The Case Study on the Erection Construction Method for Soft Retractable Roof Structures (연성개폐 지붕구조물 Erection 시공법에 관한 사례 연구)

  • Park, Keum-Sung;Kim, Hyung-Do;Kwak, Myong-Keun
    • Journal of Korean Association for Spatial Structures
    • /
    • v.16 no.4
    • /
    • pp.101-108
    • /
    • 2016
  • Lifting plan in the large spacial structure is an important factor influencing the efficiency and economy of the construction process. The purpose of this study was deriving the requirements for lifting techniques as the basic research in the double spoke wheel roof structure construction. In the lift up erection method, management plan of the interference error in the column and outer-ring was needed that occur during lifting roof structure. In the bent erection method, material usage reduction plan was required by the structural design of the temporary bent. In the hybrid erection method, lifting plan was needed that minimizes weather condition and crane usage. All lifting techniques were required Value Engineering model for reduction of cost and construction period.

Performance Analysis of SMART Frame Applied to Logistics Buildings (물류시설에 SMART Frame 적용시 효용성 분석)

  • Son, Seung-Hyun;Kim, Ki-Ho;Lee, Jun-Ah;Kim, Sun-kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.14-15
    • /
    • 2018
  • Logistics facilities are characterized by wide spans and high flooring, most of which are constructed with PC (Precast Concrete) methods to meet a wide range of commercial and industrial needs. However, the PC structure is a pin joint design, and the construction cost is increased due to the restrictions caused by the installation process, and the construction period is lengthened. In order to solve the above problem, SMART Frame, which is a structural system similar to the steel frame structure, was developed by embedding a steel frame at both ends of the PC. The purpose of this study is to analyze the erection time reduction effect of steel connected precast concrete components (SMART frames) for long span and heavy loaded logistics buildings compared to existing PC frames. For this study, a logistics building constructed with pin joint PC components is selected as a case. The result is compared with the existing PC frame to confirm the erection time reduction effect.

  • PDF

Development of Stone Curtain Wall Anchor Method for the Constructability Improvement (시공성이 개선된 석재 외장재 앵커공법 개발)

  • Park, Nam Wook;Kim, Jong Seong;Kim, Sung Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.76-77
    • /
    • 2014
  • Stone is one of the oldest and most popular materials used on the external wall because of its durability, abundance and aesthetic effect. However, there are two main problems in the existing pin hole construction method. One is uniformity of construction quality, and the other is a repair work of stone panels. Therefore, a new method is needed to overcome these problems. This paper presents a new stone curtain wall system using under cut anchor and secondary holes that was developed by authors. The improved quality and reduction of construction period can be obtained by this system.

  • PDF

Application of MRS(Multi Ribbed Slab) System with 4Story-1Piece Columns (4층(層)1절(節) 기둥을 이용한 MRS(Multi Ribbed Slab)공법 적용)

  • Kim, Jung-Taek;Im, Ju-Heuk;Jeon, Byong-Kap;Kim, Yong-Nam
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.85-88
    • /
    • 2011
  • MRS(Multi Ribbed Slab) method was developed to accomodate Korean construction practice and needs of Korean customer. By means of 4story-1piece column and MRS method, we achieved construction cost cut down and reduction of construction period.

  • PDF

The Analysis of User Cost according to Timing of National Highway Pavement Maintenance-Focusing on the Maesang Bidge Section in Korea

  • Kim, Yunsik;Lee, Minjae
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.606-607
    • /
    • 2015
  • The traffic volume on the road shows various trends reflecting regional characteristics for monthly and hourly, and economic loss affecting users varies according to the selected period for the maintenance of road pavements. Therefore, in this study, the user cost (or delay cost) for monthly and hourly on the work zone near the Maesang Bridge Section on Poseung-Gu, Pyeongtaek-si, Gyeonggi-do was calculated using the time series models and VISSIM, and based on the result, the effect of user cost reduction according to the selection of best maintenance period was examined. The analysis result showed that the month of the lowest user cost occurred due to the maintenance of target section was January (10,293,258 KRW/Day×1km) and the month of the greatest user cost occurred was November (13,337,495 KRW/Day×1km).

  • PDF

GMP Calculation Process in CM at Risk for Public Construction Project (공공 건설사업 CM at Risk 적용시 GMP 산출 프로세스)

  • Kim, Gun-Sung;Jin, Zheng-Xun;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.48-49
    • /
    • 2020
  • Recently the diversification of construction market and the continuous reduction of construction amount are raising the need of alternative delivery method in the construction industry. The foreign advanced companies actively adopted the CM at Risk delivery method where they perform the service of agent CM in the design phase, and agree GMP(Guaranteed Maximum Price) with the client at the time of 50~80% completion of design. Even in Korea they began to apply that method to pilot projects. In CM at Risk, through the early participation of builder, the level of design completion can be improved and the change order and construction period delay can be minimized. On the other hand, GMP is usually calculated when the design is about 80% complete, so there is uncertainty in the construction cost. Therefore, in this research, the increased amounts of construction cost are analyzed in a number of public construction projects, and GMP calculation process is proposed using the analysis results and CBR(Case-Based Reasoning) technique to reduce the construction cost increase in the construction phase.

  • PDF

Guideline for Web 2.0 Cluster based Process and Performance Management System (Web 2.0 Cluster 기반의 공정 및 성과관리 시스템 구축에 따른 운영방안 제시)

  • Ong, Ho-Kyoung;Ahn, Jae-Gyu;Kim, Dae-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.899-904
    • /
    • 2007
  • Process management techniques are highly important in the construction industry. However, indicators or details of assessment which will show process management and its performance are still very insufficient. In particular, it is true that local corporations or small and medium sized companies suffer more difficulties than ones in metropolitan areas. Therefore, it is necessary to prepare a flexible process management and performance assessment system suited to field situations. This study identified problems of local small and medium sized companies, implemented a process and performance management system using the Lean concept, and systemized a web-based system. Also, the study proposed operational strategies so that small and medium construction companies may access and use the system easily. This will ensure the competitiveness of local small and medium sized companies, will pursue visible outcomes such as construction period reduction and construction cost reduction, and will be utilized as data related to performance assessment both during construction progress and after construction.

  • PDF

Development and Evaluation of Fixation Equipment for Transporting Unit Modules

  • Park, Su-Yeul;Kim, Kyoon-Tai;Park, Nam-Cheon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.6
    • /
    • pp.609-618
    • /
    • 2013
  • The unit modular construction system is a building technique in which unit modules are manufactured at a factory and then assembled at the construction site. It has many benefits, including reduction of the construction period and improvement in quality. For this reason, it is utilized for various purposes in Japan and England. While it has been introduced in Korea, there have been few Korean studies conducted on the unit modular system. In particular, little research has been done on the method of safely fixating the unit modules to a truck. Therefore, this study reviewed the fixation methods of unit modules for transport, analyzed the problems, and designed a fixation device for unit modules. In addition, a device for the fixation of unit modules to a truck was developed, and a structural simulation was implemented for a safety test by considering the maximum stress generated during the transport of the unit modules fixed on a truck. When the device for the fixation of unit modules is manufactured based on the results of the structural simulation done in this study, it is expected to aid the development of a more practical fixation device for unit modules.

Economic Analysis of Economic Steel beam method. (ES 빔 공법의 경제성 분석)

  • Choi, Tae-Ho;Woo, Jong-Yeol;Hong, Seong-Wook;Seo, Yong-Chil;Shin, Chan-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.133-136
    • /
    • 2011
  • This study concerned with the steel beam of bonding method and bonded steel beams by this method and both ends of different height, steel beams and steel beams in the center makes the junction. Both ends and the central part of steel beams connecting the lower flange by additional combining steel plates to convey stress, the stress to focus on the beam connections are passed to both ends of steel beams, and strength of beam connections is improved and steel structural beams is proposed to minimize the loss by Incision. If you use the developed method, the construction period is shortened, and reducing the amount of material can decrease the cost and reduction in floor height can be maximized business feasibility.

  • PDF

High Strength Steel Pipe Strut Field Applicability Evaluation through case studies of Domestic Constuction Projects (국내 적용사례 분석을 통한 고강도 강관버팀보의 현장 적용성 평가)

  • La, Seung-Min
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.457-464
    • /
    • 2010
  • Ever since the introduction of high strength steel pipe strut(POSTRUT) in 2008, there has been over 50 applications domestically. The merits of construction period reduction and cost savings have been well reported abroad in countries such as America, Europe and China but ever in domestic projects or ground condidtions. 25 actual construction projects were investigated and statistically analyzed to evaluate the quantitative effects of POSTRUT. Also the construction projects along with the cautions that should be taken and the structural behavior differences between POSTRUT and H-section struts are briefly described in this paper.