• 제목/요약/키워드: Ramp Section

검색결과 57건 처리시간 0.023초

1D AND 3D ANALYSES OF THE ZY2 SCIP BWR RAMP TESTS WITH THE FUEL CODES METEOR AND ALCYONE

  • Sercombe, J.;Agard, M.;Struzik, C.;Michel, B.;Thouvenin, G.;Poussard, C.;Kallstrom, K.R.
    • Nuclear Engineering and Technology
    • /
    • 제41권2호
    • /
    • pp.187-198
    • /
    • 2009
  • In this paper, three power ramp tests performed on high burn-up Re-crystallized Zircaloy2 - UO2 BWR fuel rods (56 to 63 MWd/kgU) within the SCIP project are simulated with METEOR and ALCYONE 3D. Two of the ramp tests are of staircase type up to Linear Heat Rates of 420 and 520 W/cm and with long holding periods. Failure of the 420 W/cm fuel rod was observed after 40 minutes. The third ramp test consisted of a more standard ramp test with a constant power rate of 80 W/cm/min up to 410 W/cm with a short holding time. The tests were first simulated with the METEOR 1D fuel rod code, which gave accurate results in terms of profilometry and fission gas releases. The behaviour of a fuel pellet fragment and of the cladding piece on top of it was then investigated with ALCYONE 3D. The size and the main characteristics of the ridges after base irradiation and power ramp testing were recovered. Finally, the failure criteria validated for PWR conditions and fuel rods with low-to-medium burn-ups were used to analyze the failure probability of the KKL rodlets during ramp testing.

고속도로 연속 유입연결로 접속단간의 이격거리 설계기준에 관한 연구 (Design Guideline for Successive Entrance Ramp Spacing)

  • 장재남;장명순
    • 대한교통학회지
    • /
    • 제14권3호
    • /
    • pp.155-172
    • /
    • 1996
  • This study is to analyze speed variation at merging section of successive entrance ramp and to suggest design criterion of ramp spacing at successive entrance ramp in urban area. The major findings are as follows ; (1) The relationship between the speed at merging section of successive entrance ramp and the distance from the merging point represents concave curve. (2) The 85 percentile speed(S) at outside lane (lane 1) is modeled S = 49.5 + 355.7(D/Q) - 0.94(D2/Q) + 6.78(D/AL2) where, D = Distance from merging point(m), Q = Lane 1 volume(vph) AL2 = Acceleration length at second entrance ramp(m) (3) The more traffic volume and the shorter acceleration length of the second entrance ramp, longer ramp terminal spacing is needed.

  • PDF

시뮬레이션을 이용한 고속도로 진출입로에서 차량속도와 곡선반경에 따른 상용차량 전복 연구 (A Simulation Study of Commercial Vehicle Rollover in Highway Ramp Section According to Vehicle Speed and Curvature)

  • 박중영;이홍국;장경진;서이정;유송민
    • 자동차안전학회지
    • /
    • 제7권2호
    • /
    • pp.50-54
    • /
    • 2015
  • Rollover accidents are a common occurrence on the highway ramp section. At highway ramp section, unexpected situations might occur due to demand on complex steering control unlike routine driving maneuver in the main streamline. Commercial vehicles have higher risk of rollover due to their high center of gravity. In this study, the lateral acceleration causing rollover would be found. In addition, sections would be classified as dangerous and safe ones by confirming the maximum lateral acceleration for various speed and curvature.

상용 ESC 평가 시뮬레이션을 위한 국내 고속도로 진출입로 연구 (A Study on the Highway Ramp Section for Simulation of Commercial Vehicle ESC Assesment)

  • 이홍국;박중영;장경진;서이정;유송민
    • 자동차안전학회지
    • /
    • 제6권2호
    • /
    • pp.23-28
    • /
    • 2014
  • Commercial vehicle ESC assessment for curvature road was conducted. The previous study of ESC activation condition for losing controllability utilizing the test protocols of double lane change and sine with dwell method was conducted without considering the geometric complexity of roadway design. Since critical rollover accidents were frequently observed in the exit ramp zone, variety of curve, slope and bank have been added for analysis conditions. Detailed feature of the ramp including location, dimension and design characteristics have been analyzed from the typical trumpet type ramp design. Analyzing accident data from 2008, two specific ramps have been selected due to their complexity in design and severity in steering operation.

첨단교통체계(ITS)에 의한 도시고속도록의 Ramp Metering 시스템 구축에 관한 연구 (The Ramp Metering System Construction of Urban Freeway by the Intelligent Transportation System (ITS) Technology)

  • 김태곤
    • 한국항만학회지
    • /
    • 제13권2호
    • /
    • pp.333-350
    • /
    • 1999
  • Today freeway is thought to be a very important transportation facility carrying tremendous traffic flow as the main corridor within the area of between the areas. However freeway is experiencing severe congestion and accidents by increased entrance ramp flow especially at peak time period. Ramp meters on the freeway entrance ramps that supply traffic to the freeway in a measured or appropriately regulated amount are needed for alleviating freeway congestion. Because ramp meters can be operated to discharge traffic at a measured or regulated rate thus maintaining more uniform speed on the mainline section maximizing the throughput to the freeway within the capacity of a downstream bottleneck and reducing the congestion related accidents. Thus the objectives in this study were to analyze the traffic characteristics on the freeway I-94 with ramp metering system before/after ITS technology in Detroit (Michigan) area compare shifts of the traffic characteristics on the freeway I-94 before/after ITS technology and finally suggest a better ramp metering strategy for the freeway system The following results were obtained: i)Flow occupancies and speeds on the mainline merge section of freeway were shown to be a big difference depending on the peak periods areas and directions based on the distribution of traffic flow characteristics on the freeway. ii)Reduced speed was shown to be more than 5 mph and ramp flow was also shown to be more than 240 vph at peak periods if there was the ramp metering system constructed on the freeway. iii)Ramp metering system was shown to be optimally operated on the freeway if ramp flow could be maximized within the range of over 900 vph and reduced occupancy could be also maximized by no more than 2 percent at peak periods. iv)The average flows on the freeway after the ITS technology were shown to be a decrease of over 20% depending on the peak periods areas and directions when compared with those flow on the freeway before the ITS technology. over 20% depending on the peak periods areas and directions when compared with those speeds on the freeway before the ITS technology. vi)The average metering rates on the freeway after the ITS technology were shown to be an increase of over 10% depending on the peak periods areas and directions when compared with those metering rates on the freeway before the ITS technology.

  • PDF

균일 및 난류 입구조건이 램프 후류 형상 및 성장에 미치는 영향 (Effects of Uniform and Turbulent Inflow Conditions on Wake Topology and Vortex Growth Behind a Ramp)

  • 구티 로키시 카리안;요시프 무스타파;임희창
    • 한국가시화정보학회지
    • /
    • 제21권2호
    • /
    • pp.24-33
    • /
    • 2023
  • This work is to observe the wake flow generated behind a ramp. We have conducted a large eddy simulation with two ramp models having different heights with two different inflow conditions. Reynolds number based on the height of the large ramp (LR) and small ramp (SR) are Reh = 2.8×104 and 1.4×104 respectively. The wake flow visualization shows the formation of streamwise counter-rotating vortices pairs at the downstream of the obstacle. These primary vortices are stretched and lifted up when moving downstream. In order to observe the effect of the inflow condition on the wake transition, two different inlet flow conditions are given on the inlet section as an inlet boundary condition. Induced counter-rotating vortices pairs due to sharp-edged triangular ramp obstacles are developed and propagated downstream. In the result, the large ramp shows a more complicated wake structure of the boundary layer than the small ramp.

고속도로 연결로 분석기법에 대한 평가 (Evaluation of Analysis Methodologies for Freeway Ramp Areas)

  • 이정수;윤치환;김은연
    • 대한교통학회지
    • /
    • 제10권1호
    • /
    • pp.5-20
    • /
    • 1992
  • Even though the types of ramp facilities in Korea are not various like other countries operations in these sections are very important because ramp merging and /or diverging flow affects freeway overall sections. In this study existing methodologies especially the gap acceptance model and the regression model in USHCM are evaluated with our field data. By gap acceptance model the merging capacity is founded 2.360 pcph which is increased by 7% than the capacity of freeway basic section. And in comparison of actual lane 1 volume to the estimation volume by HCM model the model slightly overestimates the actual volue.

  • PDF

고속도로 진출입램프 접속부상의 지체예측모형 구축에 관한 연구 (Construction of Delay Predictive Models on Freeway Ramp Junctions)

  • 김정훈;김태곤
    • 한국항만학회지
    • /
    • 제14권2호
    • /
    • pp.175-185
    • /
    • 2000
  • Today freeway is experiencing a severe congestion with incoming or outgoing traffic through freeway ramps during the peak periods. Thus, the purpose of this study is to identify the traffic characteristics, analyze the relationships between the traffic characteristics and finally construct the delay predictive models on the rap junctions of freeway with 70mph speed limit. From the traffic analyses, and model construction and verification for delay prediction on the ramp junctions of freeway, the following results were obtained : ⅰ) Traffic flow showed a big difference depending on the time periods. Especially, more traffic flows were concentrated on the freeway junctions in the morning peak period. ⅱ) The occupancy also showed a big difference depending on the time periods, and the downstream occupancy(Od) was especially shown to have a higher explanatory power for the delay predictive model construction on the ramp junctions of freeway. ⅲ) The delay-occupancy curve showed a remarkable shift based on the occupancies observed : O$\_$d/〈9% and O$\_$d/$\geq$9%. Especially, volume and occupancy were shown to be highly explanatory for delay prediction on the ramp junctions of freeway under O$\_$d/$\geq$9%, but lowly for delay prediction on the ramp junctions of freeway under O$\_$d/〈9%. Rather, the driver characteristics or transportation conditions around the freeway were thought to be a little higher explanatory for the delay prediction under O$\_$d/〈9%. ⅳ) Integrated delay predictive models showed a higher explanatory power in the morning peak period, but a lower explanatory power in the non-peak periods.

  • PDF

교통시뮬레이션 모형을 이용한 램프미터링 정지선 설정에 따른 효과분석 (The Effectiveness Analysis on Set of Ramp Metering STOP-line Using Traffic Simulation Model)

  • 김인수;양충헌
    • 한국도로학회논문집
    • /
    • 제16권1호
    • /
    • pp.111-118
    • /
    • 2014
  • PURPOSES : This study performs fundamental research on ramp-metering design criteria. METHODS : We carefully review previous studies in terms of ramp-metering design criteria and then consider applicability in Korea. For this, traffic simulation model is employed to analyze actual effect according to specific location of stop-line when implementing ramp-metering. RESULTS : When a stop-line moving forward with a 50m interval, travel speed at mainline relative to current stop-line location tends to decrease. However, traveling speed at approach roads increase about 5~18% under the same condition. When a stop-line location moving backward with a 50m interval, mainline travel speed increase approximately 17~32% whereas traveling speed at approach roads decrease. All cases are compared with the current stop-line location. CONCLUSIONS : We believe that both cases are useful with respect to freeway management. For example, moving forward a stop-line case can be used management for queuing area at ramp section and approach roads. Moving backward a stop-line case can be used for traffic control, focusing on mainline of freeways.

평판형 전조압연의 성형특성 연구 (A Study on Forming Characteristics in Plate Type Cross Rolling Process)

  • 윤덕재;이근안;이낙규;최석우;이형욱
    • 한국소성가공학회:학술대회논문집
    • /
    • 한국소성가공학회 2005년도 춘계학술대회 논문집
    • /
    • pp.329-332
    • /
    • 2005
  • Cross rolling process is one of incremental forming processes to form an axi-symmetric shaped metal component. It can be classified into two types according to the shape of dies, which are a drum type (roll type) and a plate type (straight type). It can also be classified into a wedge type and a ramp type processes according to deformation characteristics of a material. The ramp type die is applied to plate type cross rolling process in cold forming process for forming of teeth of gear or bolt, while the wedge type die is generally utilized to drum type and plate type cross rolling processes in hot forming process. A shape of the ramp type die is usually same as final shape of a product at every section of a progressing direction, while the shape of the wedge type die has different shapes in a progressing direction. In this paper, a rolling of neck part in a ball stud component has been carried out using the plate type cross rolling process with a ramp shaped die. Forming characteristics have been performed using finite element analysis in order to obtain a proper preform for the ramp type plate cross rolling process.

  • PDF