• Title/Summary/Keyword: Real-Time Forecasting System

Search Result 202, Processing Time 0.025 seconds

Real-time Flood Stage Forecasting of Tributary Junctions in Namhan River (남한강 지류 합류부의 실시간 홍수위 예측)

  • Kim, Sang Ho;Hyun, Jin Sub;Kim, Ji-Sung;Jun, Kyung Soo
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.6
    • /
    • pp.561-572
    • /
    • 2014
  • The backwater effect at a tributary junction increases the risk of flood damage such as inundation and levee overflow. In particular, the rapid increase in water level may cause injury to persons. The purpose of this research is the development of the real-time flood forecasting technique as a part of the non-structural flood damage reduction measures. To this end, the factors causing a water level rising at a junction were examined, and the empirical formula for predicting flood level at a junction was developed using the calculated discharge and water level data from the well-constructed hydraulic model. The water level predictions show that average absolute error is about 0.2~0.3m with the maximum error of 1.0m and peak time can be captured prior to 0~5 hr. From the results of this study, the real-time flood forecasting system of a tributary junction can be easily constructed, and this system is expected to be utilized for reduction of flood inundation damage.

Runoff Simulation and Forecasting at Ungaged Station (미계측 지점에서의 유출 모의 및 예측)

  • Ahn, Sang-Jin;Choi, Byong-Man;Yeon, In-Sung;Kwark, Hyun-Gu
    • Journal of Korea Water Resources Association
    • /
    • v.38 no.6 s.155
    • /
    • pp.485-494
    • /
    • 2005
  • It is very important to analyze the correlation between discharge and water quality. The observation of discharge and water quality are effective at same point as well as same time for real time management. But no less significant is the fact that there are some of real time water quality monitoring stations far from the T/M water stage. Pyeongchanggang station is one of them. In this case, it need to observe accurate discharge data, and to develop forecasting program or system using real time data. In this paper, discharge on Pyeongchanggang station was calculated by developed runoff neural network model, and compared with discharge using WMS(Watershed Modeling System) model. WMS shows better results when peak discharge is small and hydrograph is smooth. Forecasted discharge of neural network model have achieved the highest overall accuracy of specific discharge and WMS. Neural network model forecast change of discharge well on unrecored station.

Development of the Automated Irrigation Management System for Paddy Fields (논 물 관리의 자동화시스템 개발)

  • 정하우;이남호;김성준;최진용;김대식
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.36 no.3
    • /
    • pp.67-73
    • /
    • 1994
  • This paper is to validate the proposed models for the real-time forecasting for the Keum river estuary dam such as tidal-level forecasting model, one-dimensional unsteady flood routing model, and Kalman filter models. The tidal-level forecasting model was based on semi-range and phase lag of four tidal constituents. The dynamic wave routing model was based on an implicit finite difference solution of the complete one-dimensional St. Venant equations of unsteady flow. The Kalman filter model was composed of a processing equation and adaptive filtering algorithm. The processng equations are second ordpr autoregressive model and autoregressive moving average model. Simulated results of the models were compared with field data and were reviewed.

  • PDF

Quantitative Flood Forecasting Using Remotely-Sensed Data and Neural Networks

  • Kim, Gwangseob
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2002.05a
    • /
    • pp.43-50
    • /
    • 2002
  • Accurate quantitative forecasting of rainfall for basins with a short response time is essential to predict streamflow and flash floods. Previously, neural networks were used to develop a Quantitative Precipitation Forecasting (QPF) model that highly improved forecasting skill at specific locations in Pennsylvania, using both Numerical Weather Prediction (NWP) output and rainfall and radiosonde data. The objective of this study was to improve an existing artificial neural network model and incorporate the evolving structure and frequency of intense weather systems in the mid-Atlantic region of the United States for improved flood forecasting. Besides using radiosonde and rainfall data, the model also used the satellite-derived characteristics of storm systems such as tropical cyclones, mesoscale convective complex systems and convective cloud clusters as input. The convective classification and tracking system (CCATS) was used to identify and quantify storm properties such as life time, area, eccentricity, and track. As in standard expert prediction systems, the fundamental structure of the neural network model was learned from the hydroclimatology of the relationships between weather system, rainfall production and streamflow response in the study area. The new Quantitative Flood Forecasting (QFF) model was applied to predict streamflow peaks with lead-times of 18 and 24 hours over a five year period in 4 watersheds on the leeward side of the Appalachian mountains in the mid-Atlantic region. Threat scores consistently above .6 and close to 0.8 ∼ 0.9 were obtained fur 18 hour lead-time forecasts, and skill scores of at least 4% and up to 6% were attained for the 24 hour lead-time forecasts. This work demonstrates that multisensor data cast into an expert information system such as neural networks, if built upon scientific understanding of regional hydrometeorology, can lead to significant gains in the forecast skill of extreme rainfall and associated floods. In particular, this study validates our hypothesis that accurate and extended flood forecast lead-times can be attained by taking into consideration the synoptic evolution of atmospheric conditions extracted from the analysis of large-area remotely sensed imagery While physically-based numerical weather prediction and river routing models cannot accurately depict complex natural non-linear processes, and thus have difficulty in simulating extreme events such as heavy rainfall and floods, data-driven approaches should be viewed as a strong alternative in operational hydrology. This is especially more pertinent at a time when the diversity of sensors in satellites and ground-based operational weather monitoring systems provide large volumes of data on a real-time basis.

  • PDF

Development of Real-Time Forecasting System of Marine Environmental Information for Ship Routing (항해지원을 위한 해양환경정보 실시간 예보시스템 개발)

  • Hong Keyyong;Shin Seung-Ho;Song Museok
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.8 no.1
    • /
    • pp.46-52
    • /
    • 2005
  • A marine environmental information system (MEIS) useful for optimal route planning of ships running in the ocean was developed. Utilizing the simulated marine environmental data produced by the European Center for Medium-Range Weather Forecasts based on global environmental data observed by satellites, the real-time forecast and long-term statistics of marine environments around planned and probable ship routes are provided. The MEIS consists of a land-based data acquisition and analysis system(MEIS-Center) and a onboard information display system(MEIS-Ship) for graphic description of marine information and optimal route planning of ships. Also, it uses of satellite communication system for data transfer. The marine environmental components of winds, waves, air pressures and storms are provided, in which winds are described by speed and direction and waves are expressed in terms of height, direction and period for both of wind waves and swells. The real-time information is characterized by 0.5° resolution, 10 day forecast in 6 hour interval and daily update. The statistic information of monthly average and maximum value expected for a return period is featured by 1.5° resolution and based on 15 year database. The MEIS-Ship include an editing tool for route simulation and the forecasting and statistic information on planned routes can be displayed in graph or table. The MEIS enables for navigators to design an optimal navigational route that minimizes probable risk and operational cost.

  • PDF

전자산업의 서비스부품에 대한 국제로지스틱스 연구

  • 김태현
    • Journal of Distribution Research
    • /
    • v.1 no.2
    • /
    • pp.141-172
    • /
    • 1996
  • This study is to investigate global logistics strategies of Korean electronics companies. in terms of service parts. According to the survey, Korean electronics companies were pursuing multi-level global logistics network such as global, continental, national, regional and service center echelon for improving the efficiency of service parts global logistics. Especially there was a tendency of developing new continental distribution centers. And the companies were exploiting efficiency through inventory control by multi-level echelon, demand forecasting by the product life cycle and supply and service lead time management. But there were some insufficient factors for the efficiency of global logistics operation at the construction of worldwide real time logistics information system and pursuit of the efficiency on the whole network including subcontractors. For the future competitive advantage of the Korean electronics companies, the following are suggested: 1) the establishment of arranged logistics channel adjusting each company's global strategy, 2) the construction of worldwide real time logistics information system, 3) the reengineering of all logistics procedures such as order processing, shipping, inventory control, etc., 4) the enhancement of the ratio of the supply from the external companies and the internal manufacturing subsidiaries at each continent, 5) and the pursuit of operational internalization of external subcontractors.

  • PDF

Development of Real Time Monitoring and Forecasting/Emergency System for Land Slide of Road

  • Kim, Choon-Sik;Yoon, Soo-Ho;Shin, Seung-Mok;Hur Chul;Kim, Sang-Bong
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.150.1-150
    • /
    • 2001
  • This paper introduces a real time inspecting and monitoring system by using wireless communication and image processing technique. The communication system is developed by using 80c196kc microprocessor and it has data acquisition function for several kinds of sensors such as pluviometer, temperature, tension meter, elinometer and so on. The image processing method adopts Lalacian of Gaussian operator and least square method to extract line features for the captured images and uses a relaxation matching algorithm based in global structure constraint satisfaction to distinguish the matching error for those features. When the algorithm is processed, motion parameters of displacement area and its direction are computed. Once movement is recognized ...

  • PDF

A Study of Short-Term Load Forecasting System Using Data Mining (데이터 마이닝을 이용한 단기 부하 예측 시스템 연구)

  • Joo, Young-Hoon;Jung, Keun-Ho;Kim, Do-Wan;Park, Jin-Bae
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.14 no.2
    • /
    • pp.130-135
    • /
    • 2004
  • This paper presents a new design methods of the short-term load forecasting system (STLFS) using the data mining. The structure of the proposed STLFS is divided into two parts: the Takagi-Sugeno (T-S) fuzzy model-based classifier and predictor The proposed classifier is composed of the Gaussian fuzzy sets in the premise part and the linearized Bayesian classifier in the consequent part. The related parameters of the classifier are easily obtained from the statistic information of the training set. The proposed predictor takes form of the convex combination of the linear time series predictors for each inputs. The problem of estimating the consequent parameters is formulated by the convex optimization problem, which is to minimize the norm distance between the real load and the output of the linear time series estimator. The problem of estimating the premise parameters is to find the parameter value minimizing the error between the real load and the overall output. Finally, to show the feasibility of the proposed method, this paper provides the short-term load forecasting example.

Real-Time Forecasting of Flood Discharges Upstream and Downstream of a Multipurpose Dam Using Grey Models (Grey 모형을 이용한 다목적댐의 유입 홍수량과 하류 하천 홍수량 실시간 예측)

  • Kang, Min-Goo;Cai, Ximing;Koh, Deuk-Koo
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.1
    • /
    • pp.61-73
    • /
    • 2009
  • To efficiently carry out the flood management of a multipurpose dam, two flood forecasting models are developed, each of which has the capabilities of forecasting upstream inflows and flood discharges downstream of a dam, respectively. The models are calibrated, validated, and evaluated by comparison of the observed and the runoff forecasts upstream and downstream of Namgang Dam. The upstream inflow forecasting model is based on the Grey system theory and employs the sixth order differential equation. By comparing the inflows forecasted by the models calibrated using different data sets with the observed in validation, the most appropriate model is determined. To forecast flood discharges downstream of a dam, a Grey model is integrated with a modified Muskingum flow routing model. A comparison of the observed and the forecasted values in validation reveals that the model can provide good forecasts for the dam's flood management. The applications of the two models to forecasting floods in real situations show that they provide reasonable results. In addition, it is revealed that to enhance the prediction accuracy, the models are necessary to be calibrated and applied considering runoff stages; the rising, peak, and falling stages.

Development of a neural-based model for forecating link travel times (신경망 이론에 의한 링크 통행시간 예측모형의 개발)

  • 박병규;노정현;정하욱
    • Journal of Korean Society of Transportation
    • /
    • v.13 no.1
    • /
    • pp.95-110
    • /
    • 1995
  • n this research neural -based model was developed to forecast link travel times , And it is also compared wiht other time series forecasting models such as Box-Jenkins model, Kalman filter model. These models are validated to evaluate the accuracy of models with real time series data gathered by the license plate method. Neural network's convergency and generalization were investigated by modifying learning rate, momentum term and the number of hidden layer units. Through this experiment, the optimum configuration of the nerual network architecture was determined. Optimumlearining rate, momentum term and the number of hidden layer units hsow 0.3, 0.5, 13 respectively. It may be applied to DRGS(dynamic route guidance system) with a minor modification. The methods are suggested at the condlusion of this paper, And there is no doubt that this neural -based model can be applied to many other itme series forecating problem such as populationforecasting vehicel volume forecasting et .

  • PDF