• 제목/요약/키워드: Regular maintenance

검색결과 299건 처리시간 0.028초

초전도케이블시스템 유지.보수에 따른 신뢰성 평가 시험 (Reliability Assesment Test on the Regular Maintenance of HTS Cable System)

  • 손송호;양형석;임지현;최하옥;김동락;류희석;황시돌
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2009년도 하계학술대회 논문집
    • /
    • pp.361-361
    • /
    • 2009
  • KEPCO High Temperature Superconducting (HTS) cable system rated with $3\Phi$, 22.9kV, 1250A was laid in 2006, and the long term test is in progress. The HTS cable system with the cooling system has been operated below cryogenic temperature. That environment exposes the system to the thermo-mechanical stress due to the significant temperature difference, and the cooling system has moving parts for the forced circulation of the coolant. Therefore the HTS cable system experiences thermal fatigue and moving part such as liquid nitrogen pump need a regular replacement every 5000 hours Building the assessment criterion, the maintenance procedure was established and regular preventive maintenance was done; improvement of the termination structure and the replacement of the bearing of liquid nitrogen pump. Following the proper process, the reliability assessment test including He leakage detection and the stability of flow rate was performed. This paper describes the process and result of the first regular maintenance of KEPCO HTS cable system

  • PDF

임상가를 위한 특집 1 - Peri-implant disease를 방지하기 위한 Supportive Periodontal Therapy(SPT)의 중요성 (The importance of SPT(Supportive Periodontal Therapy) for prevention of peri-implant disease)

  • 박수정
    • 대한치과의사협회지
    • /
    • 제51권12호
    • /
    • pp.630-636
    • /
    • 2013
  • During the past decade, the use of osseointegrated implants as a foundation for prosthetic replacement of missing teeth has become highly predictable and successful. SPT(Supportive Periodontal Therapy) identified as regular visits to the therapist for periodontal control and maintenance in a well-organized scheme, the number of appointments per year following a pre-designed subject-tooth/implant-site risk assessment method. Peri-implant disease was a frequent finding in subjects having natural healthy dentition and in subjects without periodontitis. Supportive periodontal program were found to be strongly related to implant survival. This study demonstrates that regular maintenance reduces the risk for peri-implant inflammation significantly as compared with irregular maintenance. This underlines the value of the SPT in enhancing the long-term outcomes of implant therapy, particularly in subjects affected by periodontitis, in order to control reinfection and limit biological complications. It is highly recommended to maintain implant patients under a strict supportive periodontal treatment protocol that might contribute to implant survival, and regular maintenance reduces the risk for periimplant inflammation significantly as compared with irregular maintenance. Ideally, patients may be informed on the beneficial effect of a regular patient-related post-therapy care before implant insertion.

전업농가의 농업기계 정기 점검정비 실태조사 (Survey on the Regular Maintenance of Agricultural Machinery for the Full-Time Farmers)

  • 이성범;이종환;이운룡;강지원
    • Journal of Biosystems Engineering
    • /
    • 제26권4호
    • /
    • pp.323-330
    • /
    • 2001
  • The regular maintenance and repair status of major farm machinery such as power tiller, farm tractor, rice transplanter and combine harvester etc., were surveyed and analyzed for the full-time farmers in order to get basic information for promoting farm machinery productivity. The survey was carried out through 209 farmers from 9 provinces. The results of this study can be summarized as follows; 1. The regular maintenance of farm machinery was conducted at repair shop(49.5%) or dealer agency(12.0%), and also conducted by farmers at their house(34.9%). 2. For the status on the cleanness or exchange times of engine oil, fuel filter and air cleaner, most farmers conducted fewer times than the necessary times. And, 5.3%, 7.7%, and 2.9% of surveyed farmers experienced breakdowns due to the insufficient cleanness or exchange oil, fuel filer, and air cleaner, respectively. 3. Most farmers(76.1%) recognized the necessity of farm machinery training or education, and they preferred one week for the training period, simple or easy maintenance for the training level, agricultural technical center or farm machinery manufacturer for the training agency. 4. Complete recognition of operation manual and sufficient maintenance before-, during-, and after-operation for the farm machinery can minimize the breakdowns, enlarge the endurance prevent the safety accidents, and promote productivity of farm machinery. And, these can be accomplished by the thorough training or education for agricultural machinery.

  • PDF

산업용 오버헤드 도어의 사고 예방 : 유지관리 및 병렬구조 안전장치를 중심으로 (Safety of Industrial Overhead Doors : A Review of Maintenance and Parallel Safety Devices)

  • 김복기;정재욱
    • 한국안전학회지
    • /
    • 제39권1호
    • /
    • pp.33-40
    • /
    • 2024
  • This study analyzes the impact of regular preventive maintenance (PM) on reducing the failure rate and occurrence of falling accidents of industrial overhead doors. A reliable safety device model with an additional safety device, which is installed to replace a defective one, is proposed. The research methodology involves collecting breakdown and falling accident records, comparing and analyzing data before and after regular PM implementation, and experimenting with two types of retrofittable safety devices. Key findings are as follows. 1. Regular PM implementation significantly reduces the failure rate of old overhead doors. 2. A parallel structured model with two alternative safety devices can minimize falling accident risks. The study's contributions include the following. 1. The positive impact of PM on extending overhead door lifespan is quantified. 2. A general safety device model that can be retrofitted and used as replacement with a fail-safe function is proposed.

임플란트 환자의 잇솔질 교육경험에 따른 유지관리행태 연구 (Study of maintenance behavior based on the experience of the tooth brushing instruction for implant patient)

  • 전지현;민희홍
    • 한국치위생학회지
    • /
    • 제13권3호
    • /
    • pp.403-410
    • /
    • 2013
  • Objectives : This study aims to provide the basic data for the maintenance and management of healthy implants through finding out the educational experience of toothbrushing and the oral hygiene management for the implant patients and to determine the maintenance measure. Methods : From April 1 to october 1, 2012, 250 patients in the dental clinic in Daejeon completed the self-reported questionnaire. Results : As for the educational experience of toothbrushing, 66.4 percent received the training for toothbrushing and 33.6 percent had not received the training for toothbrushing. Those who brushed three times a day accounted for 74.1 percent. Those who received the training for toothbrushing comprised 56.0 percent and took regular check up of every 6 months. Approximately 50.0% received regular scaling service every 6 months. Periodical medical check up comprised 55.6% among those who received toothbrushing education. Approximately 63.9% thought that periodical medical check up is the most important to maintain oral health. Conclusions : There were important factors for oral health. They were tooth-brushing, the utilization of various oral hygienic products, and the awareness of importance of oral hygiene management. The customized education program for the general public should be implemented as regular as possible.

청소년의 아침식사와 운동 행동변화단계에 따른 영양지식, 식이자기효능감과 식습관 (Nutrition Knowledge, Dietary Self-Efficacy and Eating Habits According to Student's Stage of Regular Breakfast or Exercise)

  • 최미영;김혜영
    • 대한지역사회영양학회지
    • /
    • 제13권5호
    • /
    • pp.653-662
    • /
    • 2008
  • This study has been performed to analyze nutrition knowledge, dietary self-efficacy and eating habits of the elementary- and middle- school students (n = 342) according to student's stage of regular breakfast or exercise. Middle school students had higher nutrition knowledge than primary school students. Total dietary self-efficacy and dietary habit scores were not different by school year and gender. Nutrition knowledge, dietary self-efficacy and dietary habit scores were positively correlated each other. By the stage of regular breakfast, the pre-contemplation stage comprised 13.6%, contemplation 2.1%, preparation 15.7%, action 11.5% and maintenance stage 59.1%. By the stage of regular exercise, the pre-contemplation stage comprised 20.9%, contemplation 7.3%, preparation 45.6%, action 9.8% and maintenance stage 16.4%. According to the stage of change, movement from the pre-contemplation and contemplation to upper stage increased the dietary self-efficacy score. Dietary habit score increased significantly across the five stages of changes. The results of this study indicate differences in stages of changes in breakfast intake and regular exercise and indicate the need for taking these phases of change into account in nutrition education.

회귀분석을 이용한 합리적인 교육시설물 점검시간의 산정 기준 도출에 관한 연구 (A Study on Deduction of Reasonable Inspection Time in Educational Facilities Based on Regression Analysis)

  • 석현수;조창연;김재온;손재호
    • 교육시설
    • /
    • 제14권4호
    • /
    • pp.34-42
    • /
    • 2007
  • The investment of BTL(Build-Transfer-Lease) projects for the educational facilities has been increased since 2005. However, many trial errors and problems have been occurring due to the lack of inspection criteria in maintenance cost for the lift cycle of the facilities. Thus, purpose of this study is to derive regression equation for the daily inspection and the regular inspection through analysis of CAD data in order to set the inspection criteria. It is possible to calculate economical maintenance cost of BTL project in educational facilities using criteria of inspection time through the regression equation developed in this study.

교육시설물의 안전점검 평가에 따른 향후 유지관리에 관한 연구 (A Study on the Future Maintenance of Educational Facilities According to the Evaluation of Safety Inspection)

  • 박옥남;김진구;이화룡;오혜령
    • 교육시설 논문지
    • /
    • 제28권1호
    • /
    • pp.3-11
    • /
    • 2021
  • According to the Gyeonggi Provincial Office of Education's 2018 Education Statistics, there are 4,692 schools in Korea, and most of them were built before 1985 and the aging of facilities due to earthquake and external environment has reached a serious point and are vulnerable to safety. The Gyeonggi Provincial Office of Education designated 2,561 buildings with floor space of 1,000 square meters or more under the "Special Act on Safety and Maintenance of Facilities (2018.1.18. Full Revision)" and conducted regular safety inspections. The purpose of this study is to analyze the evaluation of school facilities according to the results of a regular safety inspection and to propose a maintenance plan for educational facilities for future defects according to the conditions of the facilities.

예방(예지) 정비의 필요성 (Not Preventive Maintenance, But Predictive Maintenance)

  • 전형식
    • 소음진동
    • /
    • 제4권4호
    • /
    • pp.459-467
    • /
    • 1994
  • Various maintenance programs and techniques have been implemented for roating machineries, since machines were invented for commerical use. The earliest type of maintenance was run-to-failure, where the machine was run until a fault caused to fail in service. It was obviously an expensive approach due to the unpredictability of the machine condition. Another type is the periodic maintenance, where machines are disassembled and overhauled on regular schedules. With the advent of reliable data collectors including FFT analyzer and developing of versatile supporting software such as ExpertALERT system, the predictive maintenance is known to be the most feasible maintenance type these days. The vibration analysis enables for a maintenance crew to find the exact cause of fault on a machine and to make a proper maintenance schedule with a trend analysis. The predicitive maintenance is considered to be the most important part of pro-active maintenance.

  • PDF

농업기계 정기점검정비 실태조사 (Survey on the Regular Maintenance of Agricultural Machinery)

  • 강지원;이운용;이성범;이종환
    • 현장농수산연구지
    • /
    • 제3권1호
    • /
    • pp.142-157
    • /
    • 2001
  • This study was conducted to get the basic information for promoting farm machinery productivity by surveying the regular maintenance and repair status of major farm machinery such as power tiller, farm tractor, rice transplanter and combine harvester. The survey was carried out through 9 provinces including Cheju province by direct visiting farmers with prepared questionnaire. The results of this study can be summarized as follows : 1. The average farming carrier of the surveyed farmers was 25.3 years, and 21-30 years of farming carrier showed the highest portion as 40.7%. The average carrier of using farm machinery was 9.4 years, and that was 14.9 years for power tiller, 8.3 years for farm tractor, 9.0 years for rice transplanter, 7.9 years for combine harvester, 7.5 years for mini tiller, 9.7 years for power sprayer, and 8.2 years for binder etc. 2. The regular maintenance for farm machinery was conducted mainly at repair shop (49.5%) or dealer agency (12.0%) as 61.5%, and 34.9% of farmers conducted the regular maintenance by themselves at their house. 3. The reasons for not-fully recognizing operation manual and insufficient before-, during-, after-maintenance of farm machinery were insufficient time for them (45.8%), troublesome (22.9%), unknown maintenance method (16.3%), unknown the necessity for maintenance (12.4%), and others (2.6%) in order. 4. For the annual exchange of engine oil, 3.2 times is necessary but actually 1.7 times was exchanged for power tiller, 4.3 times is necessary but actually 1.9 times was exchanged for farm tractor, 2.7 times is necessary but actually 1.7 times was exchanged for rice transplanter, 2.2 times is necessary but actually 2.3 times was exchanged combine harvester. 5. For the annual cleanness or exchange of fuel filter, 3.2 times is necessary but actually 1.1 times was done for power tiller, 4.3 times is necessary but actually 1.6 times was done for farm tractor, 2.7 times is necessary but actually 1.7 times was done for rice transplanter, 1.9 times is necessary but actually 0.8 times was done for combine harvester. 6. For the annual cleanness or exchange of air filter, 3.2 times is necessary but actually 1.4 times was done for power tiller, 4.2 times is necessary but actually 2.4 times was done for farm tractor, 2.6 times is necessary but actually 1.6 times was done for rice transplanter, 3.9 times is necessary but actually 7.0 times was done for combine harvester. 7. For the experience of breakdown related to maintenance, 5.3% of farmers experienced breakdown due to the insufficient exchange of engine oil, 7.7% of farmers experienced breakdown due to the insufficient cleanness or exchange of fuel filter, and 2.9% of farmers experienced breakdown due to the insufficient cleanness or exchange of air filter. 8. Most farmers (76.1%) recognized the necessity for agricultural machinery training or education, and most farmers preferred about one week for the training period, simple or ease maintenance for the training level, agricultural technical center or agricultural machinery manufacturer for the training agency. 9. Complete recognition of operation manual and sufficient before-, during-, and after-maintenance for farm machinery can minimize the breakdown as well as conduct suitable period farming, enlarge the endurance, prevent the safety accidents, and promote productivity of farm machinery. Therefore, these can be accomplished by the thorough training or education for agricultural machinery.