• Title/Summary/Keyword: Railway track maintenance

Search Result 322, Processing Time 0.029 seconds

Optimal Vertical Stiffness of Fastener of Concrete Track in High-Speed Railway (고속철도 콘크리트궤도 체결구 최적 수직강성)

  • Yang, Sin-Chu
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.1
    • /
    • pp.43-52
    • /
    • 2015
  • In this study, to minimize both the costs associated with track maintenance and the energy consumption for train operation, a numerical method that evaluates the optimal vertical stiffness of a fastener for concrete track is presented. A progress model of the track damage is established in order to calculate the concrete track maintenance cost according to the fastener stiffness. Also, the quantitative relationship between the progress of the track damage and the maintenance of the concrete track is derived. The wheel load is more exactly evaluated by using the advanced vehicle-track interaction model, which can precisely consider the behaviors of the track components. An optimal range for the stiffness of the fastener, a range that is applicable to the design of concrete track for domestic high speed lines, is proposed.

Dynamic Analysis of Structure's Approaches through Field Tests in the Conventional Railway (현장계측을 통한 기존선 철도 구조물 접속부의 거동분석)

  • Park, Joon-Oh;Lee, Sang-Bae;Hong, Won-Pyo
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1864-1874
    • /
    • 2007
  • Korean trains pass many mountain areas, so the volume of structures like bridge and tunnel has large part of railway lines. Train speed-up naturally needs a straight line in railway, then structures are increasing, and the length of structure has more than 70% in Kyongbu high-speed railway. The stiffness of bridge and tunnel is higher than the soil in the roadbed in spite of dynamic difference in vibration and displacement. Differences in stiffness have more dynamic effects and increase the deformation and destruction in the track and roadbed. This influences passenger's comfort and the safety of operation, and it needs more track maintenance. This study selected tunnel with ballast track, tunnel with concrete track, and structure's approaches with short maintenance cycle in the roadbed and had track acceleration tests and track liner inspections using track master in the field. This study will measure periodically to structure's approaches which have very fast track irregularity and analyze dynamic differences and track irregularity near structure's approaches, so realize the cause of track irregularity of structure's approaches and use basic data for reasonably strengthening method of structure's approaches.

  • PDF

Analysis of Life Cycle Costs of Railway Track : A Case Study for Ballasted and Concrete Track for High-Speed Railway (철도 궤도의 수명주기비용 분석 : 고속철도 자갈궤도와 콘크리트궤도 사례 연구)

  • Jang, Seung Yup
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.20 no.2
    • /
    • pp.110-121
    • /
    • 2016
  • In the decision-making, such as selection of structure, construction method, or time and scheme of maintenance, the evaluation of life-cycle cost(LCC) is of great importance. The maintenance cost occupy a large portion of the LCC of the railway track as well as the initial construction cost. Futhermore, the proportion of the maintenance cost is much higher in the ballasted track. Thus, the importance of the LCC evaluation is higher than in any other engineering structures. In this study, a LCC model that can consider various design parameters such as the type of track structure, annual traffic volume, axle load, train speed, and proportion of curve sections and engineering structures has been developed. Fundamental data for calculating costs also have been presented. Based on the model and data proposed, the trends in the variation of LCC according to the design parameters were examined and the most important design parameters in the LCC analysis of railway track were investigated. The results show that the proportion of renewal and operational costs is much higher in the ballasted track than in the concrete track, and the annual traffic volume and ballast taming period are most significant factors on the LCC of the ballasted track. On the contrary, it is revealed that the proportion of the initial construction costs in the concrete track is much higher, and the LCC of the concrete track is less sensitive to the traffic volume, train speed, and axle load.

Economic Assesment for Track Ballast Structures based on Proper Maintenance Level (적정 유지관리수준에 기초한 궤도도상구조에 대한 경제성 검토)

  • Baek, Jae-Wook;Joo, Hwan-Joong;Song, Yoo-Seob;Park, Tae-Hyo
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.167-178
    • /
    • 2007
  • In general, it is known that the concrete ballast track is possible to reduce a cost of maintenance activities cause of maintenance free by restrictive maintenance in application of track ballast structures. However, if deteriorations and fracture mechanism of a material are considered, proper maintenance activities and repairing are continually required. For the problems, we evaluated an economical efficiency of the gravel ballast and the concrete ballast on a proper level of maintenance activities. As the method based on history path is difficult to obtain sufficient reliabilities cause of an absence of real data for maintenance activities, we chose the delphi survey method by professional group, and we obtained the appropriate index and profiles for maintenance activities. As a result, we founded that effects for cost reduction can be expected by preventive maintenance management, and we proposed economical restrictions and life cycle cost for track ballast structures in a life cycle.

A New Slab Track System (새로운 슬래브궤도 시스템)

  • 강보순
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.213-218
    • /
    • 2002
  • A new German high speed railway slab track was investigated. The construction objective was to provide a durable and maintenance free track system consisting of precast concretepanels of consistently high quality and highest achievable accuracy in track geometry. The System on the basis of precast panels similar to the slab track system constructed on the line Dachau- Karlsfeld in 1997.

  • PDF

Improvement of inspection system for common crossings by track side monitoring and prognostics

  • Sysyn, Mykola;Nabochenko, Olga;Kovalchuk, Vitalii;Gruen, Dimitri;Pentsak, Andriy
    • Structural Monitoring and Maintenance
    • /
    • v.6 no.3
    • /
    • pp.219-235
    • /
    • 2019
  • Scheduled inspections of common crossings are one of the main cost drivers of railway maintenance. Prognostics and health management (PHM) approach and modern monitoring means offer many possibilities in the optimization of inspections and maintenance. The present paper deals with data driven prognosis of the common crossing remaining useful life (RUL) that is based on an inertial monitoring system. The problem of scheduled inspections system for common crossings is outlined and analysed. The proposed analysis of inertial signals with the maximal overlap discrete wavelet packet transform (MODWPT) and Shannon entropy (SE) estimates enable to extract the spectral features. The relevant features for the acceleration components are selected with application of Lasso (Least absolute shrinkage and selection operator) regularization. The features are fused with time domain information about the longitudinal position of wheels impact and train velocities by multivariate regression. The fused structural health (SH) indicator has a significant correlation to the lifetime of crossing. The RUL prognosis is performed on the linear degradation stochastic model with recursive Bayesian update. Prognosis testing metrics show the promising results for common crossing inspection scheduling improvement.

Risk Estimation Study on Railway Track Worker Hit by Train (철도 운행선로 작업자와 열차 접촉사고 위험도 평가에 관한 연구)

  • Kwak, Sang Log
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.3
    • /
    • pp.72-78
    • /
    • 2020
  • The accident fatality rate has decreased by more than 90% compared to 2006, due to the safety management and safety investment based on the Rail Safety Act. Most railway safety indicators, including fatality rates, have improved significantly from 60% to 80%, reaching the level of developed countries in terms of most railway safety indicators. However, the only staff fatality rate at work is not improved, and it is 3 to 5 times higher than that of developed countries. Most of the fatality occurred during employee's work recently occurred due to accidents hit by train while track work. In principle, when operating track need to check or maintenance, the operation of the train should be stopped and the work carried out. However, in Korea, due to the highest passenger density and train operating density in the world, it is caused by a structural problem that requires workers to enter the track while the train is running and perform various tasks such as maintenance and inspection. In this study, we analyzed the risk of accidents caused by hit by trains on the track, which is the biggest cause of staff fatality, using the main statistics of the last 10 years. In detail, the scenarios of the main causes of hit by trains and workers were formed to suggest the effectiveness of the current preventive measures and supplementary.

Railway Track Maintenance Scheduling using Binary Artificial Bee Colony (Binary Artificial Bee Colony를 이용한 궤도 유지보수 일정계획)

  • Nam, Duk-Hee;Kim, Ki-Dong;Kim, Sung-Soo;Lee, Sung-Uk;Woo, Byoung-Koo;Lee, Ki-Woo
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1191-1202
    • /
    • 2010
  • The objective of this paper is to propose a Binary Artificial Bee Colony (BABC) to obtain the best/optimal solution for NP-hard scheduling problem of railway track maintenance. We can greatly maximize the objective value using proposed BABC within limited computation time. The proposed BABC mechanism is very efficient to find the best solution because of employing fewer control parameters.

  • PDF

Development of turnout on concrete track using Fast clip (Fast clip을 적용한 콘크리트궤도용 분기기 개발)

  • Hwang, Kwang-Ha;Ryou, Ki-Tae;Park, Chun-Bok;Park, Kwang-Ryoun;Yun, Byung-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1002-1008
    • /
    • 2011
  • Turnout is a mechanical installation enabling railway trains to be guided from one track to another at a railway junction. there are classified variously according to rail type, sleeper type, fastening system, track type. Construction of concrete track are on the increase recently to secure the safety of track structure as well as to reduce the maintenance cost. SFC fastening system used the plain track a lot and for those reasons, The fast clip turnout demand growing to improving efficiency of the maintenance cost by unification of fastening clip on whole line. in this study is about development of the fastening system for new turnout using fast clip. this fastening system assembled elasticity pad underneath a base plate. its can change stiffness how to adjust contact surface area of elasticity pad Developed fastening system have passed test according to rule of KRS-TR0014-09R (rail fastening system) and Performance Certification by KR.

  • PDF

COBie Based Maintenance Document Generation of Railway Track (COBie 기반 철도 선로유지관리 문서 생성)

  • Seo, Kyung-Wan;Kwon, Tae-Ho;Lee, Sang-Ho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.4
    • /
    • pp.307-312
    • /
    • 2017
  • In this study, we proposed a method to generate a maintenance documents for railway track through Construction Operations Building information exchange(COBie) which is a subset of Industry Foundation Classes(IFC), a data model for Building Information Modeling(BIM). In order to define the items necessary for railway track maintenance document generation, we analyzed the guideline of maintenance and management to track by the Ministry of Land, Infrastructure and Transport(MLTM), and defined the way to refer to the information items in the COBie spreadsheet. The additional properties not supported in IFC, were created for generation of an Information model that reflecting maintenance information items of railway track by applying user-defined property set within the IFC framework. An IFC-based Information model reflecting the user-defined property was implemented through BIM software, and rail track maintenance information items were transferred to COBie spreadsheet according to the defined approach. It is tested that the information can be transferred from the IFC-based as-built model to the COBie spreadsheet, which can be used to generate the necessary documents for railway facility maintenance work.