• Title/Summary/Keyword: Railway track

Search Result 1,569, Processing Time 0.025 seconds

Vibration Characteristics of High-speed Railway Lines on the Type of Track (고속철도 궤도 타입에 따른 진동 특성)

  • Lee, Chan-Woo;Ham, Ham-Young;Kim, Jae-Chul
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.332-336
    • /
    • 2011
  • IN THIS STUDY, BASED ON THE TYPE OF HIGH SPEED RAILWAY TRACK VIBRATION CHARACTERISTICS WERE MEASURED AT KTX VEHICLE. KTX ROUTE BALLASTED TRACK HAS BEEN INSTALLED TOGETHER WITH THE CONCRETE TRACK. CONCRETE MUST BE TRACK IRREGULARITY THAN BALLASTED TRACK, VEHICLES VIBRATION VALUES THAT ARE SMALLER. ALSO, IN TERMS OF MAINTENANCE, CONCRETE TRACK IS KNOWN TO BE MORE FAVORABLE THAN THE BALLASTED TRACK. PHASE 2 IS THE KTX, DAEGU - BUSAN IS A SECTION OF CONCRETE TRACK. IN THIS STUDY, "KUUNG-BU HIGH-SPEED RAILWAY LINES" INSTALLED ON THE CONCRETE TRACK AND BALLASTED TRACK KTX FROM THE VEHICLE WHEN INSTALLED BETWEEN RAILS, SLEEPER AND BALLAST ON THE TRACK WAS MEASURED VIBRATIONS.

  • PDF

Three-dimensional finite element analysis of the interference of adjacent moving trains resting on a ballasted railway track system

  • Marwah Abbas Hadi;Saif Alzabeebee;Suraparb Keawsawasvong
    • Geomechanics and Engineering
    • /
    • v.32 no.5
    • /
    • pp.483-494
    • /
    • 2023
  • High-speed trains became common nowadays due to the need for fast and safe mean to transport goods and people. However, the use of high-speed trains necessitates the examination of the critical speed, which is the train speed at which the maximum settlement of the railway track occurs. The critical speed and railway track settlement have been investigated considering only one train in previous studies. However, it is normal to have two adjacent trains moving at the same time. This paper aims to understand how the interference of two moving trains affects the settlement and critical speed of ballasted railway track. Calibrated three-dimensional finite element models of railway track subjected to one moving train and two moving trains have been developed to address the aim of the study. It is found that the interference dramatically increases the railway track settlement with a percentage increase ranges between 5 and 100%. It is also found that the percentage increase of the railway track settlement depends on the train speed and the distance between the moving trains. In addition, it is found that the thickness of the ballast layer and the stiffness of the subgrade have minor influence on the percentage increase of the settlement. Importantly, the results of this paper illustrate the importance of the interference of the moving trains on the dynamic response of the railway track. Thus, there is a need to consider the dynamic interaction between the adjacent moving trains in the design of railway track foundation.

Experimental Study on Applying a Transition Track System to Improve Track Serviceability in Railway Bridge Deck Ends (철도교량 단부 궤도의 사용성 향상을 위한 횡단궤도시스템 적용에 관한 실험적 연구)

  • Lim, Jongil;Song, Sunok;Choi, Jungyoul;Park, Yonggul
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.3
    • /
    • pp.207-216
    • /
    • 2013
  • The components of concrete track (rail and rail fastening system) in railway bridge deck ends are damaged and deteriorated by track-bridge interaction forces such as uplift forces and compression forces owing to their structural flexural characteristics (bridge end rotation). This had led to demand for alternatives to improve structural safety and serviceability. In this study, the authors aim to develop a transition track to enhance the long term workability and durability of concrete track components in railway bridge deck ends and thereby improve the performance of concrete track. A time-history analysis and a three-dimensional finite element method analysis were performed to consider the train speed and the effect of multiple train loads and the results were compared with the performance requirements and German standard for transition track. Furthermore, two specimens, a normal concrete track and a transition track, were fabricated to evaluate the effects of application of the developed transition track, and static tests were conducted. From the results, the track-bridge interaction force acting on the track components (rail displacement, rail stress, and clip stress) of the railway bridge deck end were significantly reduced with use of the developed transition track compared with the non-transition track specimen.

Study on vibration energy characteristics of vehicle-track-viaduct coupling system considering partial contact loss beneath track slab

  • Liu, Linya;Zuo, Zhiyuan;Zhou, Qinyue;Qin, Jialiang;Liu, Quanmin
    • Structural Engineering and Mechanics
    • /
    • v.75 no.4
    • /
    • pp.497-506
    • /
    • 2020
  • CA mortar layer disengagement will give rise to the overall structural changes of the track and variation in the vibration form of the ballastless track. By establishing a vehicle-track-viaduct coupling analysis and calculation model, it is possible to analyze the CRTS-I type track structure vibration response while the track slab is disengaging with the power flow evaluation method, to compare the two disengaging types, namely partial contact loss at one edge beneath track slab and partial contact loss at midpoint beneath track slab. It can also study how the length of disengaging influences the track structures vibration power. It is showed that when the partial contact loss beneath track slab, and the relative vibration energy level between the rail and the track slab increases significantly within [10, 200]Hz with the same disengaging length, the partial contact loss at one edge beneath track slab has more prominent influence on the vibration power than the partial contact loss at midpoint beneath track slab. With the increase of disengaging length, the relative vibration energy level of the track slab grows sharply, but it will change significantly when it reaches 1.56 m. Little effect will be caused by the relative vibration energy level of the viaduct. The partial contact loss beneath the track slab will cause more power distribution and transmission between the trail and track slab, and will then affect the service life of the rail and track slab.

A feasibility study on adoption of slab track for the new high speed rail way line between Daegu and Pusan (대구-부산간 고속철도 신설선에 대한 슬래브 궤도구조의 도입 타당성에 관한 연구)

  • Kim, Hae-Gon;Yang, Keun-Yul;Kim, Kwang-Mo
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.27-34
    • /
    • 2003
  • This Study is about adoption of slab track on the new high speed railway line between Daegu and Busan. While ballast track currently used is easy to construct with low investment, the error margin of rail track occurs in the track due to the repetition load of the train. Therefore, repairs should be carried out all the time to put the railway track at the repair level or less. In addition, noise caused by such repairs has become a new social problem at night. Construction costs for slab track are about 1.3-1.5 times higher than those for ballast track. However, slab track will save labor costs by solving various problems of ballast track. In this regard, it is feasible to adopt slab track on the new high speed railway line between Daegu and Busan.

  • PDF

A Study on the Dynamic Analysis of Railway Vehicle by Using Track Coordinate System (트랙좌표계를 이용한 철도차량의 동역학 해석에 관한 연구)

  • Kang, Juseok
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.21 no.2
    • /
    • pp.122-130
    • /
    • 2013
  • Rail geometries such as cant, grade and curvature can be easily represented by means of a track coordinate system. In this analysis, in order to derive a dynamic and constraint equation of a wheelset, the track coordinate system is used as an intermediate stage. Dynamic and constraint equations of railway vehicle bodies except the wheelset are written in the Cartesian coordinate system as a conventional method. Therefore, whole dynamic equations of a railway vehicle are derived by combining wheelset dynamic equations and dynamic equations of railway vehicle bodies. Constraint equations and constraint Jacobians are newly derived for the track coordinate system. A process for numerical analysis is suggested for the derived dynamic and constraint equations of a railway vehicle. The proposed dynamic analysis of a railway vehicle is validated by comparison against results obtained from VI-RAIL analysis.

Experimental Study on Characteristics of Deformation for Concrete Track on Railway Bridge Deck End induced by Bridge End Rotation (철도교량 단부 회전에 따른 콘크리트 궤도의 변형특성에 관한 실험적 연구)

  • Lim, Jongil;Song, Sunok;Choi, Jungyoul;Park, Yonggul
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.3
    • /
    • pp.217-225
    • /
    • 2013
  • In this study, by considering the rail fastening support distance and the distance between the bridge and the abutment, the behavior of concrete track installed on a railway bridge end deck and the bridge end rotation were analyzed. In order to analyze the track-bridge interaction, bridge and abutment specimens with concrete track structures were designed and used in laboratory testing. At a constant fastening support distance, an increase in the bridge end rotation caused an increase in the displacement of the rail. Therefore, the displacement of the rail directly affects the rail and clip stress. Further, it is inferred that the results of multiple regression analysis obtained using measured data such as angle of bridge end rotation and fastening support distance can be used to predict the track-bridge interaction forces acting on concrete track installed on railway bridge deck ends.

The Reduction of Structure-borne Noise in an Elevated Station(Changdong Station) of Seoul Metro Line No. $1\sim4$ (서울메트로 $1\sim4$호선 고가역(창동역) 고체소음 저감 사례)

  • Kong, Sun-Yong;Oh, Hee-Wan;Kim, Sang-Jin
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.438-443
    • /
    • 2007
  • In the recent railway construction, the concrete slab track is highlighted as the maintenance-free track and the main stream is moving from ballasted track to concrete slab track. However, in spite of many merits of concrete slab track, the higher noise generated from the concrete slab track is a troublesome question to solve and, by this reason, many studies on noise reduction of concrete slab track are carried out. The railway noise can be classified into the reflection noise emitted from wheel/rail contact and the structure-borne noise transmitted through railway structures. In this presentation, we would like to introduce an example of the successful reduction of structure-borne noise at track retrofitting to maintenance-free concrete slab track in elevated Changdong Station which was built with ballasted track on Rahmen structure.

  • PDF

A Study of Analysis Method for the Track Geometry Measuring Data on High Speed Railway (고속철도 궤도검측 자료 분석기법에 관한 연구)

  • 강기동
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.4
    • /
    • pp.291-295
    • /
    • 2004
  • The Track geometry measuring on High-speed railway is the most important subject for the track construction and track maintenance work. Also the measuring accuracy is so significant part because it provides principle data for the maintenance plan and the assesment of working quality and can control the train speed limitation. From this point of view, it is very important to verify for the track recording coach(EM120) in KNR. According to the result of spectrum analysis, the noise near 1m waveband was found on the track recording data from EM120. So, New filter has been applied to remove the noise form track recording data. and it makes possible to acquire resembling result to real track geometry.

A Study for the Safety Improvement of Track using the Risk Assessment (위험도평가 적용을 통한 궤도시설 안전성 향상에 관한 연구)

  • Lee, Byung-Suk;Yang, Sin-Chu;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1601-1606
    • /
    • 2011
  • The railway system consists of rolling stocks, facilities, electrical system, signaling and operation and so on, organically bound. Recently due to lots of train failures and accidents, especially the derailment related to track irregularity this year, all the people using the train are worried about railway safety and we paved the way for letting them knowing that all components of railway system are so important. As a result, most of developed countries operating railway have used to risk assessment methods about safety management to prevent railroad accidents in advance. The purpose of this paper is to find out how to closely apply to track field for risk assessment methods. Because there is no case to apply to and we're not interested in yet, despite of importance of track, in situations of higher train speed. Therefore, in this study we're going to investigate risk assessment methods and compare enire railway system with track system, eventually we want us try to present to safety management conditions necessary and secure safety improvement in track field.

  • PDF