Efficient Large Dataset Construction using Image Smoothing and Image Size Reduction

  • Jaemin HWANG;Sac LEE;Hyunwoo LEE;Seyun PARK;Jiyoung LIM
    • Korean Journal of Artificial Intelligence
    • /
    • v.11 no.1
    • /
    • pp.17-24
    • /
    • 2023
  • With the continuous growth in the amount of data collected and analyzed, deep learning has become increasingly popular for extracting meaningful insights from various fields. However, hardware limitations pose a challenge for achieving meaningful results with limited data. To address this challenge, this paper proposes an algorithm that leverages the characteristics of convolutional neural networks (CNNs) to reduce the size of image datasets by 20% through smoothing and shrinking the size of images using color elements. The proposed algorithm reduces the learning time and, as a result, the computational load on hardware. The experiments conducted in this study show that the proposed method achieves effective learning with similar or slightly higher accuracy than the original dataset while reducing computational and time costs. This color-centric dataset construction method using image smoothing techniques can lead to more efficient learning on CNNs. This method can be applied in various applications, such as image classification and recognition, and can contribute to more efficient and cost-effective deep learning. This paper presents a promising approach to reducing the computational load and time costs associated with deep learning and provides meaningful results with limited data, enabling them to apply deep learning to a broader range of applications.

Improvement of Bill of Quantities of Door and Window Work for BIM-based Cost Estimation (BIM 기반 견적을 위한 창호공사 내역 작성체계 개선 방안)

  • Kim, Mi-Hyeon;Jo, Chan-Won;Yun, Seok-Heon
    • Journal of KIBIM
    • /
    • v.10 no.2
    • /
    • pp.12-20
    • /
    • 2020
  • Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.

A Basic Study on the Development of Profit Risk Management Model for Apartment Projects (아파트 개발 프로젝트의 수익 리스크 관리모델에 관한 기초연구)

  • Son, Seunghyun;Lee, Sungho;Han, Bumjin;Na, Young-Ju;Kim, Ji-Myung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.215-216
    • /
    • 2022
  • Profit, the performance of an apartment development project, is directly affected by the sales ratio, unit sale price, financial costs, land costs and construction costs. However, these factors fluctuate in response to changes in the environment, including various stake holders, and the profits fluctuate as a result. In order to ensure that profits are managed within target levels, these factors must be able to be predicted, controlled and monitored and managed up to the start, sale, and end stages of the project. The purpose of this study is to develop a profit risk management model for apartment development projects. The results of this study will contribute to the establishment of academic basis for the dynamic management of project profits that fluctuate with time and environment. And in practice, it will help project developers manage their business revenue to the proper level. In addition, the risks that occur from time to time can be identified quantitatively and visually, and it is expected that it will be easier to derive consensus points for smooth business progress by reducing conflicts of interest among stakeholders.

  • PDF

Numerical study of a new constructive sequence for movable scaffolding system (MSS) application

  • Teran, Jose Ramon Diaz de;Haach, Vladimir Guilherme;Turmo, Jose;Jorquera, Juan Jose
    • Advances in concrete construction
    • /
    • v.4 no.3
    • /
    • pp.173-194
    • /
    • 2016
  • This paper consists in a study of a new contructive sequence of road viaducts with Movable Scaffolding System (MSS) using numerical tools based on finite element method (FEM). Traditional and new sequences are being used in Spain to build viaducts with MSS. The new sequence permits an easier construction of one span per week but implies some other issues related to the need of two prestressing stages per span. In order to improve the efficiency of the new sequence by reducing the number of prestressing stages per span, two solutions are suggested in this study. Results show that the best solution is to introduce the 100% of the prestressing force at the self-supporting core in order to improve the road viaduct construction with movable scaffolding system by reducing execution time without increasing economic costs.

MODEL-BASED LIFE CYCLE COST AND ASSESSMENT TOOL FOR SUSTAINABLE BUILDING DESIGN DECISION

  • Iris X. Han;W. Zhou;Llewellyn C.M. Tang
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.311-317
    • /
    • 2011
  • There is a growing concern in reducing greenhouse gas emissions all over the world. The U.K. has set 34% target reduction of emission before 2020 and 80% before 2050 compared to 1990 recently in Post Copenhagen Report on Climate Change. In practise, Life Cycle Cost (LCC) and Life Cycle Assessment (LCA) tools have been introduced to construction industry in order to achieve this such as. However, there is clear a disconnection between costs and environmental impacts over the life cycle of a built asset when using these two tools. Besides, the changes in Information and Communication Technologies (ICTs) lead to a change in the way information is represented, in particular, information is being fed more easily and distributed more quickly to different stakeholders by the use of tool such as the Building Information Modelling (BIM), with little consideration on incorporating LCC and LCA and their maximised usage within the BIM environment. The aim of this paper is to propose the development of a model-based LCC and LCA tool in order to provide sustainable building design decisions for clients, architects and quantity surveyors, by then an optimal investment decision can be made by studying the trade-off between costs and environmental impacts. An application framework is also proposed finally as the future work that shows how the proposed model can be incorporated into the BIM environment in practise.

  • PDF

Derivation of the Construction Process for Precast Concrete System based on Off-Site Construction (OSC(Off-Site Construction)기반 PC공법의 시공 프로세스 도출)

  • Jun, Young-Hun;Bae, Byung-Yun;Yun, Won-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.289-290
    • /
    • 2021
  • The PC system has advantages in terms of project management, such as shortening the construction period and reducing costs. However, it is difficult to activate the technology due to insufficient application of the technology. Therefore, there is a need for a strategy to expand and activate the PC system. This study is a basic research for PC construction project management, and its purpose is to derive the entire construction process from factory production of PC components to on-site construction. In this study, the construction process of the PC system was derived through literature review, and the main matters for the construction process management of PC system were confirmed in the analysis process. In the future, the results of this study are expected to be used as basic data for research for PC project management, such as deriving construction classification and calculating construction periods.

  • PDF

A study on the economical analysis of non-supporting form in basement wall cases (지하옹벽 무지주 거푸집 사례의 경제성 분석에 관한 연구)

  • Kim, Jae-Yeob;Kim, Gwang-Hee;Lee, Sang-Woo;Sohn, Young-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.4
    • /
    • pp.111-117
    • /
    • 2009
  • Considering the entire critical path, underground works in construction projects occupy a large part of the total construction period, as well as a large part of the construction costs. Particularly in the downtown area, the scale of underground work has been increasing every year. Currently, underground retaining walls, which are built at construction sites, require many skilled workers, and the works are being undertaken by means of the Euroform+Soldier system, which is quite disadvantageous in terms of the construction period. In order to complement this, forms made of new materials and new construction methods have been developed. Now more than eyer, the shortening of construction periods and the reduction of construction costs is required. Considering this, in this study, the researcher has tried to compare the Euroform+Soldier system, which has been the system most frequently used on construction sites, to the non-supporting form system, which has been used on the sites of civil engineering work. The results of the research revealed that although the Euroform+Soldier system was advantageous from the perspective of material costs, it was disadvantageous in terms of labor costs. It is thought that an additional study on a method for reducing the material costs is required, so as to revitalize the application of non-supporting forms to the construction site.

Energy Efficiency & Sustainability the Cleanliness Management Role of Components and System in Automotive and Hydraulics

  • Hong, J.H.;Day, Mike
    • Journal of Drive and Control
    • /
    • v.9 no.4
    • /
    • pp.19-25
    • /
    • 2012
  • This paper explains how eliminating contamination from the manufacturing processes will lead to better product quality and hence the need for reworking, a trouble free commissioning period and greatly improved production efficiency. All of these will reduce costs and energy usage. It will also ensure that the product is delivered to the customer in a condition that will ensure improved reliability and longer life, again reducing both energy and other operating costs. Correctly designing the contamination control measures will achieve and maintain the level of fluid cleanliness that is required by the end user. The filter is critical to cleanliness management and should be selected with the same degree of thought and consideration as for other major components. This paper explains the role that Cleanliness Management plays in the reducing the carbon footprint of systems and processes by making them perform more efficiently for longer periods. It also examines two differing ways of selecting filters to incorporate the features of newer designs, and shows how significant savings in the costs of ownership can be achieved using these approaches.

Construction Conflict Risk Factors based on the Conflict Cost (분쟁청구비용을 고려한 건설 분쟁의 위험요인)

  • Shin Han-Woo;Soe Jang-Woo;Cho Hun-Hee;Kang Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.125-128
    • /
    • 2006
  • Since the diversification, complication of the construction industry, construction conflicts have been increased these days. Expansion of scale of construction has brought conflict treatment cost increase. Thus, needs of the study on construction conflict risk factors and its management is getting important. But the existing studies about construction conflicts and risk factors that need to be cared to decrease construction cost are almost focused on analysis of number of conflict proposed. It means those studies can be helpful when want to know how many conflict have been instituted, however, they do not contain a close examination between types of conflict and cost of conflict treatment. The purpose of this study, therefore, is an extraction of conflict causes based on the conflict treatment cost and the choice of significant risk factors to be managed to prevent conflict and its treatment cost, which enables reducing the conflict treatment colt on control the risk factors.

  • PDF

TECHNICAL PROPOSAL BASED COST REDUCTION BIDDING SYSTEM FOR SUPPLYING AFFODABLE HOUSING

  • Seunghee Kang;Jeongseok Lee;Gunhee Cho;Jeongrak Sohn;Jongdae Bang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1433-1439
    • /
    • 2009
  • Best value is the ultimate goal of the owner and can thus have diverse meanings according to the project characteristic, owner's purpose, user groups' payment capability, etc.. Recently, resettlement problems of the marginalized members in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). It means that a minimized production cost for reducing supply price of housing is a key factor in establishing the best value of the marginalized members. The lowest-price bidding system serves the purpose of ensuring a minimized production cost, but due to the low-cost investments, it creates various problems, such as sloppy construction, lowered quality, an increased LCC, and worsening profitability for builders. Thus, to help them resettle, it is necessary to supply affordable housing geared towards a certain appropriate quality and minimum construction costs. Towards this end, this study aimed to propose a cost reduction bidding system based on a technical proposal. The proposed technical-proposal-based cost reduction bidding system consists of the following components: work-unit-based, project-unit-based, and construction-period-reducing technical proposals. These components are evaluated to select the best bidder for a given project. The technical proposal based cost reduction bidding system proposed herein is expected to provide facilities with appropriate supply prices and appropriate quality levels, to bolster the technological competitiveness of builders.