• 제목/요약/키워드: Rebar manufacturing system

검색결과 8건 처리시간 0.019초

공동주택 철근공사의 실태조사에 관한 연구 (A Study on the Actual Condition Survey of Apartment Rebar Work)

  • 이택운
    • 한국건축시공학회지
    • /
    • 제8권2호
    • /
    • pp.71-79
    • /
    • 2008
  • The rebar work is very related to the safety and durability of the building. Recently, the rebar work is produced some serious problems due to the lack of skillful crafts-man and the rising cost of rebar materials. Many papers have dealt with the rebar work of the manufacturing system in plants with a view to improvement those problems. But, the research on the rebar work of the manufacturing system in field is in a insignificant condition. This study presents the following improvement schemes as a result. First, the education strengthening for evaluation on practical affairs, second, the reinforcement of drawing & management in shop drawing and finally the simplification of apartment rebar work in slab. Also, this paper aims at advancing apartment rebar work by the actual condition survey in slab work. The further research will be needed about the whole structure parts such as foundation, wall, girder and rebar truss-deck plate as one of the improvement methods.

건설공사 철근정보관리 개선방안에 관한 연구 (A Study on the Integrated Management System for Rebar Information in Building Construction)

  • 박우열
    • 한국건축시공학회지
    • /
    • 제5권4호
    • /
    • pp.99-106
    • /
    • 2005
  • With labor shortage and high-wage, the construction cost is rising and the construction-business is dull, demanding the construction environment of Korea to raise profitability through major cost savings and rationalization of construction management. Therefore, in this study, to improve many problems found in calculating rebar quantity for capital expenditure programming which is considered the beginning stage of rebar work. and to improve problems such as no grasping of rebar loss due to lack of systematic management in order/purchase stage and construction management stage, a rebar information-management-system was found and preyed. The relation database was designed for the rebar information management system by analyzing work process of a rebar manufacturing plant, as the rebar information that is necessary in a rebar manufacturing plant if similar to that of a purchasing department of general construction company. The Proposed rebar information management system was implemented in two large rebar production plants. The implementation of the proposed system showed that the system increased work efficiency, reduced the management manpower, and improved the project-integrated management

3차원 배근설계 및 배근시공도 작성 자동화 시스템 개발 (Development of 3-Dimensional Rebar Detail Design and Placing Drawing System)

  • 최현철;이윤재;이시은;김치경
    • 한국전산구조공학회논문집
    • /
    • 제27권4호
    • /
    • pp.289-296
    • /
    • 2014
  • 철근 공사에는 원청 건설사, 골조 전문건설사, 배근시공도 작성자, 철근 가공장, 감독/감리사, 구조설계자 등 다수의 업무 주체가 참여하고 있으나 이들간의 합리적인 협업이 이루어질 수 있는 업무 프로세스가 구축되어 있지 않아 비효율을 초래할 가능성이 높다. 특히 철근공사는 RC골조 품질에 결정적 영향을 주는 업무이지만 참여 주체간 원활한 협업 부재로 인하여 골조의 품질 저하, 생산성 감소, 공기 지연 등 많은 문제를 야기하고 있다. 그러므로 RC골조공사는 혁신이 매우 시급한 분야라 하겠다. 최근 BIM은 건설산업의 기술 환경 패러다임을 전환시키는 기술로 인식되고 확산되고 있다. 그런데 3차원 모델 상에서 방대한 양의 철근상세정보를 모델링하기 위해서는 많은 시간과 노력이 소요되고, 모델링 후에도 데이터량의 방대함으로 인하여 프로그램 성능이 원활하게 발현되지 않기에 BIM 기술의 확산에도 불구하고 배근 설계와 시공과 관련하여 BIM 기술이 활용되고 있지 않은 상황이다. 본 기술은 3차원 BIM 환경 하에서 골조상세정보 모델링과 배근상세설계, 정밀물량산출 및 공사관리까지를 지원하는 Rebar HUB를 개발하여 RC 골조 설계 및 공사 프로세스를 합리화할 수 있는 실용적 기술 개발을 목표로 하였다.

RC 건축물 철근 배근 상세도 및 가공도 작성 자동화 (Computer-Aided Drawing and Manufacturing of Rebars for RC Buildings)

  • 최동인;김치경
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2006년도 정기 학술대회 논문집
    • /
    • pp.508-513
    • /
    • 2006
  • In construction of RC buildings, the quality of shop and detail drawings is very essential for the quality and safety of buildings. Nevertheless, most of thess works are left to site workers and the requirements about bar detailing such as anchorage and splice have been done without rational design and engineering. The purpose of this research is to develop a computer-aided drawing system of rebars for RC buildings. The system is based on an integrated structural design system, that is SDP. SDP manages an engineering database for structural design information. It provides all the information needed to draw rebar drawings. The drawing system consists of three modules, 1) Structual Plan Drawing System, 2) Shop Drawing System, and 3) Detail Drawing System. It is expected that not only the productivity of detail drawing works but also the quality and safety of buildings will be improved using the rebar drawing system developed in this research.

  • PDF

철근공사의 공장가공 현황분석과 활성화 방안 (Analysis of re-bar manufacturing system in plant and its facilitate method)

  • 조훈희;강태경;박현용;윤석헌;허영기;박우열
    • 한국건설관리학회논문집
    • /
    • 제8권1호
    • /
    • pp.57-65
    • /
    • 2007
  • 철근 공장가공은 현장가공에 비하여 가공의 정밀도를 향상시킬 수 있을 뿐 아니라 철근의 절단 손실을 줄일 수 있는 장점이 있다. 최근 도심지 공사의 증가로 야적장이 부족하고 숙련된 현장 노무인력의 확보가 어려워짐에 따라 향후 철근의 공장가공 방식은 점차 확대될 것으로 예상된다. 본 연구에서는 철근가공 공장방식의 중요성을 인지하고 그간의 연구들이 배근작업과 전문건설업체를 중심으로 이루어졌다는 점에 착안하여 18개 철근가공 공장을 대상으로 실태조사를 실시하였다. 실태조사 결과를 토대로 철근공장가공 활성화를 위한 방안으로 철근가공 형상 표준화, 시공성이 반영된 배근상세도 작성 및 철근 가공형상표 산출 업무 전산화, 배근작업의 표준화와 ADC기반의 철근자재 추적시스템을 개발을 제안하였다.

BIM 기반 프리패브 부재의 용접철근매트 정보교환 시스템 (BIM based Data Exchange System of Welded Wire/bar Mat for Pre-fab RC Members)

  • 정재환;김도형;김현기
    • 한국BIM학회 논문집
    • /
    • 제11권1호
    • /
    • pp.21-30
    • /
    • 2021
  • Reinforcing bars, a major component of the pre-fab structure, adheres to the existing on-site assembly method and attempts to develop and commercialize the technology of the pre-assembly method, but the effect is insignificant. Welded Wire / Bar Mat (WBM) has various advantages such as commercialization of rebar through machine manufacturing to improve workability, but it is different from the existing design and the construction method is different from the previous one. Therefore, to maximize the advantages of WBM and improve productivity, manufacturing, transportation, and construction from the design stage should be considered based on BIM from the initial design stage. In this paper, the concept of the design support system for the WBM was established based on the use of BIM in concrete reinforcement and the preliminary research on the WBM. WBM conversion design was performed for the existing prefabricated members, and based on this, the exchange format and system of the master prefabricated model with the WBM design data were set up. As a result of the pilot test, it was found that the traditional reinforcing bar information extracted from the master prefab model has transmitted 100% accurately. As for the WBM information, 100% of the information on the straight reinforcement was transmitted and represented, and the information on the bent reinforcement was found to have a 90% recall in the master BIM tool.

시멘트 생산 시 발생하는 Chlorine Bypass System-dust의 물리 및 화학적 특성 (Physical and Chemical Properties of Chlorine Bypass System-Dust from Cement Manufacturing)

  • 한민철;이동주
    • 한국건설순환자원학회논문집
    • /
    • 제7권4호
    • /
    • pp.310-315
    • /
    • 2019
  • 본 연구는 시멘트 제조 시 발생하는 CBS-dust의 새로운 활용방법을 모색하고자 일련의 연구를 진행하는데, CBS-dust의 물리 및 화학적 특성 결과를 요약하면 다음과 같다. 먼저, 물리적 성질로 밀도는 2.40g/㎤으로 시멘트보다 가볍고, pH는 12.50으로 강알칼리성이며, 입도의 경우는 시멘트보다 미세한 11.70㎛로 나타났다. 화학적 특성으로는 산화칼슘(CaO) 성분이 35.10%로 가장 많은 량을 나타내고, 산화칼륨(K2O)이 32.43%, 염화칼륨(KCl)이 19.46% 삼산화황(SO3)이 6.81%이며, 그 이외의 화학성분으로 SiO2, Fe2O3, Al2O3, MgO, 기타 등이었다. 따라서, CBS-dust를 철근이 없는 혼화재를 다량 사용하는 콘크리트 2차 제품에 알칼리 활성화재로 사용한다면, 알칼리 자극제로 콘크리트의 강도증진 및 한중시공 시 초기동해 방지 등에 효과적인 활용법이 될 수 있을 것으로 사료된다.