This paper evaluates the performance of transit assignment algorithms for urban rail networks. The accuracy of the algorithms is essential not just for travel forecasting but also for the area of applications such as the assessment of road vulnerability and the fare adjustments between train operating companies. Nonetheless, the suitability and caveats for the series of computational steps have not yet been much discussed. This study thus considers the characteristics that are appropriate for investigating Seoul rail travelers using three representative transit assignment algorithms: the optimal strategy algorithm, route choice algorithms, and the Dial's algorithm. Both the theoretical foundation and the empirical performance are examined. The results demonstrate that the Dial's algorithm is superior in terms of the theoretical soundness and the computational efficiency.
The Light Rail Transit (LRT) System which has medium transport capacity between subway and bus(5,000-25,000 persons per hour) is the most advanced transportation system. It has many benefits, cheap construction, operational costs through driverless and flexible route planning. Also, the rubber tired AGT (K-AGT) of various LRT has a rubber wheels and side guide. The side guide type has an many advantages. but occur a vibration and friction noise through contact between guide rail and wheel. Most of point that decreased comport is vibration thorough the guide contact. In this paper, It is purpose to improve the maximum running speed of rubber tired AGT localization bogie which is currently developed from 70km/h to 80km/h. To satisfy comport index of railway vehicle that is required in performance test. we examined coefficient of bogie suspension which is designed.
KSCE Journal of Civil and Environmental Engineering Research
/
v.39
no.6
/
pp.853-858
/
2019
One of the methods which can enhance the efficiency of railroad network is construction of interconnection branch line for several route to share one railway. In Korea, this method already has been implemented or excuted as project level. This study suggests a network design model and a solution algorithm to choice most proper site to construction it and determine the priority of branch lines which can be considered in planning level, not project level. The model is a non-linear optimization program which minimize total cost-construction cost, operating cost and passengers' travel cost. The decision variables are a binary variable to explain whether construction or not and its direction and a integer variable of the frequencies of travel routes. The solution algorithm-problem solution and route choice and also the result of implementation for example network are suggested. This result can be more advanced after application in real network and calibration of parameters.
Long-term national railway building comprehensive review of the proposal had 100 in railway history, railway rail network plan. Planning routes for establishing a plan, but, considering the rail network, the plan was that could with the very important meaning in the What more economical route considering the costs and benefits of building a rail network under budget constraints, went through the process of background lines of business unit interval expenses to adopt a business unit interval. Especially in building the railway network, as well as the road plan was to reflect in order to build for the future railway facilities was secured examine the possibility of possible budget commitment. Budget of securing the transportation tax, gasoline tax, and other transportation facilities in order to secure and commit the current funding approach and Review Bodu possible budget scenarios based on it written. Was also enforce rail system built in reviewing the demand more than anything that can take advantage of the railway distance by railway and the merits of the competition means to compete in the form of the assumed situation. The rail network deployment plan, considering this was discussed, based on the results of the plan to establish the first annual or period of the plan change was based on the budget that was unknown.
Kim, Jung-Hyun;Kim, Sang-Hoon;Shin, Han-Chul;Lee, Se-Hoon
Proceedings of the Korean Society of Computer Information Conference
/
2011.01a
/
pp.107-108
/
2011
Since the development of railway technology, the current urban Railway the first train line in the country for safe operation control automatic/unattended operation, automatic train operation equipment available (ATO) on time and reliable operation has introduced. ATO Automatic operation controlled by the value (Target velocity) and the feedback value (Actual velocity) by the error between the backing and braking of the train by repeated low energy efficiency. In this paper, given a fixed distance stations between time operation with minimal energy in the driving characteristics and driving trains are modeled. Therefore, in line 5 real route time sectional drive straight sections for experimental data analysis / draft Section / curved and section of the train on that line is selected according to the changing driving patterns to minimize the energy optimal driving patterns were presented.
As of July 1999, i,185 lomocotives(excluding metropolitan area electric locomotives) are in Korean National Railroad(KNR). With this limited number of resources assigning locomotives to each trains of timetable is very important in the entire railway management point of view because schedule can be regarded as goods in transportation industry. On a simple rail network, it is rather easier to assign proper locomotives to trains with the experience of operating experts and get optimal assignment solution. However, as the network is getting bigger and complicated, the number of trains and corresponding locomotives will be dramatically increased to rover all the demands required to service all of the trains in timetable. There will be also numerous operational constraints to be considered. Assigning proper locomotives to trains and building optimal cyclic rotations of locomotive routings will result in increasing efficiency of schedule and giving a guarantee of more profit. The purpose of this study is two fold: (1) we consider a planning-level locomotive scheduling problem with the objective of minimizing the wasting cost under various practical constraints and (2) development of implementation prototype program of its assigning result. Not like other countries, i.e. Canada, Sweden, Korean railroad operates on n daily schedule basis. The objective is to find optimal assignment of locomotives of different types to each trains, which minimize the wasting cost. This problem is defined on a planning stage and therefore, does not consider operational constraints such as maintenance and emergency cases. Due to the large scale of the problem size and complexity, we approach with heuristic methods and column generation to find optimal solution. The locomotive scheduling prototype consists of several modules including database, optimization engine and diagram generator. The optimization engine solves MIP model and provides an optimal locomotive schedule using specified optimization algorithms. A cyclic locomotive route diagram can be generated using this optimal schedule through the diagram generator.
KSCE Journal of Civil and Environmental Engineering Research
/
v.41
no.1
/
pp.75-83
/
2021
Over-urbanization has contributed to the increase in traffic problems. This makes the need for effective road planning and design more important than ever. I have been able to learn how to build a new road, and how to use it. However, in spite of the importance of good road planning, there are no systematic standards or methods for calculating traffic volume on railroad routes. Therefore, in this study, to strengthen the competitiveness of railroads, the concept of line capacity is introduced to railroads, and a clear standard and method for calculating railroad line capacity are presented. Based on the results, the line capacity of main railway lines for domestic railways was calculated. By applying the method of calculating the line capacity presented in this study, the capacity of existing railway lines and newly expanded routes can be calculated. It is expected that our findings will be able to provide systematic standards that can be applied to yield a more effective investment and design planning stage; the findings will also help improve the efficiency of railroad operation.
Transactions of the Korean Society for Noise and Vibration Engineering
/
v.22
no.4
/
pp.307-317
/
2012
The LRT(light rail transit) system, which has medium transport capacity between subway and bus is an advanced transportation system. It has many benefits like chap construction and operational cost down through driverless and flexible route planning. The rubber tired AGT(K-AGT) is a kind of LRT, which has rubber wheels and side guides. The side guides has many advantages, but brings vibration and noise problems from the friction between the guide rail and the wheels. This is the major source for the of passengers' discomfort. The purpose of this paper is to analyze dynamic characteries and running stability of the rubber tired AGT localization bogie if the AGT's speed is increased from 70 km/h to 80 km/h. The current design parameters of bogie suspension, as it is designed, was examined to satisfy the comfort index of the railway vehicle in performance test.
The technology for the multi-dimensional terrain perspective view can be used as an important factors in planning and designing for the various construction projects. In this study, the stereo image perspective view has been generated for the multi-dimension analysis by combining useful digital map and remotely sensed satellite images. In the course of experimenting with the multi-dimensional topography generated by the combination of the front-projected image by the precise GCP and DEM from the contour line, the technology has been developed to offer the multi-dimensional access to the potential construction sites from the nearby main roads. This stereo image bird's eye view has made it possible to make multi-dimensional analysis on the terrain, which provides real time virtual access to the designated construction sites and will be a versatile application for development planning and construction projects.
In accordance with low carbon and green growth paradigm, a subway is one of major public transit systems for resolving traffic congestion and decreasing traffic accidents. In addition, as subway networks expand, passengers' travel pattern in the subway network change and consequently affect the urban structure. Generally, new subway route has been planned and developed, mainly considering a travel demand forecast. However, it is desired to conduct an empirical analysis on the forecast model regarding change of travel accessibility and passenger demand pattern according to new subway line. Therefore, in this paper, an alternative method, developed based upon a spatial syntax model, is proposed for evaluating new subway route in terms of passenger's mobility and network accessibility. In a case study, we constructed subway network data, mainly targeting the no 9 subway line opened in 2009. With an axial-map analysis, we calculated spatial characteristics to describe topological movement interface. We then analyzed actual modal shift and change on demand of passengers through the number of subway passenger between subway stations and the number of passenger according to comparative bus line from Smart Card to validate suggested methods. Results show that the proposed method provides quantitative means of visualizing passenger flow in subway route planning and of analyzing the time-space characteristics of network. Also, it is expected that the proposed method can be utilized for predicting a passengers' pattern and its impact on public transportation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.