The high speed rolling stock system considerably belongs to a special industry which requires large-scale investment cost but the recovery term is long. Therefore, to guarantee risk and possibility of technological success in initial investment, tools concerned with various expecting methods like life cycle costs analysis and credibility management are used. In view of this characteristics, the cases on cost structure for HSR RS previously invested should be studied and the method to appropriately allocate the life cycle of each sub-system like arrangement unit, electric device, braking device, door and car body should be realized. Moreover, the environmental aspects of main manufacturer and parts supplier can be checked. This study, through the case study for HSR cost structure in introduction and operational stage of KTX, aims to seek for the method to adapt to environmental changes like EU railway industry of which object is to acquire global market competitiveness by integrating manufacturing and operation of RS and the regulation and operation of IRIS which is performed in Europe.
This paper is studied on earth network configuration when common earth is applied to electrified railway system. And the permitted capacity of buried earth cable used for configuring common earth network and application plan of existing individual earth system when common em1:h network is applied to existing electrification line improvement are studied. For this, the configuration of common earth network is examined according to the SNCF regulation, and the interface between common earth and individual earth is analysed on the basis of the existing track circuit used in electrified line.
Transactions of the Korean Society for Noise and Vibration Engineering
/
v.20
no.10
/
pp.968-975
/
2010
The high interest for the ground vibrations which is caused by the train service is risen. When the trains are passed, a serious force is applied to ground and the caused vibration is propagated to the area of the building by the ground and rocks. This vibration comes to feel in the residents with the direct vibration, it is radiated in sound. The caused vibration and radiated sound affect the human's life, and this vibration brings about the operation interruption of the equipment which is sensitive to the vibration, or will bring about the structural damage of the building. In this study, the effect of the vibrations caused by the passing trains on the railway station and buildings is investigated by vibration measurement. Indoor and outdoor measurement is carried out by each trains.
An automatic train operation(ATO) system executes the operation of constant speed travelling and fixed point parking by using microprocessors instead of drivers manual operation. This paper describes the mathematical model for the train considering unknown disturbances which consist of start resistance, travelling resistance, slope resistance, curve resistance, and so on. The speed controller of ATO system is designed by considering the disturbances. The simulation is executed to verify the speed control and fixed point parking performance and to compare its performance with that of a PID-type ATO control system under disturbances. Simulation results show that the control performance of gain scheduled control scheme fur ATO system is better than that of the conventional PID controller.
In this paper, I explain the situations and problems which are focused on the rail freight system. We have a many problems, which have been showed the long freight logistics time, and inadequate fare system. And rail freight system does not have a efficient marketing system, and unit load system. Therefore rail freight has been decreased modal share, which is estimated from 9.65% in 1995 to 6.25% in 2001(ton base). Recently, EU nations and America rail freight system reveals a good outcome, which keeps the balance in the black. The main factors which go into the black, is the enlargement the investment in rail freight and efficient management focusing on the unit load system, fare system, and personnel management. I suggest the several improvement ways, which will be helpful to advance the rail freight system. Fistly, I suggest the speed up the freight rail and efficient fare system. Secondly, I propose the unit load system and the regulation the truck focusing on curtailment of the social cost. Lastly, I make an overture of establishment the comprehensive logistics system.
Pressure change inside cabin as well as in tunnel has been calculated to assess the passenger pressure comfort of high-speed train. $C-STA^{TM}$, a CFD program based on axi-symmetric Navier-Stokes equation and Roe's FDS has been used to simulate the pressure change in tunnel during a high-speed train passing through it. To present the relative motion between the train and the tunnel, a modified patched grid scheme based on the structured grid system has been employed. The simulation program has been validated by comparing the simulation results with field measurements. Extensive parametric study has been conducted for various train speed, tunnel cross-sectional area and tunnel length to the pressure change in cabin. KTX-Sancheon(KTX2) high-speed train has been chosen for simulation and the train speed have been varied from 200 km/h to 375 km/h. The tunnel length has been varied from 300 m to 7.5 km and tunnel area from $50m^2$ to $120m^2$. Total 504 simulations have been conducted varying the parameters. Based on the database produced from the parametric simulations, minimum tunnel cross-sectional area has been surveyed for various train speeds based on Korean regulation on pressure change in cabin.
This paper examines the outcomes and tasks of U rail privatization especially focusing on the rail safety. Earlier research which focused on the rail safety had little knowledge of the explanations for recent changes of safety scheme. Moreover, they had difficulty making a direct comparison of safety between national rail and the privatized rail. Therefore we are left without a good explanation which has a comprehensive perspective. I attempt to show the outcomes of safety in the rail privatization process and its tasks focusing on the recent fatal accident. This paper argues that the UK's rail safety has a framework which is too complicated with overlapping responsibilities that brought about inefficiency, increasing costs. Especially infrastructure enterprise did not come to play an appropriate role. However, after 2000, the government took charge of setting the strategy for railway safety, and the Office of Rail Regulation covered safety, performance and cost. I explain that these changes present a good opportunity to solve the problem of passing the buck for rail accident. Through the analysis, I find that outcomes of rail privatization in safety are improved comparing the national rail. However, safety performance, for example the collision of structures of cars and looseness of rail should be improved. In future, the problems of fatal accident and a bit of duplicate safe system should be addressed.
Structural integrity of railway vehicles should last for a long period against various and continuous fatigue loadings, and the carbody structures of railway vehicle are manufactured by applying multiform welding types for each material. Since the most of cracks are occurred and proceeded at the vicinity of welding area during the lifetime of carbody structure, the fatigue strength evaluation for welding area of carbody structure should have been carried out. Rotem Company has evaluated lifetime and fatigue strength of carbody structure according to the fatigue analysis based on the international standard and/or inner-official regulation. This study introduces the fatigue analysis method that we have evaluated and calculated the damages for the welding areas of carbody structure under various fatigue loading conditions using cumulative fatigue damage rule(Miner's rule) to verify whether the cumulative damage does exceed unity. This study contains the fatigue test of specimens to derive stress-life relations(S-N curve), sub-modeling analysis and the calculation of cumulative damages under fatigue loading. The fatigue analysis verifies the welding area shall be capable of withstanding under fatigue loading, identifies how critical area shall be selected and presents the principles to be used for design verification.
The Transactions of The Korean Institute of Electrical Engineers
/
v.58
no.11
/
pp.2168-2174
/
2009
Electrical railway system consists of rolling stock, track, signal and streetcar line system. Track circuit system is a vital system due to checking the location of trains. Track circuits are divided by using frequency and isolated electrically. Currently, there is not a regulation for the distance between track circuits using identical frequency. In case of installing additional track circuits in large stations or marshalling yard, the problem which is that the signal is not exactly transmitted to the track circuit occurs due to the mutual interference. In other words, the track circuit properly is not operated on account of wrong induction current by the mutual inductance between track circuits. In this paper, we suggest the electrical model between track circuits and numerically calculate demanded parameters in electrical model. The distance between track circuits satisfying the mutual inductance which does not happen to the mutual interference phenomenon is presented about the distance of track circuit. It is proved by using Matlab and PSpice program as the amplitude of mutual induced current.
The "standard regulation" of the vehicles from "urban transit law" are being adopted to electric multiple unit in domestic. In the standard regulation, there are two types for EMU. One is heavy EMU for Seoul. The other is large EMU for Pusan, Daegu, Gwangju, Daejeon, Incheon. Korea Railroad Research Institute, with the assistance of the Ministry of Land, Transport and Maritime Affairs, "advanced EMU development project" are progressed, and 6th year started at September, one unit to six cars is completed. Now "urban transit vehicle performance tests are on the current progress. The main characteristics of AUTS(Advanced Urban Transit System) are as follows. One inverter control one motor, DDM(Dircet Drive Motor), no driving gear, plug door and steps, mounting and maintenance costs down, passenger convenience improvement. This paper describes the key features the next generation EMU, and performance test results, and the commercial success method of national R&D business.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.