• 제목/요약/키워드: Reactor Vessel Head Penetration Nozzle

검색결과 9건 처리시간 0.02초

원자로 헤드 관통관 노즐 가동전 검사 수행 (Pre-Service Inspection for Reactor Vessel Penetration Nozzle)

  • 이동진;노익준;신건철;김해석;홍주열;최정권
    • 한국압력기기공학회 논문집
    • /
    • 제6권2호
    • /
    • pp.9-15
    • /
    • 2010
  • US NRC issued rulemaking of 10CFR50.55a to perform the Perservice and Inservice inspection for Reactor Vessel Head Penetration Nozzle of US Nuclaer plant. The rulemaking was required the EPRI Demonstration to verify the NDE technique performing special Ultrasonic examination. In order to meet this requirement, the UT and ECT procedures was demonstrated and the NDE personnel were qualified by EPRI. In this paper, the NDE technique and analysis method are described the Preservice inspection for the Palo Verde #1/2/3 Replacement Reactor Vessel Head Penetration Nozzle using the qualified procedures and personnel.

  • PDF

원자로 상부헤드 관통노즐 균열에 대한 원인분석 및 건전성 평가 (Root Cause Analysis and Structural Integrity Evaluation for a Crack in a Reactor Vessel Upper Head Penetration Nozzle)

  • 이경수;이성호;이정석;이재곤;이승건
    • 한국압력기기공학회 논문집
    • /
    • 제9권1호
    • /
    • pp.56-61
    • /
    • 2013
  • This paper presents the results of integrity assessment for the cracks happened in reactor vessel upper head penetration nozzles. The crack morphology for a boat sample from crack area was analyzed through microscope. The stress condition including weld residual stress around crack was analyzed using finite element analysis. From the results of crack morphology and stress condition, the crack was concluded as primary water stress corrosion cracking. The integrity of the cracked nozzle was assessed by the methodology provided in ASME Section XI. According to the assessment results, the remaining life of the cracked nozzle was 1.43 yrs. and the plant decided to repair it.

원전 정상가동조건 적용 방식이 원자로 압력용기 상부헤드 관통 노즐의 용접 잔류응력에 미치는 영향 (Effect of Normal Operating Condition Analysis Method for Weld Residual Stress of CRDM Nozzle in Reactor Pressure Vessel)

  • 남현석;배홍열;오창영;김지수;김윤재
    • 대한기계학회논문집A
    • /
    • 제37권9호
    • /
    • pp.1159-1168
    • /
    • 2013
  • 가압형 경수로 원자로의 압력용기 상부헤드 관통노즐 J-groove 용접부 주변에서 일차수응력부식균열(PWSCC)로 인한 냉각수 누설사례가 발생하고 있다. 본 연구에서는 PWSCC 의 주요 원인 중 하나인 용접 잔류응력을 유한요소 해석을 이용해 평가하고 원자력 발전소의 정상가동 조건을 해석에 반영하는 방법이 용접잔류응력 분포에 미치는 영향에 대한 분석을 수행하였다. 또한 반복되는 원자력 발전소의 가동 주기가 용접잔류응력 분포에 미치는 영향을 확인하여 정상가동조건에서의 정확한 용접 잔류응력을 예측할 수 있는 방법을 분석하였다.

유한요소법을 이용한 원자로 상부헤드 CRDM 관통노즐 J-Groove 보수용접 영향 분석 (Effects of Repair Weld of Reactor Pressure Vessel Upper Head Control Rod Drive Mechanism Penetration Nozzle on J-Groove Weldment Using Finite Element Analysis)

  • 김주희;유삼현;김윤재
    • 대한기계학회논문집A
    • /
    • 제38권6호
    • /
    • pp.637-647
    • /
    • 2014
  • 국내 가압경수로형 원자로의 압력용기 상부헤드에는 많은 제어봉구동장치(CRDM) 노즐이 분포한다. 이들 노즐은 억지끼워맞춤(Shrink fitting) 방식으로 결합되어 용접 처리 된다. 용접에 의해 발생되는 인장잔류응력은 일차수응력부식균열을 발생시키는 주요 요인이다. 이러한 이유로 최근 15 여 년 동안 관통노즐 용접부 부위에서 균열 발생 사례가 증가하고 있으며, 이를 극복하기 위해 다양한 방안이 모색되고 있다. 또한 용접과정에서 발생되는 불필요한 결함은 일차수응력부식균열(PWSCC)을 가속화 시키는 원인이 되기도 한다. 원자로 제작과정에서 용접에 의한 결함은 보수용접에 의해 즉시 수리가 이루어 진다. 기존의 연구에서는 정상적인 용접과정에서 발생되는 잔류응력을 예측하였으나, 본 연구에서는 용접과정에서 발생되는 결함을 보수하기 위해 실시되는 보수용접이 용접잔류응력에 미치는 영향을 분석하였다.

Corium melt researches at VESTA test facility

  • Kim, Hwan Yeol;An, Sang Mo;Jung, Jaehoon;Ha, Kwang Soon;Song, Jin Ho
    • Nuclear Engineering and Technology
    • /
    • 제49권7호
    • /
    • pp.1547-1554
    • /
    • 2017
  • VESTA (Verification of Ex-vessel corium STAbilization) and VESTA-S (-small) test facilities were constructed at the Korea Atomic Energy Research Institute in 2010 to perform various corium melt experiments. Since then, several tests have been performed for the verification of an ex-vessel core catcher design for the EU-APR1400. Ablation tests of an impinging $ZrO_2$ melt jet on a sacrificial material were performed to investigate the ablation characteristics. $ZrO_2$ melt in an amount of 65-70 kg was discharged onto a sacrificial material through a well-designed nozzle, after which the ablation depths were measured. Interaction tests between the metallic melt and sacrificial material were performed to investigate the interaction kinetics of the sacrificial material. Two types of melt were used: one is a metallic corium melt with Fe 46%, U 31%, Zr 16%, and Cr 7% (maximum possible content of U and Zr for C-40), and the other is a stainless steel (SUS304) melt. Metallic melt in an amount of 1.5-2.0 kg was delivered onto the sacrificial material, and the ablation depths were measured. Penetration tube failure tests were performed for an APR1400 equipped with 61 in-core instrumentation penetration nozzles and extended tubes at the reactor lower vessel. $ZrO_2$ melt was generated in a melting crucible and delivered down into an interaction crucible where the test specimen is installed. To evaluate the tube ejection mechanism, temperature distributions of the reactor bottom head and in-core instrumentation penetration were measured by a series of thermocouples embedded along the specimen. In addition, lower vessel failure tests for the Fukushima Daiichi nuclear power plant are being performed. As a first step, the configuration of the molten core in the plant was investigated by a melting and solidification experiment. Approximately 5 kg of a mixture, whose composition in terms of weight is $UO_2$ 60%, Zr 10%, $ZrO_2$ 15%, SUS304 14%, and $B_4C$ 1%, was melted in a cold crucible using an induction heating technique.

원자로 상부헤드 제어봉구동장치 관통노즐 형상이 J-Groove 용접잔류응력에 미치는 영향 (Effects of Geometry of Reactor Pressure Vessel Upper Head Control Rod Drive Mechanism Penetration Nozzles on J-Groove Weld Residual Stress)

  • 김주희;김윤재;이성호;허남용;배홍열;오창영;김지수;박흥배;이승건;김종성;허남수
    • 대한기계학회논문집A
    • /
    • 제35권10호
    • /
    • pp.1337-1345
    • /
    • 2011
  • 가압경수로형 원자로의 원자로압력용기 상부헤드에는 많은 제어봉구동장치(CRDM) 노즐이 분포한다. 최근 10 여 년 동안 제어봉구동장치 alloy 600 CRDM 노즐에서 균열 발생 사례가 증가하고 있으며, 이는 용접과 연관성이 매우 깊은 것으로 알려져 있다. CRDM 노즐에서 발생하는 축 및 원주방향 균열은 유럽과 미국의 원자력 발전소에서 발견되었으며, 사고의 원인은 용접 잔류응력 및 작용하중에 기인하는 일차수응력부식균열(PWSCC)임이 확인되었다. 이러한 이유로 본 연구에서는 유한요소해석을 통해 한국형 원자로의 CRDM 관통 노즐 용접부를 대상으로 용접 잔류응력을 예측하였으며, 특히, 관통노즐의 위치와 형상, 용접부 필렛 형상 및 인접노즐 용접에 의한 영향을 분석하였다.

원전 이종금속 맞대기용접부 PWSCC 균열건전성평가 (Evaluation of PWSCC at Dissimilar Metal Butt Welds in NPP)

  • 이성호;이경수;오창영
    • 대한기계학회논문집A
    • /
    • 제36권9호
    • /
    • pp.1047-1052
    • /
    • 2012
  • 가압경수로형 원전의 Alloy 600 원자로압력용기헤드 관통노즐 및 Alloy 82/182 이종금속 맞대기 용접부에서 일차수응력부식균열(PWSCC)이 보고된 이후 전 세계적으로 PWSCC에 의한 용접부 파단을 예방하기 위해 강화검사를 적용하고 있다. 본 이종금속용접부에 대한 가동중검사에서 균열이 발견된 경우 건전성평가 결과가 도출되기까지 발전소가 정지 상태에 있게 됨에 따라 원전 이용율 저하가 발생할 수 있는데, 이를 예방하기 위해서는 균열건전성평가 관련 기술의 정립뿐만 아니라 신속하게 평가 결과를 도출할 수 있는 시스템의 구축이 필요하다. 본 연구에서는 이종금속 맞대기 용접부를 대상으로 진행하고 있는 PWSCC 균열건전성평가 기준 정립 및 전산 시스템 개발 결과를 제시하였다. 본 연구를 통해 이종금속 맞대기 용접부 PWSCC 균열건전성평가 기술이 정립되고 전산 시스템으로 구현되어 원자로압력용기 주변 이종금속 맞대기 용접부에서의 PWSCC 균열에 대한 기술적 건전성평가 수단을 확보하였다.

원자로 CRDM 관통노즐 J-Groove 용접부 잔류응력 예측을 위한 유한요소 변수 민감도 해석 (Sensitivity Analysis of Finite Element Parameters for Estimating Residual Stress of J-Groove Weld in RPV CRDM Penetration Nozzle)

  • 배홍열;김주희;김윤재;오창영;김지수;이성호;이경수
    • 대한기계학회논문집A
    • /
    • 제36권10호
    • /
    • pp.1115-1130
    • /
    • 2012
  • 최근 원자로 압력용기 상부헤드 관통노즐 J-groove 용접부 주변에서 균열로 인한 냉각수 누출사고가 발행하고 있다. 이러한 사고의 원인은 용접에 의한 인장잔류응력, 농축된 붕산수 및 응력부식에 민감한 재료로 인한 일차수응력부식균열(PWSCC : primary water stress corrosion cracking)인 것으로 판명되었다. PWSCC 평가는 원자로 건전성 평가의 주요 관심사로서 용접에 의해 발생되는 잔류응력을 정확하게 예측함으로써 가능하다. 본 연구에서는 유한요소해석을 이용하여 국내 원자로의 일반적인 J-groove 용접부의 해석절차를 소개하고, 용접해석 관련 변수의 민감도 해석을 통해 잔류응력 예측기법을 제시하고자 한다. 이를 위해 2 차원 및 3 차원 요한요소해석 방법을 바탕으로 변수 민감도 해석을 수행하였으며, 기존 연구결과와 비교를 통해 해석절차 및 방법의 유용성을 검정하였다.