• 제목/요약/키워드: Re-bar Work

검색결과 22건 처리시간 0.029초

설치 위치 정보를 포함한 배근시공상세도 작성 및 가공철근 자동 물량산출 시스템 개발 (Developing an Automatic System for Making a Placing Drawing and Quantity taking-off Cut and Bent Re Bar with Work Zone Information)

  • 박현용;이승현;강태경;이유섭
    • 한국건축시공학회지
    • /
    • 제8권2호
    • /
    • pp.63-70
    • /
    • 2008
  • Reinforcing steel work plays an important role in terms of its structural performance or weight of construction cost for reinforced concrete structures. Precise estimation of re-bar quantity gives a basis for managing the reinforcing steel work effectively. However, the estimation process is still performed ineffectively based upon the expert's experience or manpower in spite of the advanced technology or improvement efforts. Therefore, the purpose of this research is to develop a prototype system for taking-off the quantity of reinforcing steel bars quickly and accurately in an order consistent with the specific members identified on the drawings. An estimate algorithm considering the connection, settlement and coating thickness of re-bars was suggested regarding to their replacement conditions which places more emphasis on constructibility. Also, this system produces the shop drawings automatically with the calculation results with work zone information.

초고층 건물 공기단축을 위한 기둥철근 3개층 선조립공법에 관한 연구 (A Study on the Pre-fabrication of Three-story Column Re-bars for Saving Construction Time of High-rise Buildings)

  • 김광희;김재엽;서덕석;안성훈;최희복;정병원
    • KIEAE Journal
    • /
    • 제7권2호
    • /
    • pp.39-46
    • /
    • 2007
  • A high-rise building construction in Korea has some problems in engineering, construction and management technologies although the high-rise building construction is recently booming. In addition, the lack of skilled construction labors is increasing, so the development for methods is needed to reduce the labors by prefabrication and mechanization. A re-bar work is one of very important works with regard to cost and schedule management in the high-rise building construction. Nevertheless, the re-bar work has some problems that it is needed many re-bars for joints linking and much time for lifting due to high-rise buildings, and it is difficult to level the skill of labors. So, in this study, the pre-fabrication of three-story height in column re-bars is proposed and the results of an implementation are analyzed and explored by a case study. As the results of case study, the pre-fabrication of three-story heights in column re-bars could reduce the cost in the re-bar work and accelerate the time in the structural frame work. In addition, the pre-fabrication of three-story height in column re-bars could solve the problems such as the waste of many re-bars for joints linking, and the lack of the skilled labors.

굽힌 후 편 철근의 기계적 성질과 응력-변형률 모델 (Mechanical Properties and Stress-Strain Model of Re-Bars Coldly Bent and Straightened)

  • 천성철;탁소영;하태훈
    • 콘크리트학회논문집
    • /
    • 제24권2호
    • /
    • pp.195-204
    • /
    • 2012
  • 신구 콘크리트 접합부에서는 굽힌 후 편 철근을 이용한 이음이 발생한다. 철근의 굽힘과 펴는 과정에는 필연적으로 소성 변형이 발생하며, 이 과정에서 가공 경화, 바우싱거 효과, 시효 경화 현상이 발생된다. 이 연구에서는 강종, 지름, 굽힘 내면 반지름, 굽힌 후 펴기까지의 존치기간을 변수로 굽힌 후 편 철근의 인장에 대한 기계적 성질을 조사하였다. 연구 결과, 굽힌 후 편 철근은 비례한계점이 낮아지는 비선형성이 직선 철근에 비해 일찍 발생되었으며, 항복마루 없이 바로 변형경화가 발생하였다. 이것은 굽힘 가공에서 압축을 받은 부분의 바우싱거 효과에 의해 항복점이 낮아졌고, 굽힘 가공에서 인장을 받은 부분의 가공 경화에 의해 항복마루가 없어졌기 때문이다. 높은 강종일수록 항복강도의 저하가 크게 발생되었으며, SD400 철근의 항복강도는 설계기준강도보다 낮았다. 철근은 표면부의 강도가 내부보다 높기 때문에, 높은 강종일수록 굽힌 후 펴면 바우싱거 효과가 크게 발생된다. 굽힌 후 펴기까지의 존치기간이 길면 시효 경화에 의해 항복강도의 상승과 연성의 저하가 발생되었다. Ramberg-Osgood 모델을 기본 형태로 실험 자료를 회귀분석하여 항복강도와 존치기간을 고려한 굽힌 후 편 철근의 응력-변형률 관계를 구성하였다. 이 모델은 굽힌 후 편 철근이 사용된 접합부의 강성 평가에 활용될 수 있다.

원전구조물의 확대머리 고강도철근 적용기술 개발 (The Technology Development for applying the High Strength Headed Deformed Bar to the Nuclear Power Plant Structures)

  • 이병수;방창준;이한우;임상준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.273-275
    • /
    • 2013
  • If the mechanical development is applied to the Nuclear Power Plant Structures instead of the standard hook development, the problem of overcrowding re-bars in the anchorage zone can be solved and the construction quality of the concrete work will be improved. But there are some problems in applying it to the NPP structures because of the restriction on the yield strength and diameter of the re-bar. After the performance evaluation test for the mechanical development, we can develop the new design equation of the mechanical development length in order to solve the limitation and apply it to NPP structures.

  • PDF

가공철근 물량산출 및 배근시공상세도 작성시스템 개발 (Developing An Automatic System for Quantity Taking-off Cut and Bent Re-Bar and Making a Placing Drawing)

  • 박현용;이승현;강태경;이유섭
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.358-363
    • /
    • 2007
  • 철근콘크리트 구조물 형태의 건설공사에 있어 철근공사는 구조적인 측면이나 공사비 비중으로 볼 때 매우 중요한 부분을 차지한다. 철근물량의 정확한 산출은 이러한 철근공사의 효과적인 관리를 위한 기본적인 업무로 볼 수 있으나, 기술의 발전이나 개선 노력에도 불구하고 여전히 철근 숙련공의 경험이나 인력에 의존하는 전 근대적인 방식에서 벗어나지 못하는 실정이다. 따라서 본 연구는 철근 물량을 부재별/배근별로 보다 신속하고 정확하게 산출하기 위한 전산프로그램의 개발을 목적으로 하며, 이를 위해 연결된 부재의 철근 배근 상태를 감안하여 이음길이와 정착 길이, 피복두께등을 고려한 물량산출 알고리즘을 개발하였다. 개발된 프로그램은 전문 인력의 판단이 아닌 논리적인 게산에 의해 신속하게 수량을 산출할 수 있으며, 설계 변경이 잦은 철근공사에 유연하게 대처할 수 있다는 장점을 지니며 물량산출 과정에서 나온 결과 값을 바탕으로 시공 상세도를 자동으로 작성하는 기능을 포함한다.

  • PDF

건설 현장 악력 작업안전 기준 설정에 관한 실험적 연구 (An Experimental Study on Establishing Criteria of Gripping Work in Construction Site)

  • 손기상;이인홍;최만진;안병준
    • 한국안전학회지
    • /
    • 제10권3호
    • /
    • pp.81-95
    • /
    • 1995
  • Now, safety assurance in construction sites should be accomplished by its own organization rather than control of the code or government. It is believed that the safety assurance can be considerably improved by a lecture or an education using the existing theories or literatures up to now, but it is thought that fundamental safety assurance we not able to be accomplished without developing safety devices '||'&'||' equipment or taking fundamental measures, based on the result analyzed from workers behaviors. There are various behaviors of the workers showed in construction site, but only tests for hammerusing works such as form, re-bar, stone workers directly related to the grip strength are mainly performed, investigated and measured here for the study. The above works are similar to power grip, 7th picture on seven items which are categorized for hand grip types(Ammermin 1956 ; Jones ; Kobrick 1958). Measurements of grip strength are commonly taken in anthropometric surveys. They are easy to administer but unfortunately it is rather dubious whether they yield any data that are of interest to the engineer. Very fewer controls of tools are grasped and squeesed studies showed very little overall correlation between grip strength and other measures of bodily strength (Laubach, Kromer, and Thordsen 1972), but hammer-using work which is practically progressed in construction site are mainly influenced with grip strength. According to the investigation on work measurement, it is shown that 77% of form worker are using hammer to be related to grip strength. In this study, it is particularly noticed that wearing safety gloves in construction site is required for workers safety but 20% difference between grip strength with safety gloves and without ones are commonly neglected in the site(Fig. 1). Nevertheless, safety operation with consideration of the above 20% difference is not considered in the construction site. Factors of age, kinds of work, working time, with or without safety gloves are in vestigated '||'&'||' collected at the sites for this study. Test, not at each working hour but at 14 : 00 when the almost all of the workers think the most tired, resulting from the questionaires, also when it is shown on the research report has been performed and compared for main kinds of works : form '||'&'||' re-bar work. Tests were performed with both left SE rightand of the workers simultaneously in construction site using Rand Dynamometer(Model 78010, Lafayette Instrument Co., Indiana, U.S.A) by reading grip strength on the gauge while they are pulling, and then by interviewing on their ages, works, experiences and etc., directly. The above tests have been performed for the dates of 15th march-26th May '95 with consideration of site condition. And even if various factors of ambient temperature on the testing date, working condition, individual worker's habit and worker's condition of the previous ate are concerned with the study. Those are considered as constants in this study. Samples are formwork 53, rebar 62, electrician 5, plumber 4, welding 1 from D construction Co., Ltd, ; formwork 12, re-bar 5, electrician 2, from S construction Co., Ltd, , formwork 78, re-bar 18, plumber 31, electrician 13, labor 48, plumber 31, plasterer 15, concrete placer 6, water proof worker 3, maisony 5 from B construction Co., Ltd. As In the previously mentioned, main aspect to be investigated in this study will be from '||'&'||' re-bar work because grip strength will be directly applied to these two kinds of works ; form '||'&'||' re-bar work, eventhough there are total 405 samples taken. It is thought that a frequency of accident occurrence will be mainly two work postures "looking up '||'&'||' looking down" to be mainly sorted, but this factor is not clarified in this study because It will be needed a lot of work more. Tests has been done at possible large scale of horizontally work-extended sites within one hour in order to prevent or decrease errors '||'&'||' discrepancies from time lag of the test. Additionally, the statistical package computer program SPSS PC+has been used for the study.

  • PDF

가치흐름 분석을 통한 건설프로세스의 낭비제거 방안 (Waste Elimination in Construction Process using Value Stream Analysis - Focused on Waste Elimination of Re-bar Works)

  • 문정문;김창덕;박동식
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.416-421
    • /
    • 2001
  • 국내 철근 콘크리트 공사는 철근현장가공조립을 주로 하고있는데 철근공사는 거푸집공사와 더불어 건축물의 구조적 안정성과 내구성 및 공기에 가장 큰 영향을 미치고 있는 공사이다. 이와 같은 철근현장가공조립의 프로세스를 린 생산원리를 적용하여 가치흐름분석을 하였다. 가치흐름분석은 가치분석과 가치흐름맵핑을 통해서 건설프로세스 상의 가치창출작업과 비 가치창출작업을 분석하였다 그 결과 비 가치창출 작업으로 인한 낭비로 많은 작업 단계와 인력, 장비, 자재, 시간 등이 낭비되고 있었다. 또한 밀어내기 생산(Push-driven Production)으로 과잉생산을 하는 등 생산의 낙후성이 조사되었다. 이러한 프로세스상의 문제점을 개선하기 위해 이 연구에서는 부가가치를 창출하는 가치창출 작업을 최대화하고, 비 가치창출작업을 최소화하여 낭비요소를 제거하는데 목적이 있다. 특히 진행간 재고를 최소화하여 흐름생산(Flow Production)과 당김생산(Pull-driven Production)이 될 수 있도록 하였다.

  • PDF

철근공사의 공장가공 현황분석과 활성화 방안 (Analysis of re-bar manufacturing system in plant and its facilitate method)

  • 조훈희;강태경;박현용;윤석헌;허영기;박우열
    • 한국건설관리학회논문집
    • /
    • 제8권1호
    • /
    • pp.57-65
    • /
    • 2007
  • 철근 공장가공은 현장가공에 비하여 가공의 정밀도를 향상시킬 수 있을 뿐 아니라 철근의 절단 손실을 줄일 수 있는 장점이 있다. 최근 도심지 공사의 증가로 야적장이 부족하고 숙련된 현장 노무인력의 확보가 어려워짐에 따라 향후 철근의 공장가공 방식은 점차 확대될 것으로 예상된다. 본 연구에서는 철근가공 공장방식의 중요성을 인지하고 그간의 연구들이 배근작업과 전문건설업체를 중심으로 이루어졌다는 점에 착안하여 18개 철근가공 공장을 대상으로 실태조사를 실시하였다. 실태조사 결과를 토대로 철근공장가공 활성화를 위한 방안으로 철근가공 형상 표준화, 시공성이 반영된 배근상세도 작성 및 철근 가공형상표 산출 업무 전산화, 배근작업의 표준화와 ADC기반의 철근자재 추적시스템을 개발을 제안하였다.

철근 선조립형 복합 데크플레이트의 하부근 선경축소에 따른 구조적 거동 평가 (A Study on Structural Behavior of Composite Deck Plate using a Pre-assembled Re-bar Truss)

  • 유병억
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제10권5호
    • /
    • pp.129-138
    • /
    • 2006
  • 철근 선조립형 복합 데크플레이트는 거푸집 작업을 없앨 수 있기 때문에 건설현장에서의 발전을 가져왔다. 복합데크 시스템의 해석에는 2D해석법과 3D해석법이 있다. 지금까지 2D해석법을 사용하였으나, 선경축소에 따른 비렌딜 거동을 보다 정확히 표현할 수 있는 3D 해석법의 사용이 요구되어진다. 본 연구에서는 하부근의 선경축소, 아연도 강판의 유무, 경간, 슬래브 두께 등을 변수로 8개의 실험체를 제작하여 거동을 파악하였고, 2D해석법 및 3D해석법을 사용하여 결과를 비교 분석하였다. 2D해석법은 D10의 하부근을 사용하는 경우에만 적용하는 것이 타당하고, 비렌딜 거동을 포함한 상세한 거동을 표현하기 위해서는 3D해석법을 사용하는 것이 타당하다.

고강도철근 기계적정착의 원전구조물 적용을 위한 성능평가실험 (Performance Evaluation Test for Applying the Mechanical Development of the High-Strength Reinforcing Bars to the Nuclear Power Plant Structures)

  • 이병수;방창준;임상준;김석철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.197-198
    • /
    • 2012
  • If the mechanical development be applied to the Nuclear Power Plant Structures instead of the standard hook development, the problem of overcrowding re-bars in the anchorage zone can be solved and the construction quality of the concrete work will be improved. But there are some problems in applying it to the NPP structures because of the restriction on the re-bar yield strength and diameter. After the performance evaluation test for the mechanical development, we can develop the new design equation of the mechanical development length in order to solve the limitation and apply it to NPP structures.

  • PDF