• Title/Summary/Keyword: Railway transportation system

Search Result 784, Processing Time 0.027 seconds

Prediction about Potential Reduction of CO2 through Modal Shift of Car Travelers to Train (여객부문 도로-철도 Modal shift에 따른 CO2 발생량 예측 연구)

  • Kim, Cho-Young;Lee, Cheul-Kyu;Kim, Yong-Ki;Phirada, Pruitichaiwiboon
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.2292-2296
    • /
    • 2010
  • 2020 Korea GHG reduction goal is decreasing 4% compared with that of 2005. Effective counterplan of GHG redection goal needs to set for inductrial allocation and various reduction GHG technologies and policies for transportation have been developed. Modal shifr is one of these main policy and it focused on shifting as much freight as economically meaningful under current market conditions. It improves energy efficiency, consequently reduces GHG effect. This study is proposed as a preliminary studay of analyzing Modal shift effect. modal shift of car travelers to train is concerned in Seoul-Busan section, This study is based on a scenario which can maximize passenger occupancy rate to get the GHG reduction effect and the effect of modal shift of car to train is identified. According to this result, we can get GHG reduction effect through dealing with maximizing passenger occupancy rate on train. Therefore, in order to enhance this modal shift effect, train using rate need to increased and also improvement of policies and cost system are need to be considered to promote increasing use of train.

  • PDF

Improved prestressed concrete girder with hybrid segments system

  • Yim, Hong Jae;Yang, Jun Mo;Kim, Jin Kook
    • Structural Engineering and Mechanics
    • /
    • v.65 no.2
    • /
    • pp.183-190
    • /
    • 2018
  • The prestressed concrete (PSC) technology that was first developed by Freyssinet has significantly improved over the past century in terms of materials and structural design in order to build longer, slender, and more economic structures. The application of prestressing method in structures, which is determined by the pre-tension or post-tension processes, is also affected by the surrounding conditions such as the construction site, workforce skills, and local transportation regulations. This study proposes a prestressed concrete girder design based on a hybrid segment concept. The adopted approach combines both pre-tension and post-tension methods along a simple span bridge girder. The girder was designed using newly developed 2400 MPa PS strands and 60 MPa high-strength concrete. The new concept and high strength materials allowed longer span, lower girder depth, less materials, and slender design without affecting the lateral stability of the girder. In order to validate the applicability of the proposed hybrid prestressed segments girder, a full-scale 35 m girder was fabricated, and experimental tests were performed under various fatigue and static loading conditions. The experimental results confirmed the feasibility of the proposed long-span girder as its performance meets the railway girder standards. In addition, the comparison between the measured load-displacement curve and the simulation results indicate that simulation analysis can predict the behavior of hybrid segments girders.

Spanwise growth of coherent structures in turbulent pipe flow (난류 파이프 유동 내 응집 구조의 횡 방향 성장)

  • Ahn, Junsun;Lee, Jinyoung;Hwang, Jinyul
    • Journal of the Korean Society of Visualization
    • /
    • v.19 no.2
    • /
    • pp.26-31
    • /
    • 2021
  • The spanwise growth of turbulence structures in turbulent pipe flow was investigated using the direct numerical simulation data of Re𝜏 = 544, 934 and 3008. Two-point correlations and pre-multiplied energy spectra of streamwise velocity fluctuations were examined along the spanwise direction. The arclength direction is defined as r𝛳, which is useful for an analogy with the spanwise direction for channels or boundary layers; here, r and 𝛳 are the radial distance from the core and the azimuthal angles, respectively. Both analyses showed that the arclength scales increased with increasing the wall-normal distance. It showed that the coherent structures were confined in the core region due to the crowding effect of a circular pipe geometry. The pipe flow simulation could describe a realistic geometrical flow along the azimuthal direction, unlike the simulations of turbulent channel or boundary layer flow using periodic boundary conditions along the spanwise direction. The present results provided the spanwise organization of energy-containing motions over a broad range of scales in turbulent pipe flow.

Towards the Application of Safety Integrity Level for Improving Process Safety (공정안전향상을 위한 Safety Integrity Level의 적용 방향)

  • Kwon, Hyuck-Myun;Park, Hee-Chul;Chun, Young-Woo;Park, Jin-Hyung
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.5
    • /
    • pp.64-69
    • /
    • 2012
  • The concept of SIL is applied in the most of all standards relating to functional system safety. However there are problems for the people to apply SIL to their plants. as these standards don't include sufficient informations. In this regards, this paper will suggest the direction of SIL application and concept based on IEC 61508 and IEC 61511. A Safety Integrity Level(SIL) is the discrete level(one out of possible fours), corresponding to a range of the probability of an E/E/PE (Electric/Electrical/Programmable Electrical) safety-related system satisfactorily performing the specific safety functions under all the stated conditions within a stated period of time. SIL can be divided into the target SIL(or required SIL) and the result SIL. The target SIL is determined by the risk analysis at the analysis phase of safety lifecycle and the result SIL is calculated during SIL verification at the realization phase of safety lifecycle. The target SIL is determined by the risk analysis like LOPA(Layer Of Protection Analysis), Risk Graph, Risk Matrix and the result SIL is calculated by HFT(Hardware Fault Tolerance), SFF(Safe Failure Fraction) and PFDavg(average Probability of dangerous Failure on Demand). SIL is applied to various areas such as process safety, machinery(road vehicles, railway application, rotating equipment, etc), nuclear sector which functional safety is applied. The functional safety is the part of the overall safety relating to the EUC and the EUC control system that depends on the correct functioning of the E/E/PE safety-related systems and other risk reduction measures. SIL is applied only to the functional safety of SIS(Safety Instrumented System) in safety. EUC is the abbreviation of Equipment Under Control and is the equipment, machinery, apparatus or plant used for manufacturing, process, transportation, medical or other activities.

Flow control of air blowing and vacuuming module using Coanda effect (코안다 효과를 이용한 에어 블로어와 흡입구의 유동 제어)

  • Jeong, Wootae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.3
    • /
    • pp.115-121
    • /
    • 2017
  • The efficiency of railway track cleaning vehicle for eliminating fine particulate matter (PM10 and PM2.5) in a subway tunnel depends strongly on the structure of the air blowing and suction system installed under the train. To increase the efficiency of underbody suction system, this paper proposes a novel method to use the Coanda effect for the air blower and dust suction module. In particular, through Computational Fluid Dynamics (CFD) analysis, the flow control device induced by the Coanda effect enables an increase in the overall flow velocity and to stabilize the flow distribution of the suction module at a control angle of $90^{\circ}$. In addition, the flow velocity drop at the edge of the air knife-type blower can be improved by placing small inserts at the edge of the blower. Those 4 modular designs of the dust suction system can help remove the dust accumulated on the track and tunnel by optimizing the blowing and suction flows.

A Study on the Maintenance Data Analysis of Vehicle Parts of Yongin Light Rail and Condition-Based Prediction Maintenance (용인경전철 차량부품 정비 데이터 분석 및 상태기반 예지 유지보수 방안 연구)

  • Lee, Kyeong Ho;Lee, Joong Yoon;Kim, Yeong Min
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.18 no.1
    • /
    • pp.1-13
    • /
    • 2022
  • The Yongin Light Rail train was manufactured by Bombardier Transportation in Canada in 2008 and is a privately invested railway line that has been operating in Yongin-si, Gyeonggi-do, since 2013. When the frequency of train failure increases due to aging, and there is a delay in the delivery period of imported parts used in the Bombardier manufactured trains, timely vehicle maintenance may not be performed due to lack of parts. To solve this problem, it is necessary to build a 'vehicle parts maintenance demand forecasting system' that analyzes the accurate and actual maintenance demand annual based on the condition of vehicle parts. The full scope of analysis in this paper analyzes failure data from various angles after opening of Yongin light rail vehicle to analyze failure patterns for each part and identify replacement cycles according to possible failures and consumption of parts. Based on this study, it is expected that Yongin Light Rail's maintenance system will change from the existing time-based replacement (TBM) concept to the condition-based maintenance (CBM) concept. It is expected that this study will improve the efficiency of the Yongin Light Rail maintenance system and increase vehicle availability. This paper is a fundamental for establishing of a system for predicting the replacement timing of vehicle parts for Yongin Light Rail. It reports the results of data analysis on some vehicle parts.

Wave Propagation on a High-speed Railway Embankment Using a Pile-slab Structure (파일슬래브구조가 적용된 고속철도 토공노반에서의 진동 전파)

  • Lee, Il Wha;Lee, Sung Jin;Lee, Su Hyung;Lee, Kang Myung
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.4
    • /
    • pp.278-285
    • /
    • 2013
  • The suppression of residual settlement is required on earthwork sections as concrete track is introduced. Use of pile-slab structure is one of the settlement restraining methods applied on soft ground. The slab distributes the upper embankment load and piles transfer the load from the slab to the stiff ground. While this method is very effective in terms of load transfer, it has not yet been established for dealing with the vibration transfer effects and interaction characteristics between a structure and the ground. It is possible that vibration caused by a moving train load is propagated in the upper embankment, because the slab acts as a reflection layer and waves are multi-reflected. In this present paper, wave propagation generated by a moving train load is evaluated in the time and frequency domains to consider a roadbed structure using an artificial impact load and field measured train load. The results confirmed the wave reflection effect on the pile-slab structure, if the embankment height is sufficient, vibration propagation can be stably restrained, whereas if the height is not sufficient, the vibration amplitude is increased.

An Analysis of Running Stability of 1/5 Small Scaled Bogie on Small-Scaled Derailment Simulator (소형탈선시뮬레이터상에서의 1/5 축소대차 주행안정성 해석)

  • Eom, Beom-Gyu;Kang, Bu-Byoung;Lee, Hi-Sung;Song, Moon-Shuk
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.36 no.11
    • /
    • pp.1413-1420
    • /
    • 2012
  • To predict the dynamics behavior, running stability, etc. of a railway vehicle and to understand its physical characteristics, analytical methods are used for the testing and manufacturing of a scale model along with numerical simulations in developed countries (England, France, Japan, etc.). The test of the dynamics characteristics of full-scale models is problematic in that it is expensive and time-consuming because an entire large-scale test plant needs to be constructed, difficulties are involved in the test configuration, etc. To overcome these problems, an analytical study involving dynamics tests and computer simulations using a scaled bogie model that applies the laws of similarity was carried out. In this study, we performed stability analysis on a 1/5 small scaled bogie for parameters such as the running speed and carbody weight by using an analysis model. Furthermore, we verified the reliability by using a small-scaled derailment simulator and examined the dynamic characteristic of the 1/5 small scaled bogie.

Video Image Analysis in Accordance with Power Density of Arcing for Current Collection System in Electric Railway (전기철도 집전장치의 아크량에 따른 비디오 이미지 분석)

  • Park, Young;Lee, Kiwon;Park, Chulmin;Kim, Jae-Kwang;Jeon, Ahram;Kwon, Sam-Young;Cho, Yong Hyun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.9
    • /
    • pp.1343-1347
    • /
    • 2013
  • This paper presents an analysis methods for current collection quality in catenary system by means of video image based monitoring system. Arcing is the sparking at the interface point between pantograph and contact wire when the electric trains have traction current values at speed. Percentage of arcing at maximum line speed is measurable parameters for compliance with the requirements on dynamic behaviour of the interface between pantograph and contact wire in accordance with requirement of IEC and EN standards. The arc detector and video is installed on a train aim at the trailing contact strip according to the travel direction. The arc detector presented and measured verity of value such as the duration and power density of each arc and the video image is measured a image when the arc is occurred in pantograph. In this paper we analysis of video image in accordance with power density of arcing from arc detector and compared with video image and power density of arcing so as to produce quality of arcing from image.

Technologies for improving the running safety of a tram operating on the concrete embedded track (콘크리트 매립형 궤도를 운행하는 트램의 주행안전성 향상 기술)

  • Seo, Sung-il;Mun, Hyung-Suk;Kim, Sun-Chun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.10
    • /
    • pp.717-724
    • /
    • 2017
  • To improve the running safety of a tram operating on a concrete embedded track, a bogie, the core system of the tram, was developed and fabricated. After it was integrated with the prototype car body, a short distance track with a sharp curve and steep gradient was constructed for the test operation. A formula to check the interference of the wheel flange with the track during running was proposed. Based on the results provided by the formula, the track was designed. Another simple formula was derived to estimate the derailment quotient and the wheel unloading ratio. During running on the track, the acceleration of the car body was measured and the interface status between the wheel and the track was monitored by a video system. According to the results calculated by these simple formulas, the derailment quotient and wheel unloading ratio were estimated to be within the safety criteria. In the actual test, no derailment occurred and the measured acceleration satisfied the criteria. Also, there was no interference between the wheel and track. The video monitoring results showed no signs of derailment, such as the climbing of the wheel. The pinion in the center showed good running safety, contacting smoothly with the rack. The measurements of environmental noise proved that the criteria were satisfied.