• 제목/요약/키워드: Reactive Scheduling

검색결과 16건 처리시간 0.031초

유전 알고리즘을 이용한 선각 가공 작업일정계획 시스템의 개발에 관한 연구 (Operation Scheduling System for Hull Block Fabrication in Shipbuilding using Genetic Algorithm)

  • 조규갑;김영구;류광렬;황준하;최형림
    • 산업공학
    • /
    • 제11권3호
    • /
    • pp.115-128
    • /
    • 1998
  • This paper presents a development of operation scheduling and reactive operation scheduling system for hull fabrication. The methodology for implementing operation scheduling system is HHGA(Hierarchical Hybrid Genetic Algorithm) which exploits both the global perspective of the genetic algorithm and the rapid convergence of the heuristic search for operation scheduling. The methodology for the reactive operation scheduling is the revised HHGA which consists of manual schedule editor for occurrence of exceptional events and the revised scheduling method used in operation scheduling. As the results of experiment, it has been confirmed that HHGA is able to search good operation scheduling within reasonable time, and the revised HHGA is able to search load-balanced reactive operation scheduling with minimum changes of initial operation schedule within short period of time.

  • PDF

장치이상을 고려한 동적 생산계획 최적화 모델 개발 (A Development of the Optimization Model for Reactive Scheduling Considering Equipment Failure)

  • 하진국;이의수
    • Korean Chemical Engineering Research
    • /
    • 제43권5호
    • /
    • pp.571-578
    • /
    • 2005
  • 불연속 화학공정은 소비자 수요에 탄력성 있게 대처할 수 있는 장점이 있는 반면에 그 특유의 동특성 때문에 복잡하고, 계획된 조업 시간과 실제 조업 시간 사이에서 외란(disruption) 또는 불확실 변수(uncertainty)에 의한 차이가 자주 발생하는 단점이 있다. 이에, 본 논문에서는 예측 생산계획(predictive scheduling)에 의해 결정된 생산계획에서 미래에 발생하는 공정 변수 값의 변화를 실시간으로 예측 생산계획을 수정, 제시하여 주는 생산 계획 시스템인 동적 생산계획(reactive scheduling) 기법을 개발하였다. 불확실 인자를 고려한 동적 생산계획에서, 본 논문에서는 장치 이상(equipment failure)이 발생하였을 때 공정 운전조건의 변화를 실시간으로 반영하여, 예측 생산계획(predictive scheduling) 모델에 의하여 제시된 전체 생산 계획을 최대한 유지하고 공정 변수의 변화를 실시간으로 반영하기 위하여 right shift rescheduling과 total regeneration 기법을 사용하였다. 또한, 불확실 인자의 발생 전후의 predictive scheduling과 reactive scheduling 간의 변화 정도를 측정하는 수단인 schedule stability 위하여, 본 논문에서는 수정된 sequence deviation과 percentage change in makespan을 사용하여 제안된 동적 생산계획의 안정성을 측정하였다. 본 논문에서 제안한 동적 생산계획 시스템은 기존에 제시되었던 경험 법칙에 의한 결과값에 비해 좋은 결과를 보여주었다.

Profit-based Thermal Unit Maintenance Scheduling under Price Volatility by Reactive Tabu Search

  • Sugimoto Junjiro;Yokoyama Ryuichi
    • KIEE International Transactions on Power Engineering
    • /
    • 제5A권4호
    • /
    • pp.331-338
    • /
    • 2005
  • In this paper, an improved maintenance scheduling approach suitable for the competitive environment is proposed by taking account of profits and costs of generation companies and the formulated combinatorial optimization problem is solved by using Reactive Tabu search (RTS). In competitive power markets, electricity prices are determined by the balance between demand and supply through electric power exchanges or by bilateral contracts. Therefore, in decision makings, it is essential for system operation planners and market participants to take the volatility of electricity price into consideration. In the proposed maintenance scheduling approach, firstly, electricity prices over the targeted period are forecasted based on Artificial Neural Network (ANN) and also a newly proposed aggregated bidding curve. Secondary, the maintenance scheduling is formulated as a combinatorial optimization problem with a novel objective function by which the most profitable maintenance schedule would be attained. As an objective function, Opportunity Loss by Maintenance (OLM) is adopted to maximize the profit of generation companies (GENCOS). Thirdly, the combinatorial optimization maintenance scheduling problem is solved by using Reactive Tabu Search in the light of the objective functions and forecasted electricity prices. Finally, the proposed maintenance scheduling is applied to a practical test power system to verify the advantages and practicability of the proposed method.

조선의 일정계획 수정 및 통제 : DAS-REACT (Reactive Scheduling and Control for Shipbuilding : DAS-REACT)

  • 이정승;이재규;최형림
    • 지능정보연구
    • /
    • 제2권1호
    • /
    • pp.59-73
    • /
    • 1996
  • 전체적인 조선 생산일정계획을 수립하기 위해서 계층적 구조를 채택하였다. 이 구조에 의하면 도크의 상위 일정계획 생성기는 탑재 일정계획을 생성하고, 조립공정의 하위 일정계획 생성기는 상위 일정계획 생성기가 요구하는 범위 내에서 각각 세부적인 조립 일정계획을 세우게 된다. 그런데 하위 일정계획 생성기가 아무리 노력하여도 상위 일정계획 생성기로부터의 제약조건을 만족시킬 수 없는 상황이 발생하면, 일정계획 수정기에 통보하여 초기 탑재 일정계획을 수정해야 한다. 하위 일정계획 생성기로부터의 조정요청을 반영하기 위해서 부분 수정을 통해 충격을 최소화시키는 일련의 휴리스틱으로 구성된 알고리즘을 제시하였다. 각각의 휴리스틱은 여유시간 제거, 버퍼 제거, 작업시간 축소, 다단계 여유시간 제거, 과부하 자원 공유블럭 조정, 자원 제약조건 완화 등이고, 흡수되지 않은 일부의 충격은 주변으로 전파된다. 이와같은 방법론을 대우조선의 상황에 적용하여, 조선일정계획 수정 시스템인 DAS-REACT를 개발하였다.

  • PDF

Optimal Voltage and Reactive Power Scheduling for Saving Electric Charges using Dynamic Programming with a Heuristic Search Approach

  • Jeong, Ki-Seok;Chung, Jong-Duk
    • Journal of Electrical Engineering and Technology
    • /
    • 제11권2호
    • /
    • pp.329-337
    • /
    • 2016
  • With the increasing deployment of distributed generators in the distribution system, a very large search space is required when dynamic programming (DP) is applied for the optimized dispatch schedules of voltage and reactive power controllers such as on-load tap changers, distributed generators, and shunt capacitors. This study proposes a new optimal voltage and reactive power scheduling method based on dynamic programming with a heuristic searching space reduction approach to reduce the computational burden. This algorithm is designed to determine optimum dispatch schedules based on power system day-ahead scheduling, with new control objectives that consider the reduction of active power losses and maintain the receiving power factor. In this work, to reduce the computational burden, an advanced voltage sensitivity index (AVSI) is adopted to reduce the number of load-flow calculations by estimating bus voltages. Moreover, the accumulated switching operation number up to the current stage is applied prior to the load-flow calculation module. The computational burden can be greatly reduced by using dynamic programming. Case studies were conducted using the IEEE 30-bus test systems and the simulation results indicate that the proposed method is more effective in terms of saving electric charges and improving the voltage profile than loss minimization.

공항의 계류장 관리 스케줄링 및 조정을 위한 전문가시스템 (Ramp Activity Expert System for Scheduling and Co-ordination)

  • 조근식;양종윤
    • 한국항행학회논문지
    • /
    • 제2권1호
    • /
    • pp.61-67
    • /
    • 1998
  • 이 연구에서는 항공기의 주기 문제를 해결하여 주는 스케줄링 시스템과 그 조정을 위한 전문가 시스템(RACES : Ramp Activity Co-ordination Expert System)을 설계 및 개발한 내용을 기술하고 있다. RACES는 공항에서 매일 발생하는 출발편 및 도착편 항공기를 브릿지(bridge)와 스팟(spot)에 배정하기 위해 인간 전문가(human expert)로부터 습득한 해당 분야의 지식(도메인 지식) 및 휴리스틱(heuristic)을 지식 베이스로 갖고 있다. 이 RACES는 브릿지/스팟과 항공기 간에 내적 관계, 예를 들어 승객 및 공항의 그라운드 핸들링(ground handling) 등과 같은 복잡하며 동적인 제약조건 들로부터 발생하는 복잡한 스케줄링 문제를 수반한다. 매일 발생하는 600편 정도의 항공기에 대한 주기장 관리 스케줄링이 인간 전문가에 의해 수행되어졌을 경우에는 약 4~5시간이 소요되는 반면 RACES에 의해 수행되어졌을 경우에는 약 20초 정도의 시간이 소요되었고 RACES로부터 얻어진 스케줄링 결과는 해당 분야의 전문가들로부터 인정되었다. RACES는 또한 예외적인 상황이 발생했을 경우에 스케줄의 부분적인 조정을 처리하도록 설계되었다. 하루의 스케줄링이 완료된 후 항공기의 변경 및 지연 메시지는 도메인 전문가의 지식을 바탕으로 스케줄링에 반영되어 스케줄이 조정되어야 한다. 동적 재스케줄링(reactive scheduling) 단계는 도메인 전문가의 지식 모델 분석을 통해 사용자 그래픽 인터페이스의 규칙과 시나리오로써 효과적으로 나타내어진다. 항공편의 변경 및 취소로 인해 발생되는 항공기 배치의 조정은 현재 스케줄에 반영되어져야 하기 때문에 이러한 항공기 배치의 조정은 동적 재스케줄링을 위해 메인 프레임으로부터 RACES에게 통보되어져야 하며 부분적인 재스케줄링을 처리하는 것에는 불규칙적인 요소들이 많기 때문에 RACES에 의해 스케줄의 조정이 반 자동적으로 수행된다.

  • PDF

선로사고 및 선로용량을 고려한 전력계통 최적운영에 관한 연구 (Study on the Calculation of the Optimal Power System Operation Considering Line Contingencies and Line Capacities)

  • 박영문;백영식;서보혁;신중린
    • 대한전기학회논문지
    • /
    • 제36권9호
    • /
    • pp.609-615
    • /
    • 1987
  • The optimal operation of power system is developed by alternately using real power dispatch and reactive power dispatch problem. The real power system scheduling process is formulated as an optimization problem with linear inequality constraints. A.C. loadflow method is used for the problem solution and line losses are considered. The constraints under consideration are generator power limits, load scehdling limits and line capacity limits. In solving the objective function the Dual Relaxation method is adopted. Tests indicate that the method is practical for real time application. The reactive power control problem uses the Dual Simplex Relaxation method as in the real scheduling case. Insted of minimizing the cost of power system, the objective is selected as to determine the highest possible voltage schedule. The constraints under consideration are the voltage limits at each node and the possibilities of supply or absobtion of reactive energy by generator units and the compensation facilities. Tests indicate that the method is practical for real time applications. The overall optimization methods developed in this paper proved to obtained fine results in minimizing object function compared with the method without using voltage control. And the overall voltage profiles were also improved.

  • PDF

Optimal Scheduling of Level 5 Electric Vehicle Chargers Based on Voltage Level

  • Sung-Kook Jeon;Dongho Lee
    • 한국산업융합학회 논문집
    • /
    • 제26권6_1호
    • /
    • pp.985-991
    • /
    • 2023
  • This study proposes a solution to the voltage drop in electric vehicle chargers, due to the parasitic resistance and inductance of power cables when the chargers are separated by large distances. A method using multi-level electric vehicle chargers that can output power in stages, without installing an additional energy supply source such as a reactive power compensator or an energy storage system, is proposed. The voltage drop over the power cables, to optimize the charging scheduling, is derived. The obtained voltage drop equation is used to formulate the constraints of the optimization process. To validate the effectiveness of the obtained results, an optimal charging scheduling is performed for each period in a case study based on the assumed charging demands of three connected chargers. From the calculations, the proposed method was found to generate an annual profit of $20,800 for a $12,500 increase in installation costs.

메타프로그래밍 제어를 통한 제약 중심의 코스 스케줄링에 관한 연구 (Constraint Directed Course Scheduling in Meta-Programming)

  • 정종진;조근식
    • 지능정보연구
    • /
    • 제1권1호
    • /
    • pp.111-122
    • /
    • 1995
  • 전통적으로 스케줄링 문제를 해결하기 위해 LP(Linear Programming) 기법이 주로 적용되어 왔으나, 스케줄링 문제의 많은 자원과 지식, 제약조건의 복잡한 상관 관계를 LPrl법으로 표현하고 처리하기가 쉽지 않다. 따라서 최근에는 AI 기법을 스케줄링 문제에 많이 적용하고 있고, AI 기법은 지식 표현 및 휴리스틱을 다루기에 효과적이므로 문제를 모델링하고 해결하는데 용이하다 할 수 있다. 본 논문에서는 AI 기법을 기반으로 하여 스케줄링에 적합한 휴리스틱 및, 탐색기법, 지식표현 방법등을 연구하고, 이를 바탕으로 코스 스케줄링 시스템을 구현하였다. 먼저 시스템은 전체적으로 메타프로그래밍을 통하여 초기 스케줄링(initial scheduling)과 동적스케줄링 (reactive scheduling)을 수행하도록 하였다. 메타프로그램이 초기 스케줄링을 수행할때에는 휴리스틱과 자체적인 도메인 여과기법을 적용하여 탐색 공간의 불일치 요소(inconsistency)를 제거시킴으로써 백트랙킹의 발생을 최소화시켰다. 또한 초기 스케줄링의 결과를 가지고 메타프로그래밍이 동적 재스케줄링을 수행할때에는 제약조건을 통한 휴리스틱을 이용하여 초기해에 대한 조정을 최소화할 수 있는 메카니즘을 제시하였다. 이에 대한 적용 결과는 실험을 통하여 기존의 논리 언어가 제공하는 탐색 알고리즘과 비교하고 분석하였다.

  • PDF