• Title/Summary/Keyword: Reactor head penetration

Search Result 20, Processing Time 0.035 seconds

A Feasibility Test for Flaw Detection in Overlay Weld of Reactor Upper Head Penetration Using Time of Flight Diffraction Technique (TOFD 기법을 활용한 원자로 상부헤드관통부 오버레이 용접부 결함 검출 가능성 평가)

  • Lee, Jeong Seok;Kim, Jin Hoi
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.10 no.1
    • /
    • pp.15-19
    • /
    • 2014
  • A Failure or degradation of reactor upper head penetration is a recurring problem due to long term operation at nuclear power plants. And a flaw in the reactor upper head penetration has caused unplanned plant shutdown for repair as well as high economic impact on the plants. Consequently, a detection of flaws is of the utmost importance. Prior to the replacement of reactor upper head penetration, some utilities have repaired the flaws of reactor upper head penetration generated by overlay weld. Until now, only the base metal in reactor upper head penetration has been inspected according to 10 CFR 50.55a and ASME code case N-729-1. Accordingly, it is difficult to detect manufacturing defects and repair defects in overlay weld. This paper presents a case study on the application of Time of Flight Diffraction technique for reactor head penetration mockup with artificial flaws in overlay weld. This study offers a way to understand the flaws detected in reactor upper head penetration overlay weld.

A Feasibility Study for Flaw Detection in J-groove Weld of Reactor Upper Head Penetration Using Time of Flight Diffraction UT Technique (TOFD UT 기법을 활용한 원자로 상부헤드관통부 J-groove 용접부 결함 검출 가능성 평가)

  • Lee, Jeong Seok;Lee, Tae Hun;Kim, Yong Sik
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.11 no.2
    • /
    • pp.1-5
    • /
    • 2015
  • A failure or degradation of reactor upper head penetration is a troublesome problem at Nuclear Power Plants. A flaw in the reactor upper head penetration can result in unplanned plant shutdown for repair, and cause serious economic losses on the plants. Consequently, a detection of flaws is a matter of more importance. Until now, only the base metal, not including J-groove weld, in reactor upper head penetration has been inspected in accordance with 10 CFR 50.55a and ASME code case N-729-1 requirements. Accordingly, it is rather difficult to detect manufacturing defects and repair defects in J-groove weld. This paper presents a case study on the application of Time of Flight Diffraction UT technique to examine the J-groove weld in reactor head penetration using reactor head penetration mockup with artificial flaws. We expect that this study result will offer a way to understand the non-destructive examination technology for J-groove weld in reactor upper head penetration.

Development of Reactor Vessel Head Penetration Performance Demonstration System in Korea (국내 원자로 상부헤드관통관 기량검증 기술개발)

  • Kim, Yongsik;Yoon, Byungsik;Yang, Seunghan
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.10 no.1
    • /
    • pp.44-50
    • /
    • 2014
  • There were many flaw issues of reactor vessel head penetration in USA fleets. USNRC issued 10CFR50.55a to implement reactor vessel head penetration ultrasonic examination performance demonstration(PD) in US for enhancement of inspection reliability. After September 2009, all US utilities inspected their RVHP with PD qualified system. Korea Hydro and Nuclear Power Company(KHNP) have developed reactor vessel head penetration performance demonstration system for ultrasonic test to apply for pressurized light-water reactor power plants in accordance with 10CFR50.55a since September 2011. RVHP configuration surveying and analysis, code requirement analysis, and performance demonstration specimen design were performed up to this day. Fingerprinting of manufactured specimen, development of test data management program, development of operation procedure, input of flawed data, and development of final report will be performed for the next step. This paper describes the development status of the performance demonstration system for reactor vessel head penetration ultrasonic examination in Korea.

Pre-Service Inspection for Reactor Vessel Penetration Nozzle (원자로 헤드 관통관 노즐 가동전 검사 수행)

  • Lee, Dong Jin;Noh, Ik Jun;Shin, Kun Chul;Kim, Hae Suck;Hong, Joo Youl;Choi, Jung Kwan
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.6 no.2
    • /
    • pp.9-15
    • /
    • 2010
  • US NRC issued rulemaking of 10CFR50.55a to perform the Perservice and Inservice inspection for Reactor Vessel Head Penetration Nozzle of US Nuclaer plant. The rulemaking was required the EPRI Demonstration to verify the NDE technique performing special Ultrasonic examination. In order to meet this requirement, the UT and ECT procedures was demonstrated and the NDE personnel were qualified by EPRI. In this paper, the NDE technique and analysis method are described the Preservice inspection for the Palo Verde #1/2/3 Replacement Reactor Vessel Head Penetration Nozzle using the qualified procedures and personnel.

  • PDF

Structural Integrity Evaluation of Reactor Pressure Vessel Bottom Head without Penetration Nozzles in Core Melting Accident (노심용융사고 시 관통노즐이 제거된 원자로용기 하부헤드의 구조 건전성 평가)

  • Lee, Yun Joo;Kim, Jong Min;Kim, Hyun Min;Lee, Dae Hee;Chung, Chang Kyu
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.27 no.3
    • /
    • pp.191-198
    • /
    • 2014
  • In this paper, structural integrity evaluation of reactor pressure vessel bottom head without penetration nozzles in core melting accident has been performed. Considering the analysis results of thermal load, weight of molten core debris and internal pressure, thermal load is the most significant factor in reactor vessel bottom head. The failure probability was evaluated according to the established failure criteria and the evaluation showed that the equivalent plastic strain results are lower than critical strain failure criteria. Thermal-structural coupled analyses show that the existence of elastic zone with a lower stress than yield strength is in the middle of bottom head thickness. As a result of analysis, the elastic zone became narrow and moved to the internal wall as the internal pressure increases, and it is evaluated that the structural integrity of reactor vessel is maintained under core melting accident.

Identification of nonregular indication according to change of grain size/surface geometry in nuclear power plant (NPP) reactor vessel (RV)-upper head alloy 690 penetration

  • Kim, Kyungcho;Kim, Changkuen;Kim, Hunhee;Kim, Hak-Joon;Kim, Jin-Gyum;Jhung, Myungjo
    • Nuclear Engineering and Technology
    • /
    • v.49 no.7
    • /
    • pp.1524-1536
    • /
    • 2017
  • During the fabrication process of reactor vessel head penetration (RVHP), the grain size of the tube material can be changed by hot or cold work and the inner side of the tube can also be shrunk due to welding outside of the tube. Several nonregular time-of-flight diffraction (TOFD) signals were found because of deformed grains. In this paper, an investigation of nonregular TOFD indications acquired from RVHP tubes using experiments and computer simulation was performed in order to identify and distinguish TOFD signals by coarse grains from those by Primary Water Stress Corrosion Crack (PWSCC). For proper understanding of the nonregular TOFD indications, microstructural analysis of the RVHP tubes and prediction of signals scattered from the grains using Finite Element Method (FEM) simulation were performed. Prediction of ultrasonic signals from the various sizes of side drilled holes to find equivalent flaws, determination of the size of the nonregular TOFD indications from the coarse grains, and experimental investigation of TOFD signals from coarse grain and shrinkage geometry to identify PWSCC signals were performed. From the computer simulation and experimental investigation results, it was possible to obtain the nonregular TOFD indications from the coarse grains in the alloy 690 penetration tube of RVHP; these nonregular indications may be classified as PWSCC. By comparing the computer simulation and experimental results, we were able to confirm a clear difference between the coarse grain signal and the PWSCC signal.

Reactor vessel head penetration J-groove welds inspection by TOFD technique (TOFD Technique을 이용한 원자로헤드 관통관 용접부 비파괴검사)

  • Kim, Wang-Bae;Lee, Yeong-Ho;Mun, Yong-Sik;Kim, Chang-Su
    • Proceedings of the KWS Conference
    • /
    • 2005.06a
    • /
    • pp.185-187
    • /
    • 2005
  • The reactor pressure vessel head of PWR has penetrations for control rod drive mechanism and instrumentation systems. The Primary coolant water and operating temperature can cause the stress-corrosion cracking of these nickel-based alloy penetrations. It is difficult to detect and size flaws such as SCC in the reactor head penetrations using conventional W methods because of complex geometry, Therefore, the utilities are using the TOFD technique for the detection and sizing of the flaw. This study shows the correlation between the ultrasonic wave direction and the orientation of the flaw and the range of flaw depth which can be detected by the TOFD techniques.

  • PDF

A Study I on the Sizing Accuracy of the Characterized Defects of the Reactor Vessel Head Penetrations (원자로헤드 관통관 결함의 검출 정확성 연구)

  • Chung Tae-hoon;Kim Han-Jong
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2005.05a
    • /
    • pp.216-227
    • /
    • 2005
  • The head penetrations for control rod drive mechanism and instrumentation systems are installed at the reactor pressure vessel head of PWRs. Primary coolant water and the operating conditions of PWR plants can cause cracking of these nickel-based alloy through a process called primary water stress corrosion cracking (PWSCC). Inspection of the head penetrations to ensure the integrity of the head penetrations has been interested since reactor coolant leakages were found at U. S. reactors in 2000 and 2001. The complex geometry of the head penetrations and the very low echo amplitude from the fine, multiple flaws due to the nature of the see made it difficult to detect and size the flaws using conventional pulse-echo UT methods. Time-of-flight-diffraction technique, which utilizes the time difference between the flaw tips while pulse-echo does the flaw response amplitude from the flaw, has been selected for this inspection for it's best performance of the detection and sizing of the head penetration see flaws. This study defines the limits of the detectable and accurately sizable minimum flaw size which can be detected by the General TOFD and the Delta TOFD techniques for circumferentially and axially oriented flaws respectively. These results assures the reliability of the inspection techniques to detect and accurately size for various kind of flaws, and will also be utilized for the future development and qualifications of the TOFD techniques to enhance the detecting sensitivity and sizing accuracy of the flaws of the reactor head penetrations in nuclear power plants.

  • PDF

Effect of Normal Operating Condition Analysis Method for Weld Residual Stress of CRDM Nozzle in Reactor Pressure Vessel (원전 정상가동조건 적용 방식이 원자로 압력용기 상부헤드 관통 노즐의 용접 잔류응력에 미치는 영향)

  • Nam, Hyun Suk;Bae, Hong Yeol;Oh, Chang Young;Kim, Ji Soo;Kim, Yun Jae
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.37 no.9
    • /
    • pp.1159-1168
    • /
    • 2013
  • In pressurized water nuclear reactors (PWRs), the reactor pressure vessel (RPV) upper head contains penetration nozzles that use a control rod drive mechanism (CRDM). The penetration nozzle uses J-groove weld geometry. Recently, the occurrence of cracking in alloy 600 CRDM penetration nozzle has increased. This is attributable to primary water stress corrosion cracking (PWSCC). PWSCC is known to be susceptible to the welding residual stress and operational stress. Generally, the tensile residual stress is the main factor contributing to crack growth. Therefore, this study investigates the effect on weld residual stress through different analysis methods for normal operating conditions using finite element analysis. In addition, this study also considers the effect of repeated normal operating condition cycles on the weld residual stress. Based on the analysis result, this paper presents a normal operating condition analysis method.