• 제목/요약/키워드: Railway track maintenance

검색결과 323건 처리시간 0.025초

GPR/PBS/FWD를 이용한 도상/노반 상태평가 기술 개발 (Development of ballast/subgrade investigation technique using GPR/PBS/FWD)

  • 김대상;박태순;강승구
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.1113-1118
    • /
    • 2004
  • Ballasted track is constructed in consideration of the maintenance. The application time and frequency of MTT(Multiple Tie Tamper) and BS(Ballast Cleaner) depend on track geometry measurements. This paper presents the application of Ground Penetrating Radar(GPR), Falling Weight Deflectometer(FWD), and Portable Ballast Sampler (PBS) to evaluate the effects of track geometry due to substructure deterioration and to build a reliable substructure evaluation system.

  • PDF

철도교량의 동적거동 특성을 고려한 자갈도상궤도의 상태추정에 관한 연구 (An Estimate of Ballast Track Condition on Dynamic Behavior of Railway Bridge)

  • 권오순;최정열;강명석;이희업;박용걸
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.480-493
    • /
    • 2007
  • 기존 노선의 속도향상에 따른 궤도 유지보수비의 절감을 위하여 여러 철도 선진국에서는 다양한 형태의 궤도를 고안하여 사용하고 있지만 현재까지 우리나라의 경우 대부분의 선로는 자갈도상이다. 그러나 현재 국철 및 지하철의 경우 장기사용에 따라 자갈도상기능이 급격히 저하되고 연간 증가되고 있는 열차운행 통과톤수로 인하여 장 단기적인 궤도유지관리에 문제점이 발생하고 있다. 또한 자갈도상 궤도는 자갈마모, 궤도틀림 및 균일하지 않은 궤도지지 강성 등의 문제점으로 인하여 막대한 유지보수 비용이 사용되고 있다. 철도교량상 자갈도상 궤도는 교량과 궤도의 상호작용으로 인하여 자갈도상의 노후화 진전속도가 일반 토노반 및 지하, 터널구간보다 빠르며 이러한 궤도의 노후화는 열차하중의 동적 충격하중을 증폭시켜 궤도 및 교량의 부담력을 증가시키게 된다. 또한 교량상 자갈도상 궤도가 노후되어 하중분산 및 진동감쇠 등과 같은 정상적인 자갈도상 궤도로서의 역할을 수행하지 못하게 된다면 교량이 부담하는 정, 동적하중의 영향이 더욱 가중되고 이는 교량의 거동특성에 영향을 미치게 된다. 따라서 적정 수준의 궤도상태를 유지함으로써 궤도의 적정탄성력을 확보하고 이를 통해 교량의 동적하중부담을 저감시키는 것이 중요하다. 그러나 현행 철도교량 설계 시 적용하는 궤도의 영향은 고정하중으로만 고려되어, 이러한 자갈도상 궤도의 탄성거동 영향이 반영되지 못하는 실정이다. 따라서, 본 연구에서는 철도교량의 동적거동 특성을 감안한 교량상 자갈도상 궤도의 탄성력을 추정하고자 공용중인 철도교량 및 자갈도상궤도에 대한 현장측정 및 해석을 통하여 실교량의 동적응답특성을 유발하는 운행선 자갈도상 궤도의 탄성력을 추정하고, 자갈도상궤도의 탄성력변화가 철도교량의 동적거동에 미치는 영향을 검토하였다. 그 발현이 미약하거나 나타나지 않았다. 이상의 결과를 종합하여 FS-s2, FS-s5, FS-s18 및 Fs-s22 유전자들은 대부분이 기능이 거의 알려져 있지 않는 것들로 기능력의 변화 과정에서 중요한 역할을 할 것으로 생각되나 앞으로 보완 연구를 통하여 각 각의 유전자들의 보다 정확한 기능을 이해하는 것이 필요 할 것으로 사료된다.led sealant의 사용이 바람직하다고 생각된다. 그러나 미세누출에 있어 교합력을 고려한 실험이나 장기간의 임상실험이 필요할 것이다.5).vac/PE필름은 장기저장시 사용이 좋을 것으로 사료된다. 2) 질소가스 및 탄산가스투과도 각각 $61.6{\mu}PVDC/PE/Al-vac/CPS\;12.5,\;59.8>96.9{\mu}PE/PVDC/PE\;7.1,\;42.0>79.3{\mu}ET/PVDC/L-LDPE\;6.4,\;34.2>72.2{\mu}PET/PVDC/PE/Al-vac/PE\;0.74,\;4.2cc/m^2.24hr{\cdot}atm$으로 가장 우수한 PET/PVDC/PE/Al-vac/PE 복합필름이 장기저장용으로 이용이 좋을 것으로 사료된다.태발생을 연구하는데 기초적인 자료로 활용될 수 있을 것으로 사료된다. 조사한 결과 유의확률이 0.05 이하인 수치들은 Hb과 Albumin, K, Na간, Neutrophil과 Leukocyte간이었고 상관계 수치는 $0.370{\sim}0.442$ 사이로 나타났다. 유의확률 0.01이하로 조사된 수치는 Cholesterol과 ALT간, LDH와 Platelet, Creatinine간, Platelet와 BUN간, Na와 K수치간 이었으며 상관계수는 $0.531{\sim}0.866$사이로 나타났다. 5. 농양

  • PDF

B2S궤도시스템의 초기 시설 투입비용 분석 (Initial Investment Cost Analysis of Facilities of B2S Track System)

  • 김효산;민준호;유재광;이달재
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.733-739
    • /
    • 2011
  • B2S(Ballasted track To Slab track) that is track system has been first developed in 2004 with foundation of rich experience and know-how of subway track upkeep and mending of facilities in 36 years to improve an existence pebble track at a concrete track. 'B2S' is admitted technology through patent registration in the domestic and Europe and it's made by a factory and put together at field, so it's able to construct precisely and to reduce a construction period. In addition, safety, the ecological balance and durability are excellent, and walking, cleaning, etc. has the advantage of easy maintenance. 'B2S' is currently laying 27.7km at Seoulmetro as of end of 2010 standard, but it'll be expected to be applied to a domestic Metro more from now on. It is possible to classify the total cost resolution structure of B2S system by R&D cost, test production and experiment cost, the initial facility cost, maintenance cost, disposal cost. In this research, it seems useful for selection evaluation which considered the life cycle cost or economics of the concrete track structure by analyzing an initial cost of facilities.

  • PDF

레일 매립궤도의 특성과 노면철도에 적용 가능성에 관한 연구 (Embedded Rail Track on the LRT(Tram))

  • 이기승;김성칠;백진기;고동춘
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.394-399
    • /
    • 2005
  • Embedded rail track can be described as a track structure that is completely covered within pavement. Rail supported continually on a concrete slab or concrete plinth. There are many kinds of types such as non-resilient track and resilient track, super resilient embedded track (floating slab). Embedded rail track is generally the standard for light rail transit routes because this track has many advantages such as reducing noise, maintenance cost and weight of track. In this paper, decision of track profile is restricted by the optimum levels of the flangeway and the gap between the rail head and the pavement surface of depressing tread zone. By result of this study, embedded rail track can reduce corrosion of rail, internal stress and rail deflection.

  • PDF

강화노반 두께 결정을 위한 영향인자 민감도 분석 (Sensitivity Analysis of the Factors Influencing for Decision of Reinforced Roadbed Thickness)

  • 최찬용;이진욱;배재훈;신은철
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1827-1832
    • /
    • 2007
  • The purpose of a railway track is to provide a smooth surface for safe and economical train transportation. The performance of the track results from a complex interaction of the track and subgrade components in response to train loading and environmental actions. In the past, the role of subgrade as the track foundation were not recognized adequately. There are insufficient information and inadequate methods for subgrade design, assessment and improvement. This situation has survived for a long time largely because a subgrade defect can often be adjusted by adding more ballast under the ties or applying more frequent track maintenance. Therefore, the application of reinforced roadbed technology will be expected to increase in the future. The reinforced roadbed thickness is set depending on subgrade reaction modulus$(K_{30})$ in the condition of upper subgrade through PBT in both conventional railroad and KTX railroads. As train velocity (V), train passing tonnage (N), and train axial load (P) are not considered in design, the roadbed thickness could be overestimated (or underestimated). Therefore, In this study, the computer model, GEOTRACK, was analyzed the influence of reinforced roadbed thickness factors on track modulus and the characteristics of stress pulses in track and subgrade generated by repeated axle loading.

  • PDF

Effect of lateral differential settlement of high-speed railway subgrade on dynamic response of vehicle-track coupling systems

  • Zhang, Keping;Zhang, Xiaohui;Zhou, Shunhua
    • Structural Engineering and Mechanics
    • /
    • 제80권5호
    • /
    • pp.491-501
    • /
    • 2021
  • A difference in subgrade settlement between two rails of a track manifests as lateral differential subgrade settlement. This settlement causes unsteadiness in the motion of trains passing through the corresponding area. To illustrate the effect of lateral differential subgrade settlement on the dynamic response of a vehicle-track coupling system, a three-dimensional vehicle-track-subgrade coupling model was formulated by combining the vehicle-track dynamics theory and the finite element method. The wheel/rail force, car body acceleration, and derailment factor are chosen as evaluation indices of the system dynamic response. The effects of the amplitude and wavelength of lateral differential subgrade settlement as well as the driving speed of the vehicle are analyzed. The study reveals the following: The dynamic responses of the vehicle-track system generally increase linearly with the driving speed when the train passes through a lateral subgrade settlement area. The wheel/rail force acting on a rail with a large settlement exceeds that on a rail with a small settlement. The dynamic responses of the vehicle-track system increase with the amplitude of the lateral differential subgrade settlement. For a 250-km/h train speed, the proposed maximum amplitude for a lateral differential settlement with a wavelength of 20 m is 10 mm. The dynamic responses of the vehicle-track system decrease with an increase in the wavelength of the lateral differential subgrade settlement. To achieve a good operation quality of a train at a 250-km/h driving speed, the wavelength of a lateral differential subgrade settlement with an amplitude of 20 mm should not be less than 15 m. Monitoring lateral differential settlements should be given more emphasis in routine high-speed railway maintenance and repairs.

개발형 콘크리트 슬래브궤도의 성능평가 (The Performance Evaluation of Newly Developed Concrete Slab Track)

  • 강윤석;김은;이일화;양신추
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(II)
    • /
    • pp.151-156
    • /
    • 2003
  • The purpose of this study is to establish the test procedure of concrete slab track and to estimate the performance of newly developed slab track. The basic direction of conceptual design of KRRI Slab track was determined in the viewpoint of running safety, economic efficiency and maintenance costs. Based on the research results, a detailed conceptual design of KRRI slab track is suggested. For the systematic development of slab track, a comparative study is carried out, comparing merits and demerits of each slab type, and used in the design process of slab track. Slab track tests were performed at lab and the slab track system was improved by the experiment result. Site Test also were performed in test slab track.

  • PDF

레일응력을 고려한 레일패드강성 결정 (Evaluation of Rail pad Stiffness Considering Stress of Rail)

  • 박대근;김재학;손기준;김한종
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.419-431
    • /
    • 2007
  • The track and rail surface geometry is of prime importance on the requirement for track dynamic stiffness, particularly for the speed of 350 km/h, for which both the requirement for fatigue and tensile strength limits require a lower stiffness than 100 kN/mm, which is near the value for ballasted track. However, the track quality has been considered as being the same for 350 km/h as that for 300 km/h, and based on ballasted track, and the track geometry may be kept in better condition with a slab track(probably more similar to the medium quality track geometry of ballasted track). In conclusion, under the condition that the track geometry quality provided by the concrete slab system is fairly good, and that the required maintenance is applied to the rail surface, there would be no safety risk if the fastening system point stiffness reaches 160 kN/mm for 300 km/h operation, and 110 N/mm at 350 km/h.

  • PDF

슬래브궤도의 구조안전성 평가 (Evaluating of Structural Safety of Slab Track)

  • 강윤석;양신추;이영제
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2000년도 춘계학술대회 논문집
    • /
    • pp.431-438
    • /
    • 2000
  • In recent years. the destructive force acting on the ballasted track is on the increase with the speed-up of trains and the number of trains, requiring more labor and expenditure to maintain the track in goof condition. Slab track has been developed to decrease the track maintenance work on earthworks. One type of slab track Rheda has Prefabricated track grid, consisting of rails. Prestressed concrete sleepers and reinforcement rods are aligned into position. and then concrete is then placed to integrate the sleepers into a reinforced concrete track slab. In this paper, a new analysis model for the system analysis of the slab track is presented. Then the analysis results are compared with requirements for slab track.

  • PDF

도시철도 선로시설물 유지관리를 위한 데이터베이스 구축방안 연구 (Development of the Database System for Maintenance of Track System in Urban Transit)

  • 신정렬;이우동;김길동;박서영
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.935-941
    • /
    • 2004
  • While the environment of usage of information and technology is getting stable and technology is being developed more deeply due to the globalization, making information, standardization, in order to make a fast response to the new industry strategy and business environment, mutual communication and management of correct and fast information are focused on as fundamental elements of keeping competitive power. Accordingly strategic development of urban transit operation organization, storage of information technology of urban railroad, and buildup of standard information infra are very important, so that computerized information system has been built up standardizing efficient maintenance framework of urban transit facilities. To maintain these facilities efficiently, storing the real-time information by standardizing the maintenance organization and building up computerized information system are very important with management of information history of existing maintenance work. Therefore, for the efficient maintenance of track system among urban transit facilities, standardized facilities classification and definition of management elements, and the plan of designing and building standardized database about track. system through standardizing technology resources are described in this paper.

  • PDF