• Title/Summary/Keyword: Rainfall Peak flow

Search Result 189, Processing Time 0.022 seconds

Characteristics of the Rainfall-Runoff and Groundwater Level Change at Milbot Bog located in Mt.Cheonseong (천성산 밀밭늪의 강우 유출 및 지하수위 변동 특성)

  • Jung, Yu-Gyeong;Lee, Sang-Won;Lee, Heon-Ho
    • Journal of Korean Society of Forest Science
    • /
    • v.99 no.4
    • /
    • pp.559-567
    • /
    • 2010
  • This study was conducted to investigate the hydrological characteristics of groundwater level change and rainfall hydrological runoff processes caused by tunnel construction at Milbot bog located in Mt. Cheonseong. Data were collected from July 2004 to May 2008. The results were summarized as follows: The occurrence time of the direct runoff caused by unit rainfall at the Milbot bog were tended to be slower than those at general mountainous basin. Also, runoff did not sensitively respond to amount of rainfall at the most of the long and short term hydrograph. The annual runoff rates from 2004 to 2008 were 0.26, 0.13, 0.16, 0.25 and 0.27, respectively, slightly increased after 2005 regardless of the tunnel construction. Thus, the function of Milbot bog will be weakened, and it supposed to be changed to land in the future because of increasing annual runoff. The annual runoff rate for 4 years was 0.19, which is greatly lower than that of general mountainous basin. The recession coefficient of the direct runoff in short term hydrograph was ranged to 0.89~0.97, which is much larger than that of the general mountainous basin, 0.2~0.8. The recession coefficient of base flow ranged from 0.93 to 0.99, which are similar to general mountainous watershed's values. Groundwater level of Milbot bog increased or decreased in proportion to rainfall intensity, and in the descending time after the groundwater level was reached at peak point, it tends to be decreased very slowly. Also, groundwater level increased or decreased maintaining relatively high value after precedent rainfall. Groundwater level was highest during summer with heavy rainfall, but was lowest during winter. Average groundwater levels decreased annually from 2004 to 2008, -8.48 cm, -14.60 cm, -20.46 cm, -20.11 cm, -28.59 cm, respectively. Therefore, it seems that the Milbot bog is becoming dry and losing its function as a bog.

Development of Realtime Dam's Hydrologic Variables Prediction Model using Observed Data Assimilation and Reservoir Operation Techniques (관측자료 동화기법과 댐운영을 고려한 실시간 댐 수문량 예측모형 개발)

  • Lee, Byong Ju;Jung, Il-Won;Jung, Hyun-Sook;Bae, Deg Hyo
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.7
    • /
    • pp.755-765
    • /
    • 2013
  • This study developed a real-time dam's hydrologic variables prediction model (DHVPM) and evaluated its performance for simulating historical dam inflow and outflow in the Chungju dam basin. The DHVPM consists of the Sejong University River Forecast (SURF) model for hydrologic modeling and an autoreservoir operation method (Auto ROM) for dam operation. SURF model is continuous rainfall-runoff model with data assimilation using an ensemble Kalman filter technique. The four extreme events including the maximum inflow of each year for 2006~2009 were selected to examine the performance of DHVPM. The statistical criteria, the relative error in peak flow, root mean square error, and model efficiency, demonstrated that DHVPM with data assimilation can simulate more close to observed inflow than those with no data assimilation at both 1-hour lead time, except the relative error in peak flow in 2007. Especially, DHVPM with data assimilation until 10-hour lead time reduced the biases of inflow forecast attributed to observed precipitation error. In conclusion, DHVPM with data assimilation can be useful to improve the accuracy of inflow forecast in the basin where real-time observed inflow are available.

The Characteristics of Probable Maximum Flood on Wi Stream Watersheds (위천유역(渭川流域)의 가능최대홍수량(可能最大洪水量) 특성(特性))

  • Choi, Kyung-Sook;Suh, Seung-Duk
    • Current Research on Agriculture and Life Sciences
    • /
    • v.16
    • /
    • pp.37-44
    • /
    • 1998
  • The estimation of PMP (Probable Maximum Precipitation) and the analysis of characteristics of PMF (Probable Maximum Flood) according to the types of time distribution of rainfall and variations of base flow for the determination of design flood of major hydraulic structures in the watershed area of Wi stream were analysed. The PMP was estimated by the hydro-meteorological method suggested by the guideline of the World Meteorological Organization(WMO). The Blocking method was cited to transpose from PMP to PMS (Probable Maximum Storm) with time distribution. The unit hydrograph, applied for the estimation of PMF was derived by Clark's method. The summaryzed results : (1) The 72 hrs duration PMP in the area is 477.3mm which is 80mm less than the PMP map in Korea and 134 mm lager than the maximum precipitation of 342.9mm in Taegu, near the Wi stream watershed. (2) According to the types of time distribution and variations of base flow, the ranges of PMF for advanced type, central type and delayed type are 3,145.3~3,348.3cms, 3,774.6~3,977.7cms and 3,814.6~4,017.3cms, respectively. Those mean that peak discharge of advanced type is 600cms less than the central type and delayed type. (3) Delayed type among three types by Blocking method has been estimated the largest PMF of 4,017.3cms, and the advanced type has been estimated the smallest PMF of 3,145.3cms. The mean value of the peak PMF of 3,653.6cms may probably be resonable PMF in the Wi stream watershed. The mean PMF could probably be 1.7 times lager than the result of Gajiyama's equation. It is equivalent to the flood of return period 1,000 to 10,000 yrs.

  • PDF

Development of lumped model to analyze the hydrological effects landuse change (토지이용 변화에 따른 수문 특성의 변화를 추적하기 위한 Lumped모형의 개발)

  • Son, Ill
    • Journal of the Korean Geographical Society
    • /
    • v.29 no.3
    • /
    • pp.233-252
    • /
    • 1994
  • One of major advantages of Lumped model is its ability to simulate extended flows. A further advantage is that it requires only conventional, readily available hydrological data (rainfall, evaporation and runoff). These two advantages commend the use of this type of model for the analysis of the hydrological effects of landuse change. Experimental Catchment(K11) of Kimakia site in Kenga experienced three phases of landuse change for sixteen and half years. The Institute of Hydrology offered the hydrological data from the catchment for this research. On basis of Blackie's(l972) 9-parameter model, a new model(R1131) was reorganized in consideration of the following aspects to reflect the hydrological characteristics of the catchment: 1) The evapotranspiration necessary for the landuse hydrology, 2) high permeable soils, 3) small catchment, 4) input option for initial soil moisture deficit, and 5) othel modules for water budget analysis. The new model is constructed as a 11-parameter, 3-storage, 1-input option model. Using a number of initial conditions, the model was optimized to the data of three landuse phases. The model efficiencies were 96.78%, 97.20%, 94.62% and the errors of total flow were -1.78%, -3.36%, -5.32%. The bias of the optimized models were tested by several techniques, The extended flows were simulated in the prediction mode using the optimized model and the data set of the whole series of experimental periods. They are used to analyse the change of daily high and low-flow caused by landuse change. The relative water use ratio of the clearing and seedling phase was 60.21%, but that of the next two phases were 81.23% and 83.78% respectively. The annual peak flows of second and third phase at a 1.5-year return period were decreased by 31.3% and 31.2% compared to that of the first phase. The annual peak flow at a 50-year return period in the second phase was an increase of only 4.8%, and that in the third phase was an increase of 12.9%. The annual minimum flow at a 1.5-year return period was decreased by 34.2% in the second phase, and 34.3% in the third phase. The changes in the annual minimum flows were decreased for the larger return periods; a 20.2% decrease in the second phase and 20.9% decrease in the third phase at a 50-year return period. From the results above, two aspects could be concluded. Firstly, the flow regime in Catchment K11 was changed due to the landuse conversion from the clearing and seedling phade to the intermediate stage of pine plantation. But, The flow regime was little affected after the pine trees reached a certain height. Secondly, the effects of the pine plantation on the daily high- and low-flow were reduced with the increase in flood size and the severity of drought.

  • PDF

Studies on the Overflow from Torrential Stream -A Case Study at the Samsung-cheon in Mt. Kwanak- (야계(野溪)의 월류발생(越流發生)에 관(關)한 연구(硏究) -관악산(冠岳山) 삼성천(三聖川)에서의 시험사례(試驗事例)-)

  • Woo, Bo Myeong;Kim, Kyong Ha;Jeong, Do Hyeon
    • Journal of Korean Society of Forest Science
    • /
    • v.77 no.3
    • /
    • pp.269-275
    • /
    • 1988
  • To investigate the cause of overflow in the torrential stream, the estimated peak flow of run-off and the maximum tarring capacity of the stream were measured at the upstream of Samsung-cheon located in Kwanak Aboretum during July, 1987. The results obtained from this study could be summarized as follows : 1. The surveyed catchment area was 477ha, which was 116 of the designed area (410ha) by the plan. 2. The maximum rainfall intensity measured was 99.5mm/hr and was almost same as the designed intensity(100mm/hr). 3. The surveyed run-off coefficient was 0.672 that was about twice as much as designed one(0.35). 4. The surveyed peak flow of run-off was $88.59m^3/sec$, 222% as large the designed one($39.9m^3/sec$). 5. The designed cross-sectional area of the stream was $17.25m^2$, which was 68% of the designed one$25.43m^2$. 6. The surveyed hydraulic mean radius was 0.94m, which was shorter than the designed one(1.28m). 7. The surveyed mean stream-bed gradient(0.998%) was almost the same as the designed one(1.00%). 8 The surveyed maximum velocity of flow passing through the stream was 2.87m/sec, 78.0 of the designed one(3.68m/sec). 9 The surveyed run-off capacity of the stream was $49.51m^3/sec$, 53% of the designed one ($93.5m^3/sec$).

  • PDF

A Simplified Design Method of Culvert Outlet for Detention Pond (저류지 방류암거의 간편설계기법)

  • Jang, Joo-Young;Lee, Jae-Joon
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.4
    • /
    • pp.263-273
    • /
    • 2011
  • Recently increased rainfall by abnormal climate, risen peak runoff by urbanization, and shorten time of concentration are causing frequent overflow at downstream basin. This problem will be solved through the runoff reduction facilities like detention pond. However so far, most studies about detention pond in Korea are focused on its capacity. A study with respect to outlet facilities of detention pond was insignificant. Design of culvert usually used for outlet facilities of detention pond is generally carried out by using "Road Drainage Design" of Korea Expressway Corporation (1991). So detention pond is unreasonable to apply it. In this study, the culvert flow in submerged condition of upstream at culvert was analyzed., and simplified design procedure for culvert outlet facilities were presented for detention pond.

Characteristics of Storm Runoff and Analysis of Its Correlation with Forest Properties (산림특성에 따른 강우유출수 유출특성 및 상관관계 분석)

  • Chung, WooJin;Chang, SoonWoong
    • Journal of Environmental Science International
    • /
    • v.25 no.7
    • /
    • pp.1007-1016
    • /
    • 2016
  • Environmental policy implementation has been strengthened to protect the source waters in Korea and to improve their water quality. Increasing of non-point source caused water quality problem continuously. Research on runoff from forests, which occupy over 65% of the land in korea, is insufficient, and studies on the characteristics and influences of storm runoff are necessary. In this study, we chose to compare the effects of land use in the form of two types of forest distribution and then gathered data on storm characteristics and runoff properties during rainfall events in these areas. Furthermore, the significance and influences of the discharges were analyzed through correlation analysis, and multilateral runoff characteristics were examined by deducing a formula through $COD_{Mn}$ and TOC regression analysis. At two forest points, for which the basin areas differed from each other, flow changed according to storm quantity and intensity. The peak discharge at point A, where the basin area was big, was high, whereas water-quality fundamental items (BOD, $COD_{Mn}$, and SS) and TOC density were high at point B where the slope and storm intensity were high. Effects of dissolved organic matter were determined through correlation analysis, and the regression formulas for $COD_{Mn}$ and TOC were deduced by regression analysis. It is expected that the data from this study could be useful as basic information in establishing forest management measures.

Application of Urban Hydrologic Monitoring System for Urban Runoff Analysis (도시유출해석을 위한 도시수문 모니터링 기법 적용)

  • Seo, Kyu-Woo
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.5 no.2 s.17
    • /
    • pp.37-44
    • /
    • 2005
  • It reflects well feature of slope that is characteristic of urban river basin of Busan local. In this study, process various hydrological data and basin details data which is collected through basin basis data, hydrological monitoring system(EMS-DEU) and automatic water level equipment(AWS-DEU) for urban flood disaster prevention and use as basin input data of ILLUDAS, SWMM and HEC-HMS in order to examine outflow feature of experiment basin and then use in reservoir design of experiment basin through calibration and verification about HEC-HMS. Inserted design rainfall for 30 years that is design criteria of creek into HEC-HMS and then calculated design floods according to change aspect of the impermeable rate. Capacity of reservoir was determined on the outflow mass curve. Designed detention pond(volume $54,000m^3$) at last outlet upper stream of experiment basin, after designing reservoir. It could be confirmed that the peak flow was reduced resulting from examining outflow aspect. Designing reservoir must decrease outflow of urban areas.

Parameter Estimation for Nash Model and Diskin Model by Optimization Techniques (최적화 기법을 이용한 Nash 모형과 Diskin 모형의 매개변수 추정)

  • Choi, Min-Ha;Ahn, Jae-Hyun;Kim, Joong-Hoon;Yoon, Yong-Nam
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.1 no.3 s.3
    • /
    • pp.73-82
    • /
    • 2001
  • This study examines the applicability of the Nash model and the Diskin model, which are linear and nonlinear runoff models, respectively, by applying optimization techniques to the parameter calibration of the two models. Nonlinear programming which is one of traditional optimization techniques and Genetic Algorithm which has been actively applied recently are used in this study. The Nash and Diskin models which use the calibrated parameter with a flood events are applied to a different flood event in Soyang Dam basin. The results obtained from the parameter calibration show slight discrepancy depending upon the flood events. It has been found in the comparion between the observed hydrograph and the hydrographs obtained from the parameter calibration that the Diskin model can better simulate the observed hydrograph than the Nash model can, especially, for the peak flow. This can be analyzed that the Diskin model which is a nonlinear runoff model is better off in simulating the nonlinear characteristic of the rainfall-runoff process.

  • PDF

Runoff Characteristics Change of a Basin under Urbanization (도시화 진행에 따른 유역 유출특성 변화에 관한 연구)

  • Son, Kwang-Ik;Kim, Min-Chol
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.10 no.4
    • /
    • pp.89-93
    • /
    • 2010
  • It is well known that the drastic change of hydrological characteristics of an urbanized basin causes severe runoff, sediment yield, and peak flow. High vulnerability of urban flood disasters is caused by land-use change and development of a basin. A typical site suffering urbanization was selected and the experimental site has being operated last three years. Hydrological and hydraulic characteristics of the urbanizing basin were examined by observation of runoff, sediment loads and precipitation with T/M. The effects of land-use change were analyzed by examination of the hydrological characteristics, such as run-off ratio (runoff volume/rainfall volume), sediment yields. Runoff coefficient of rational equation was increased as basin was urbanized. Suspended sediment yields due to a urban development activities were raised almost 10 times compare to undisturbed condition for small runoff less than 1 cms. Meanwhile, no big change could be detected for bed loads.