for performing differentiated target functions: column reinforcement device, seismic damper, and viscoelastic damper. Shake table testing was performed to evaluate the earthquake response and verify the performance of these reinforcement systems. The results confirmed that, the maximum displacement, which causes the loss of load resistance and the permanent deformation of racks under external force, is reduced using the developed reinforcement devices. Thus, the appropriate selection of the developed reinforcement devices by users can help secure the safety of the storage racks.

A Study on Reinforcement for Slope Stability of Gentle Inclination Slope Collapse Occurrence Area (완경사 사면붕괴 지역의 안전성 보강대책 연구)

  • 이승호;황영철;조성민;노흥제;이은동
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.06a
    • /
    • pp.83-91
    • /
    • 2003
  • Always slope according to construct road exist danger because of environment unstability factor in slope, Since this research an inclination of slope is gentle slope (1:1.5∼1:9.0) but falling happened by conduct of continuous ground movement. And this study considered more economical and efficient reinforcement method for slope stability. The various reinforcement methods are applied to execute examination of slope stability. Applied reinforcement methods satisfied safety factor And this research region is performing continuous measurement about ground movements and displacements.

  • PDF

Bending and Shear Capacity of Reinforced Concrete Protective Wall (휨과 전단을 고려한 철근콘크리트 방호벽 성능에 관한 연구)

  • Young Beom Kwon;Jong Yil Park
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.2
    • /
    • pp.44-51
    • /
    • 2023
  • With the recent increase in gas energy use, risk management for explosion accidents has been emphasized. Protective walls can be used to reduce damage from explosions. The KOSHA GUIDE D-65-2018 suggests the minimum thickness and height of protective walls, minimum reinforcement diameter, and maximum spacing of reinforcements for the structural safety of the protective walls. However, no related evidence has been presented. In this study, the blast load carrying capacity of the protective wall was analyzed by the pressure-impulse diagrams while changing the yield strength of the reinforcement, concrete compressive strength, reinforcement ratio, protective wall height, and thickness, to check the adequacy of the KOSHA GUIDE. Results show that failure may occur even with design based on the criteria presented by KOSHA GUIDE. In order to achieve structural safety of protective walls, additional criteria for minimum reinforcement yield strength and maximum height of protective wall are suggested for inclusion in KOSHA GUIDE. Moreover, the existing value for minimum reinforcement ratio and the thickness of the protective wall should be increased.

Case Studies of Automatic Measurement and strength for Damage in the Public Tunnel (공용중인 터널의 변상에 대한 보강 및 자동화계측 사례)

  • Han Ja-Jung;Kim Young-Ho;Jang Gi-Soo;Kweon Young-Jung;Ahn Sang-Ro
    • 한국터널공학회:학술대회논문집
    • /
    • 2005.04a
    • /
    • pp.270-281
    • /
    • 2005
  • An especial attention for old tunnel safety is required on increasing of The various tunnel recently. Specially, the lining investigation method of the old tunnel will be able to presume condition of concrete lining indirectly. Because it is many restriction thought of environment and ground condition investigation method of tunnel lining rear. This study carried out section & convergence measurement of part which was deformed in tunnel lining. It had been observed for the change of tunnel behavior with a continuous measurement. It has been analyzed for a cause of tunnel deformation and inspected for the effect after a repair-reinforcement to tunnel compared with the effect before those by structure analysis. By establishing automatic measurement system after repair-reinforcement to tunnel, it would be accomplished to convergence measurement continually. As a result, it was observed that deflection and deformation of tunnel was convergent. but it should be followed to a continuous maintenance because of unstable ground condition, cause of inner tunnel, environment. The railroad tunnel which was executed a reinforcement of the tunnel lining must investigate the close condition of reinforcement lining and concrete lining.

  • PDF

Need for Reinforcement of Safety Assessment on Genetically Modified Organisms (GMO 안전성평가제도의 고찰)

  • Kim Eun-Jin;Choi Dong-Keun
    • Korean Journal of Organic Agriculture
    • /
    • v.14 no.2
    • /
    • pp.139-157
    • /
    • 2006
  • Biotechnology has reached the level of giving birth to new forms of life and with this is a growing controversy in the conflict between science and ethics. Especially, GMOs are closely linked to the food products we consume and thus, the majority of the public shows a very sensitive reaction to the safety of GMO food products. Many perspectives arose surrounding the issues of safety on the human body and the ecology. This outlines diverse structural mechanisms to be set up to ensure safety such as risk assessment, risk management etc. Despite the precautionary principle guaranteed in many ways, the problem arises whether and how this principle can be taken in the safety assessment. GMOs due to its uniqueness do not end with just the possession of the technology involved but must also be considered with the prerequisite that they could be cultured again. Therefore the reinforcement of safety assessment system is necessary. That is, the reinforcement of risk assessment including field tests, the consideration of socio-economic effects, the coordinated system of relevant authorities, the development of technology for safety assessment.

  • PDF

Experimental study on nano silica modified cement base grouting reinforcement materials

  • Zhou, Fei;Sun, Wenbin;Shao, Jianli;Kong, Lingjun;Geng, Xueyu
    • Geomechanics and Engineering
    • /
    • v.20 no.1
    • /
    • pp.67-73
    • /
    • 2020
  • With the increasing number of underground projects, the problem of rock-water coupling catastrophe has increasingly become the focus of safety. Grouting reinforcement is gradually applied in subway, tunnel, bridge reinforcement, coal mine floor and other construction projects. At present, cement-based grouting materials are easy to shrink and have low strength after solidification. In order to overcome the special problems of high water pressure and high in-situ stress in deep part and improve the reinforcement effect. In view of the mining conditions of deep surrounding rock, a new type of cement-based reinforcement material was developed. We analyses the principle and main indexes of floor strengthening, and tests and optimizes the indexes and proportions of the two materials through laboratory tests. Then, observes and compares the microstructures of the optimized floor strengthening materials with those of the traditional strengthening materials through scanning electron microscopy. The test results show that 42.5 Portland cement-based grouting reinforcement material has the advantages of slight expansion, anti-dry-shrinkage, high compressive strength and high density when the water-cement ratio is 0.4, the content of bentonite is 4%, and the content of Nano Silica is 2.5%. The reinforcement effect is better than other traditional grouting reinforcement materials.

Development of the Fuzzy Expert System for the Reinforcement of the Tunnel Construction (터널 시공 중 보강공법 선정용 퍼지 전문가 시스템 개발)

  • 김창용;박치현;배규진;홍성완;오명렬
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.101-108
    • /
    • 2000
  • In this study, an expert system was developed to predict the safety of tunnel and choose proper tunnel reinforcement system using fuzzy quantification theory and fuzzy inference rule based on tunnel information database. The expert system developed in this study have two main parts named pre-module and post-module. Pre-module decides tunnel information imput items based on the tunnel face mapping information which can be easily obtained in-situ site. Then, using fuzzy quantification theory II, fuzzy membership function is composed and tunnel safety level is inferred through this membership function. The comparison result between the predicted reinforcement system level and measured ones was very similar. In-situ data were obtained in three tunnel sites including subway tunnel under Han river, This system will be very helpful to make the most of in-situ data and suggest proper applicability of tunnel reinforcement system developing more resonable tunnel support method from dependance of some experienced experts for the absent of guide.

  • PDF

Study on Establishing Earthquake-resistance Reinforcement Measures for Earthquake Disasters in National Industrial Complexes (국가산업단지의 지진재난 내진보강대책 수립 연구)

  • Chang Young Song
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.4
    • /
    • pp.882-896
    • /
    • 2023
  • Pupose: The purpose is to prepare safety management and seismic reinforcement measures that can effectively improve the potential risks of earthquake-resistant design and the deficiencies of safety guidance and inspection of factory facilities in national industrial complexes. Method: In this study, problems and improvement measures were derived through investigation and analysis of overall earthquake disaster safety management, such as safety management status and management system in preparation for earthquake disasters in national industrial complexes. was implemented to suggest improvement plans based on facility types and structural characteristics. Result: In conclusion, the problems of safety management and seismic reinforcement in preparation for earthquake disasters in national industrial complexes were summarized and classified into four types (seismic performance evaluation and related system supplementation, authority of tenant companies and local governments, seismic reinforcement and safety management support measures, organizational structure capacity building) to derive improvement measures. Conclusion: Based on this, seismic reinforcement measures that companies in national industrial complexes should implement in preparation for earthquake disasters were prepared, and detailed plans for each measure were presented.