• Title/Summary/Keyword: Reduced Cost

Search Result 2,633, Processing Time 0.029 seconds

Studies on the Relining Method of Kenaf bark and Manufacture if bag using KENAF(Hibiscus Cannabinus. L) Produced in KOREA (한국산 양마 섬유의 정련방법과 마대가공에 관한 연구)

  • 이성갑
    • Journal of the Korean Professional Engineers Association
    • /
    • v.10 no.3
    • /
    • pp.17-26
    • /
    • 1977
  • In order to obtain the most practical and economically efficient method for refining of kenaf fiber and the production possibility of bag dproucts by using kenaf, Various chemicals and conditions of treatment for refining of kenaf bark were examined. Refining by the retting method was found much beneficial in quality of fiber and in processing cost than the chemical mettled. Bag products by using kenaf bark has good quality , and for practical use, Even if the production cost is slightly more expensive than jute bag, it could be reduced by planned mass production.

  • PDF

Option of Network Flow Problem Considering Uncertain Arc Capacity Constraints (불확실한 arc용량제약식들을 고려한 네트워크문제의 최적화)

  • 박주녕;송서일
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.13 no.21
    • /
    • pp.51-60
    • /
    • 1990
  • In this paper we deal with the miniaml cost network flow problem with uncertain arc capacity constraints. When the arc capacities are fuzzy with linear L-R type membership function, using parametric programming procedure, we reduced it to the deterministic minimal cost network flow problem which can be solved by various typical network flow algorithms. A modified Algorithm using the Out-of-kilter algorithm is developed.

  • PDF

A Study on the Economical Analysis of the Composite Precast Concrete Method (프리캐스트 콘크리트 복합화공법의 경제성 분석에 관한 연구)

  • Yoo, Dae-Ho;Lee, Han-Bok;Ahn, Jae-Cheol;Kang, Byeung-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.113-118
    • /
    • 2007
  • In this study, we select a site adopting real composite precast concrete method. Estimating real construction cost and imaginary cost appling reinforced concrete method in the site, we compare the costs. Through using high intensity concrete and prestressed concrete, amount of concrete is reduced more than 50% but there isn't big gap in material cost. In the main construction cost of composite precast concrete method, the material cost with production cost and transportation cost are in that, joints and topping concrete are account for 90%. But in case of reinforced concrete, labor cost spent at concrete steel bar and form is account for 30%. In the cost of attached, compared with composite precast concrete method, the reinforced concrete method taken in big portion by temporary work and scaffolding is twice as much as composite precast concrete method in construction cost. Therefore, economic efficiency is excellent reducing 11% total cost of composite precast concrete method from the reinforced concrete method.

  • PDF

A Study on the Cost Estimation in Case of Termination in the Building Construction Contract (건축공사 계약해지에 따른 비용산정에 관한 연구)

  • Lee, Ho-Il;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.2
    • /
    • pp.95-102
    • /
    • 2003
  • Financial difficulties and claims frequently stop construction works and cause subsequent contract cancellations. However, as the criteria to assess costs have not been established, many cases of legal disputes over the assessment of cancellation costs are taking place and the concerned parties are suffering the loss of time and money. Therefore, the present research aimed at developing a rational and systematic model of cancellation cost assessment following the cancellation of contracts. The research was carried out in the following methods and scopes. 1 ) The research was focused on the assessment of fair cancellation costs from constructors' side for contracts cancelled by any causes for which the owners have liability. 2) To obtain basic materials about cancellation cost assessment methods, contracts, claims, contract cancellations and construction-related laws at home and abroad were examined. 3) A cost assessment model was developed for systematization and efficient operation of cancellation cost assessment, and the reliability and efficiency of the proposed model was verified through a case study. The conclusions drawn from the research are as follows. The importance of the cancellation cost assessment model was confirmed as, using the cancellation cost assessment model, direct cancellation cost and indirect cancellation cost could be assessed systematically, the number of disputable items could be reduced because reasonable evidences of actual spending were presented, and the loss of constructors could be minimized because systematic and rational cost assessment became possible for many disputable cases of indirect cancellation cost, which the constructors had been unable to prove so far though having spent.

An Uncertainty Analysis of Calculating Life Cycle Maintenance and Energy Costs for Technical Proposals (기술제안입찰을 위한 유지관리 및 에너지 비용 산출방식의 불확실성 분석)

  • Chung, Sung Young;Kim, Sean Hay
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.3-9
    • /
    • 2018
  • Although Life Cycle Cost (LCC) must be evaluated by experts, sometimes it may not allow a sufficient time for even the experienced LCC expert to make rational decisions. Therefore, it often ends with relatively comparing the final numbers. We have broken down 110 technical proposals that are actually bade and accepted for large construction projects, and then have analyzed the uncertainty of Maintenance and Energy (M&E) cost during building life cycle, which turns out be the most volatile factor in uncertainty of LCC. Also we suggest "Value Engineering Index (VEI)" - the reduced M&E cost that is normalized by the reduced first cost. It is analyzed that the most uncertain factors of the M&E cost include repair and replacement term differing from each project, duplicated repair and replacement, non-standard repair items, and site-specific energy cost. Eventually we propose a VEI population with a mean of 1.38 and a standard deviation of 1.19, which is obtained by individually and exclusively applying the uncertain factors of the M&E cost to the 35 standard sample of technical proposals. The LCC evaluators may be able to use the VEI population as the benchmark to select the technical proposal with the most reasonable LCC among many others in two suggested manners; the one is to deterministically calculate the probability of single VEIs, and the other is to stochastically calculate the probability of the VEIs where uncertainty is quantified.

Analysis of importance by category for quantitative economic evaluation of multi-utility tunnel (공동구의 정량적 경제성 평가를 위한 항목별 중요도 분석)

  • Cho, Choong-yeun;Sim, Young-Jong;Kim, Hun-kyom;Lee, Pil-yoon;Lee, Min-jae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.1
    • /
    • pp.119-130
    • /
    • 2018
  • The VE/LCC study on the existing multi-utility tunnel examined the economical feasibility of the collective area through the cost-benefit analysis of the ten major routes of Seoul for the benefit (7 items) and the cost (5 items) through quantitative methods. In this paper, we analyzed the economic efficiency of 61 sectors by adding 3 items (reduced traffic accident, reduced vehicle noise, social-economic loss). The reduced traffic accident item is an improvement of the traffic accident cost that can be saved by the implementation of the project, and the reduced vehicle noise item is an indicator of the amount of noise change caused by the implement of the business. Finally, the social-economic loss items represent the impact on the local economy due to the construction of the multi-utility tunnel. The amounts of the additional items were compared and items added in the open type and tunnel type multi-utility tunnel were analyzed for each analysis. Result on the analysis, it analyzed the items applied to the basic and detail models in the economic evaluation of the multi-utility tunnel design, and makes it possible to evaluate the economic efficiency more efficiently. The economic evaluation of the basic and detailed models including the items presented in this study will be often used in the design of the multi-utility tunnel design.

Optimum Design of Prestressed Precast Gerber-U Beams (프리스트레스트 프리캐스트 게르버 U형보의 최적설계)

  • 김인규;박현석;이종민;조상규;유승룡
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.173-178
    • /
    • 2001
  • The cost on transmission and election of precast concrete members largely depends on the weight of them. In this study, the weight of prestressed precast beam could be reduced by control the section and prestressing force to meet the required strength on the basis of the optimum process. The top and bottom concrete stress of the section considered is required to check according to each construction step for this process. The original rectangular beam weight could be reduced up to 50~39% due to the development of a U-beams from the optimum process.

  • PDF

HIGH PRODUCTIVITY WELDING METHODS FOR AVESTAPOLARIT 2205 DUPLEX STAINLESS STEEL (EN 1.4462, UNS S31803 AND S32205)

  • Holmberg, B.;Laren, M.
    • Proceedings of the KWS Conference
    • /
    • 2002.10a
    • /
    • pp.43-48
    • /
    • 2002
  • $\textbullet$ The modern duplex steel 2205 can be a cost effective solution compared to standard austenitic stainless steels. $\textbullet$ 2205 offers a welded construction with very high corrosion resistance as well as high strength. $\textbullet$ The steel can be welded with high productivity welding procedures. $\textbullet$ Due to the possibility of reduced weld preparation and welding associated with reduced wall thickness, the total welding costs co be decreased further.

  • PDF

A model based scheme of on-line optimization in distillation process (모델을 이용한 증류공정의 최적화 방안)

  • 김흥식;이광순
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1990.10a
    • /
    • pp.240-245
    • /
    • 1990
  • A on-line optimization scheme based on model in a binary distillation process is proposed. A reduced-order model utilized the concept of collocation is used as a process model and the recursive prediction error method is employed to identify the reduced-order model. The concentrations of end products are controlled by nonlinear adaptive predictive control algorithm. The objective function is constructed to find optimum operate condition for saving utility cost. The proposed optimization is scheme is tested through simulation studies in 13-staged water-methanol distillation column.

  • PDF

V/f Control of the SPMSM with stabilizing loop using a reduced order observer (축소차수 관측기를 이용한 SPMSM의 V/f제어)

  • Park, Soon-Je;Kim, Young-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.962-963
    • /
    • 2015
  • This paper proposes a sensorless V/f control method of the interior mounted permanent magnet synchronous motor without damper winding. Arithmetic computation is simpler than vector control. And the lower cost price, dynamics and stability is guaranteed. When the loss of synchronization occurs with the load disturbances, the stability loop with a reduced order observer is applied quickly and accurately to improve the speed error.

  • PDF