1 |
Jong-Hyen Baek, Yong-Kyu Kim, Ducko Shin, Kang-mi Lee, 'The Localized Development of Single Phase MJ81 Switch Point Machine", Proceedings of 2009 Summer Conference of the Korean Institute of Electrical Engineering, pp 1181-1182, 2009
과학기술학회마을
|
2 |
J.Y. Park, W. S. Hong, B. R. Chen, Railway Signaling Engineering, Dong-il press, 2009
|
3 |
KOREA RAIL NETWORK AUTHORITY, Railway Design Manual: Signaling Parts, pp.4-1-61, 7-1-101, 2004
|
4 |
J. Y. Park, "Study on performance improvement of electric-point machine monitoring system", Journal of The Korea Academia-Industrial cooperation Society, vo. 11, no. 11, pp.4509-4514, 2010
과학기술학회마을
DOI
ScienceOn
|
5 |
Samsung SDS, Overview of SIWES Point Machine Installation for Gyeongbu High-speed Railway Project Phase II, 2011
|
6 |
KRRI, Report for establish measurement to prevent disorder Point Machine of Gyeongbu High-speed Railway Project Phase II, 2011
|
7 |
KOREAN RAILWAY STANDARDS, KRS SG 0015-13(R) (Electronic Interlocking Device), 2013
|
8 |
Hyukshin Electric Co., Ltd., Technical Report of Electronic Interlocking System, 2010
|
9 |
Yookyuong Control Co., Ltd, Technical Report of Electronic Interlocking System, 2011
|
10 |
Korean Standard, KRS SG 0026(NS type point machine), 2006
|
11 |
Korean Standard, KRS SG 0027(MJ81 type point machine), 2006
|