• Title/Summary/Keyword: Railway services system

Search Result 117, Processing Time 0.032 seconds

Development of Integrated Service System based RFID for train passenger (RFID 기반의 열차 승객용 통합 서비스 시스템 구현)

  • Kim, Hae-sung;Seo, Ji-hwan;Lee, Su-won;Shim, Dong-eun;Kim, Bum-jun;Lee, Jae-Hyun;Shin, Dong-suk
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2009.10a
    • /
    • pp.347-350
    • /
    • 2009
  • The opening of High-speed Rail provides convenience to move a long distance quickly, and the passengers of high-speed railway have been steadily increasing each year. Since the high-speed rail is far more expensive than other transportation, providing high quality service over just the high speed is required. Accordingly, much effort is made to improve service quality. However these services have been focused on general passengers so we should introduce a new service system to meet personal preferences of passengers. Therefore, in this paper, we introduce integrated railway service systems to provide service which follows the individual needs of passengers and is based on RFIDs (Radio Frequency Identification).

  • PDF

A Study on the Optimum Operating Cost of Driveless LRT System (무인운전 경량전철의 최적 운영비 산출에 대한 연구)

  • Chung, Su-Young;Lee, Jong-Seong;Cho, Jin-Hwan;Ahn, Young-Hwan;Baek, Seung-Heon
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.2051-2057
    • /
    • 2008
  • This paper is a feasibility study on the calculation of operating cost in regards to the overall operation following the completion of a number of LRT lines currently in progress. Owing to the absence of operating experience in driveless LRT system at home, the difficulties lie in the assumption of the optimal operating budget applying domestic real situation. Nevertheless, with 34 years of accumulated operating experience in heavy rail transit system, Seoul Metro, the nation's biggest urban rail transit operator, performs O&M consultancy services for several on-going projects along with every effort to acquire know-how where the appropriateness of the cost estimation as a required deliverable is reviewed and a more efficient way is provided. The main focus of this study is to seek a method to calculate the optimal amount of operating expenses as well as a cost-effective alternative for possible weaknesses from the standpoint of the operator. The body of this paper discusses the five issues such as personnel cost, overhead, maintenance cost, additional purchase price, alternative investment fee from a more macroscopic point of view, and the conclusion deals with the adequacy of the reason for selection of institutions with various operating know-how.

  • PDF

A Study on the Development of Capacitor Exchange Type GDU of Propulsion Control Device of Electric Railway Vehicle Capable of Life Diagnosis (수명진단이 가능한 전기철도차량 추진제어장치의 커패시터 교환 형 GDU 개발에 관한 연구)

  • Kim, Sung Joon;Chae, Eun Kyung;Kang, Jeong Won
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.8 no.7
    • /
    • pp.475-484
    • /
    • 2018
  • The propulsion control device of an electric railway vehicle is a key main component corresponding to an engine of an automobile, and a device for controlling this is a device called a GDU (Gate Drive Unit). Also, when the frequency of failure of the propulsion control system was analyzed, the nonconformity ratio of GDU was the highest. GDU was not able to access core technologies due to the introduction of foreign products, and there were general problems with overall maintenance activities due to discontinuation of GDU of the manufacturer. The GDU has reached the end of its life with 23 to 14 years of long-term use.In order to solve these problems, this study was designed to identify the proper life span by analyzing compatible GDU's acquisition and failure, and to improve the existing system of maintenance focusing on health inspection. Maintenance of the components with a short life span compared to the entire service life is essential. Most foreign parts introduced at the beginning of the construction are not replaced due to technical problems or long-term operation. However, due to the characteristics of railway vehicles with a long life span of more than 25 years, it is necessary to maintain them for a long period of time. The study should be more concrete and empirical. The replacement type GDU of capacitors was able to easily measure the life of the capacitance by removing the capacitor modules, measure the life span of each unit test, and accurately perform preventive maintenance of the capacitor.

Development of Service Evaluation Criteria in Tramway Operation (트램 운영 서비스 평가 기준 개발)

  • Chung, Sung Bong;Kim, Dong Sun;Choi, Ji Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.4
    • /
    • pp.551-559
    • /
    • 2019
  • Since 2000, many local governments have been trying to introduce trams because of the government's failure to adopt environment-friendly policies and light rail. However, there is no service evaluation system that can maintain and enhance tram users' convenience, safety, and comfort during operation. In addition, the tram characteristics are not reflected in the application of the evaluation system of "management and service evaluation for public transportation operators" which is being implemented to railway operators or bus transportation operators. The purpose of this study is to develop the evaluation criteria of operating service according to tram operation model. First, we reviewed cases related to the evaluation of operating services in roads, buses, railways, and airways. And the evaluation criteria and the evaluation items are presented. This study is expected to help to secure and improve operational service in the operation phase of the tram that will be introduced in the future.

Method for increasing rail operation capacity of capital high speed rail with expanding the high speed railway service (고속철도 서비스 확대를 위한 수도권 고속철도 확충 방안 고찰)

  • Roh, Beung-Guk;Kim, Young-Bea;Shin, Dong-Won
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1254-1268
    • /
    • 2009
  • In 1998, because of the economic crisis called IMF Crisis in Korea, Kyungbu high speed railway project could run by modifying the original plan to open it as a 1st phase only by utilizing the existing railway lines from Seoul to Siheung and the other one from Daegu to Pusan. The modified plan includes that the line from Daegu to Pusan will be constructed as a second phase in next time. Starting railway operation with the changed plan, the combined application operation of high speed rail, passenger rail and freight rail was caused partly from Seoul to Siheung to run into capital area. As a result, the opinion for additional railway line construction is insisted continuously because the operation volume of passenger rail was forced to be reduced, the service quality of it was decreased and it became difficult to add new high speed services. Moreover, with regard to Honam high speed rail, the new construction plan of station in Kangnam metro area as a basement station for starting from Suseo was changed to the plan of turning out at Osong because of the economic effectiveness and this kept resident people in Kangnam metro area and southern Kyungki area unable to get the opportunity of high speed rail service benefit. After beginning of Kyungbu high speed railway operation, national transportation system developments are focused on high speed rail, and when the second phase construction of Kyungbu high speed rail, beginning operation of Kyungjeon line, Jeolla line double track construction, Honam high speed rail in 2014, is completed, the demand for high speed rail will be increased and it is unavoidable to make Kwangmyung station as a basement station and to reduce the number of passenger rail operation. At this moment, it is valuable to consider adding the railway line capacity in capital area to improve the transferring service for citizen who live in area without Kyungbu high speed rail station and to expand the service area from Kangbuk to Kangnam and southern Kyungki area. Accordingly, in this paper, the effective rail operation method, facility plan and the other issue to be reviewed for increasing capital high speed railway lines will be mentioned.

  • PDF

Obstacle of a train crew & Vehicle Operation For Improvement Program In Seoul metro (서울메트로 승무.차량 운전장애에 대한 개선방안)

  • Lee, Tai-Sik;Park, Min-Seo;Bae, Woo-Byeng;Kim, Dong-Seok;Kim, Jun-Taek
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1168-1173
    • /
    • 2007
  • The Seoul Subway is one of the most heavily used Subway System in the world. It provides reliable transportation services, conveys nearly 4 million Passengers across 117 subway stations with a length of 134.9 Km. Over the years the safety for the Subway has been a major concern, trains going off the track, equipment failure, careless operation, Signal failure are increasing day by day. In a Recent Public opinion 40% said the causes to above facts are Vehicle breakdown because of Operators, Old rail defect, Quality of material. 20% of the opinion said the obstacles were because of Operation, crew carelessness, negligence in signal operation. In case of any accident the crew members cannot resolve the issue on site (Aid insufficiency), because of lack of knowledge and carelessness. The main obstacles for Subway are vehicle breakdown, Electric equipment failure, Signal Equipment failure, and Crew carelessness. This paper aims to provide major problems which are needed to be solved as quickly as possible for citizen's safety for a comfortable subway system making a comfortable ride and providing better service gradually.

  • PDF

Analysis of Fire Accidents on Power Line for DC Electric Traction Vehicles (전기철도 전원계통에서의 화재 사고사례 분석)

  • Song, Jae-Yong;Cho, Young-Jin;Kim, Jin-Pyo;Park, Nam-Kyu;Kil, Gyung-Suk
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.241-247
    • /
    • 2008
  • This paper describes a cause of fire accidents on power system for DC electric traction vehicles. We investigated fire scene of power line for DC electric traction vehicles. From analysis results, the cause of fire on power line turned out line to ground fault between a feeder of electric power services(pantagraph) and DC electric traction vehicle roof. Fire accidents of DC electric traction vehicles be assumed that electric sparks had been produced between the pantagraph and the power line conductor by repetitively making contact and separation, maybe if some material like branches get in between connecting rod it make progress line to ground fault. ZnO arresters are widely used to protect DC electric traction vehicles against overvoltages caused by lightning or switching surges. However, the arresters are deteriorated by commercial frequency overvoltages and/or lightning one. Deteriorated arresters could lead power failures, such as line to ground fault by a thermal runaway resulting from the increases in leakage current even in a nominal power system voltage. The power failures, such as line to ground fault would be causative of the fire accidents.

  • PDF

Analysis of Effect of Infrastructure Property on an Apartment Housing Price - Focused on Urban Subway System in Seoul Metropolitan Area - (사회기반시설 이용특성에 따른 공동주택의 가격 영향에 관한 연구 - 수도권 도시철도를 중심으로 -)

  • Bae, Sangyoung;Lee, Sangyoub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.27-35
    • /
    • 2021
  • The study intends to identify the effects of infrastructure property on an apartment house by analyzing the price variation affected by factors constituting the quality of the transit services of each individual station in urban railway system based on hedonic price model. The research findings indicate that the prices depending on the transit users have increased from 7.8% to 12.2% in Seoul and decreased from 6.1% to 12.9% in Gyeonggi, which implies that a lower number of transfer users has a positive effect on housing prices in Seoul unlike Gyeonggi. It also is noteworthy that the distance to the urban railway station had a negative effect on housing prices in Seoul and positive effect in Gyeonggi. Taking these results together, in Seoul, the increase in the number of transit users had a negative effect on neighborhood housing prices. When analyzed by segments, however, an additional negative effect was observed only in the apartments located within the radius of 100 meters. It is also found that the impact of transit users varies according to the regional characteristics, such as the density of commercial facilities and the population density, and the spatial extent of negative effect also showed regional differences. These results provide implications for the planning of new stations, new cities, and land use of existing areas around stations.

RF Characteristics Analysis of Smart Braille Block for Location Identification in Subway Station (지하 철도역사에서 위치확인을 위한 스마트 점자블럭의 RF 특성 분석)

  • Hwng, Jong-Gyu;Kim, Kyung-Hee;An, Tae-Ki
    • Journal of IKEEE
    • /
    • v.24 no.2
    • /
    • pp.378-384
    • /
    • 2020
  • The location information of the people or mover is essential for supporting various smart mobility services in railway stations which are mostly underground. For this purpose, a smart braille block is proposed to identify the location of the mover of the people. In this paper, the frequency characteristics of each material of the upper and lower parts of the braille block are analyzed to examine the appropriate materials for railway history. In addition, the guidelines for actual manufacturing were derived by analyzing the separation distance between two RF sensors in the smart braille block. As a result of analysis through the characteristic analysis in this paper, after selecting the material suitable for the construction site when the smart braille block is applied, the performance change of the RF system, especially the antenna that greatly influences the RF performance, must be reviewed in advance. It seems to have to be applied after checking through.

Access Delay Characteristics of Wi-Fi Network According to User Increase in Subway Section (지하철 구간에서 이용객 증가에 따른 Wi-Fi 접속 지연 특성)

  • Koh, Seoung-chon;Choi, Kyu-Hyoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.5
    • /
    • pp.3455-3461
    • /
    • 2015
  • LTE and Wi-Fi networks provide wireless communication services to passengers in subway where the number of network access fluctuates according to passenger movement. While the number of network access increase, LTE can provide stable communication service but Wi-Fi suffers temporal access delay to network. This paper analyzes the increase in access delay of Wi-Fi network according to increasing user in subway section by making mathematical modeling of Wi-Fi network and simulation study. The access delay characteristics of Wi-Fi network is measured along an subway line and the results are compared to the theoretical study. These results can be applied to the connection method to build an efficient network structure between LTE and Wi-Fi interworking network and the future introduction of LTE-R.