• 제목/요약/키워드: Railway signaling

검색결과 258건 처리시간 0.043초

KTX 안전운행 확보를 위한 ATP시스템 설치 최적화 방안 (A study on the optimum ATP installation for KTX safety running)

  • 유병관;김대식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1388-1397
    • /
    • 2007
  • In order to install ATP system for KTX safety running, a study has been done to examine measures to ensure the interface between KTX and ATP system. Although onboard signaling system is efficient and has been verified both at home and abroad, alternatives for optimum installation shall be adopted so as to show designated performance taking into account the given peripheral device. A solution to interface between beacon and onboard system shall be presented especially for the KTX, which runs on both high speed and conventional line (ATP-ATS). Furthermore, the method for controlling the braking process and recorder shall be studied.

  • PDF

고속 및 일반철도용 연동장치와 선로전환기간 효율적 인터페이스 방안 연구 (A Study on Efficient Interface between Point Machine and Interlocking System for High Speed and Conventional Railroad)

  • 이재호;강신주
    • 전기학회논문지
    • /
    • 제63권12호
    • /
    • pp.1747-1751
    • /
    • 2014
  • Interlocking system along with point machine for efficient route control secures safety of train operation by interchanging information each other. However, various types of interlocking system and point machine operating on bender specific interface bring obstacles to effective maintenance and safety. In this paper, we have investigated on interface methods to suggest standard interface module applicable to various operating system

철도신호시스템 상호간 인터페이스를 위한 데이타링크 프로토콜 성능분석 (Performance Analysis of Data Link Protocol for Railway Signaling Interface)

  • 황종규;이재호;강문호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 D
    • /
    • pp.2800-2802
    • /
    • 2002
  • 본 연구는 철도신호 장치간 인터페이스를 위한 데이터 링크제어의 성능분석을 위하여 Matlab/simulink을 이용한 시뮬레이션과 시뮬레이터 개발을 목표로 하였다. 이를 위해 Simulink 윈도우상의 데이터 링크제어 시스템 화면에서 사용자 인터페이스 블록을 통해 통신 파라미터들을 선택하여 시뮬레이션을 행할 수 있는 시뮬레이션 툴과, Matlab이 제공하는 RS232통신용 API 기능을 이용하여 철도 신호장치간의 통신 프로토콜을 PC상에서 모사할 수 있는 프로토타입 시뮬레이터를 개발하였다.

  • PDF

통신에 의한 신호시스템의 안전성 확보에 대한 연구 (The Study of Improve Safety for Signaling System using Communication)

  • 백종현;한성호;안태기;온정근
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1999년도 춘계학술대회 논문집
    • /
    • pp.307-314
    • /
    • 1999
  • The potential use of ranging sensors for reducing the occurrence of accidents in real environment is explored by many companies and laboratories. Most of the sensors under investigation utilize the FMCW(Frequency Modulated Continuous Wave) waveforms. The automotive environment presents to the FMCW radar sensor a multitude of moving and fixed targets and the sensor must detect and track only the targets which may pose a threat of collision or passengers accident. The sensor must function accurately in the presence of background echoes generated by moving and fixed targets, ground reflections, atmospheric noises, including rains, fog, and, snow and noise generated within the receiver. False detection of the desired target in this environment may issue false alarms. That may be dangerous to the passenger and the vehicle. A high false alarm rate is totally unacceptable. The false alarm mechanism consists of noise peaks, crossing the threshold and the undesired response of the system to off lane targets which are not potentially hazardous to the radar equipped vehicle. This paper presents an improve technique safety performance for driver-less operation using FMCW radar sensors.

  • PDF

KTX 안전장치의 운영 최적화에 관한 연구 (차상신호 및 속도계장치를 중심으로) (A Study on the Operating Optimum of Safety System in KTX)

  • 유병관;김대식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1922-1929
    • /
    • 2008
  • In order to install ATP system for KTX safety running, a study has been done to examine measures to ensure the interface between KTX and ATP system. Although onboard signaling system is efficient and has been verified both at home and abroad, alternatives for optimum installation shall be adopted so as to show designated performance taking into account the given peripheral device. A solution to interface between beacon and onboard system shall be presented especially for the KTX, which runs on both high speed and conventional line (ATP-ATS). Furthermore, the method for controlling the braking process and recorder shall be studied.

  • PDF

신호설비 정기검사 절차서 작성에 대한 보고 (A report on the preparation of signaling equipment procedures for the periodic inspection)

  • 고양옥;서문석
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.623-629
    • /
    • 2008
  • A periodic inspection for facilities in operation is an inspection that is carried out regularly, in which inspection cycles are drawn up, and it is a series of tests to determine if the condition of all the equipment is maintained, and to identify whether they are to be used or replaced. Reliability should be enhanced, without a breakdown, by preliminary inspection and regular checks for each equipment item installed for equipment maintenance. It was noticed that there was a slight difference for the same facility, and for each organization in terms of inspection cycles and methods while preparing procedures of periodic inspection checklist, inspection methods and cycles for a related organization. Therefore, this paper reviews the optimal methods of inspection procedures for Seoul Metro.

  • PDF

신분당선 CBTC구간과 분당선 ATC구간의 절체운전에 대한 고찰 (Guideline for Preparation of Manuscript for Proceedings)

  • 장광동;차기주;강덕원;이종성
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.2017-2022
    • /
    • 2009
  • Sinbundang Line(SBL) Train moves the transition zone where is located between Jeongja station and Migeum station switched over from Communication Based Train Control (CBTC) system area to Automatic Train Control (ATC) system area and viceversa. The SBL train to move the between SBL and Bundang Line is needed to install the Specific Transmission Module (STM) on SBL Line for interface with Bundang Line; STM receives from speed code from Bundang Line. So we suggested the method to ensure mutual compatibility and reliability for train operation on each other signaling system.

  • PDF

I/O FSM으로 명세화된 철도 신호제어용 프로토콜 검정에 관한 연구 (A Study on Verification of Rail Signal Control Protocol specified in I/O FSM)

  • 서미선;황종규;이재호;김성운
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.1241-1246
    • /
    • 2004
  • The verification confirms a correspondence between requirements and a specification before implementing. The problem in the formal method verifying a protocol specification using model checking is that the protocol behaviors must be always specified in L TS(Label Transition System). But if Region Automata is applied to the model checking, it is enable to verify whether properties are true on specification specified in I/O FSM(Input/Output Finite State Machine) as well as LTS. In this paper, we verify the correctness of rail signal control protocol type 1 specified in I/O FSM by using model checking method and region automata. This removes many errors and ambiguities of an informal method used in the past and saves down expenditures and times required in the protocol development. Therefore it is expected that there will be an increase in safety, reliability and efficiency in terms of the maintenance of the signaling system by using the proposed verification methods.

  • PDF

바이탈 열차제어시스템의 리스크 분석 및 헤저드 제어방법 (Risk Analysis and Hazard Control Process for Vital Train Control Systems)

  • 황종규;조현정;윤용기
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2006년도 하계종합학술대회
    • /
    • pp.951-952
    • /
    • 2006
  • Railway signaling systems are so vital to ensure the safe operation of railroad and the assurance and demonstration of the safety is so important. The safety management process shall consist of a number of phases and activities, which are linked to form the safety life-cycle. The basic processes of safety management and safety activity throughout the lifecycle are 'risk analysis' and 'hazard control'. The safety managements and activities for the two kinds of aspects are implemented throughout the whole steps of system lifecycle. The risk analyses and hazard controls like those are needed, these activities have to be carried out through the whole of system lifecycle.

  • PDF

A dP/dV Feedback-Controlled MPPT Method for Photovoltaic Power System Using II-SEPIC

  • Park, Han-Eol;Song, Joong-Ho
    • Journal of Power Electronics
    • /
    • 제9권4호
    • /
    • pp.604-611
    • /
    • 2009
  • A dP/dV feedback-controlled MPPT (Maximum Power Point Tracking) method for photovoltaic power systems using II-SEPIC (Isolated Inverse-SEPIC; Single Ended Primary Inductance Converter) is presented and a current-mode dP/dV feedback-controlled MPPT method is devised to apply for the PV power converter system. A control strategy for the current-mode dP/dV feedback control system is developed in this paper and the proposed MPPT shows relatively satisfactory dynamics against rapidly changing insolation conditions. In order to verify the validity and effectiveness of the proposed method, simulations and experiments of the PV power system using II-SEPlC converter are performed. These simulation and experiment results show that the proposed method enables the PV power system to extract maximum power from the photovoltaic module against the solar insolation variation.