• Title/Summary/Keyword: Railway officer

Search Result 7, Processing Time 0.025 seconds

Impressions of a Guest from Europe on the RailTech Vision Conference

  • Henn, Wolfgang
    • Journal of the Korean Society for Railway
    • /
    • v.2 no.3
    • /
    • pp.5-7
    • /
    • 1999
  • Ten years have passed since my last visit to Korea on the occasion of the International Symposium on High Speed Rail Systems organized by the Korean Transport Institute in October 1989. At that time, it was the objective to introduce the maglev and VHSR (very high speed rail) systems with their different areas of application and to discuss them with local partners against the background of the Seoul-Pusan HSR project. Congratulations on the success of the Centennial seminar. I am much pleased to be invited to the memorable seminar and I would like to express my sincere gratitude to Korean members' hospitality. (omitted)

  • PDF

A Study on Pylon Cable Anchor System in Cable-Stayed Railway Bridge (철도용 사장교의 주탑 케이블 정착부에 관한 연구)

  • Han, Sung-Gwan;Gong, Byung-Seung
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.565-580
    • /
    • 2006
  • Set in constant increase and period current of lively technical development of railroad use and construction of cable stayed bridge railway bridge, one of bridge form of most suitable that think side police officer and the material enemy of bridge that use long rail, is increasing laying stress on the foreign countries. Main tower fixing department of this cable stayed bridge is consisted of main tower flange that support bearing plate, bay ring plate bearing plate, support end rib and diaphragm etc, as stress transmission mechanic that tensility of cable socket into normal force of main tower, and is used this time. These structural elements is very complex the structure and direction of load delivered from socket specially calbe particularly be different, and need FEM analysis that use Thick Shell element for suitable arrangement of mutual stress flowing grasping and absence that follow hereupon because all of the each support plate angle that suport this differ.

  • PDF

A Qualitative Study of the Properties of the Korean Railway during the Japan Colonial Period (일제강점기의 우리나라 철도성격규명에 관한 정성적 연구)

  • Lee, Yong-Sang;Chung, Byung-Hyun
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.3
    • /
    • pp.306-314
    • /
    • 2012
  • At first, the railway was built mainly for military purposes by Japan. After the annexation by Japan, the Korean railway became a means of colonization for Japan but the railway also promoted modernization. As a new transportation medium, it influenced economic, cultural and social development. Until now, research identifying the properties of the railway in the Japanese colonial period has been insufficient. In particular, microscopic study of the influence of the railway on social change has been insufficient. In this study we investigated the properties of Japanese colonial period railway. This paper will help further to clarify the properties of the railway in the Japanese colonial period.

A Study on the Management Innovation of KORAIL and Military Application -Focusing on the Direction of Innovation in the Military Medical Institution-

  • Choi, Dongha;Kang, Wonseok
    • Journal of East Asia Management
    • /
    • v.3 no.2
    • /
    • pp.21-41
    • /
    • 2022
  • This study aims to analyze the characteristics of the management situation of the Korea Railroad Corporation(KORAIL) through the management innovation process of the KORAIL and to suggest its implications for military application. Despite stable demand, the railway passenger industry had the limitation of not being able to abolish deficit routes due to public service obligations. In addition, the launch of the Suseo High-Speed Line has introduced a competitive system, posing a threat to corporate management. KORAIL wanted to overcome this crisis by innovating its management through the utilization of big data, improvement of the freight business, decentralization of demand, the introduction of tourism railroads, and development of station influence areas. By utilizing big data, KORAIL was able to optimize the railway fare system while reducing fixed costs spent on railway maintenance. It also drastically reduced the station of cargo and created a base station to pursue economies of scale. On the other hand, the existing exclusive station system was abolished to solve the chronic saturation of the downtown area, and the railway demand was moved to Gwangmyeong Station and Suwon Station to optimize the passenger supply. In particular, it developed a new business model called the tourism railway by developing the mountain Byeokjin Line, which was a chronic deficit line, and sought to improve liquidity through the development of the station influence area. Such a process of innovation at KORAIL suggests an appropriate direction in seeking ways to innovate the military medical institutions. First of all, the necessity of improving organizational immersion through the development of a personnel structure suitable for the compulsory organization, while expanding the facilities of the division and corps, and reducing the time required for medical treatment and waiting through the establishment of a data-based medical system was suggested. Next, it was also discussed to integrate the National Health Medical College, which received accreditation as a medical facility through the designation of advanced general hospitals and is ultimately under discussion with the Medical Institution. Through this, we hope that the military medical institutions, which are facing various challenges, will overcome existing limitations and be re-lighted as innovative institution that provides comprehensive public health services.

A Study on Plan for Integrating Train Operation System of the Subway (도시철도 열차운영관리시스템의 통합구축 방안에 관한 연구)

  • Hong Yong-Sik;Kim Wang-Kon;Hong Soon-Heum
    • Proceedings of the KSR Conference
    • /
    • 2003.10c
    • /
    • pp.176-182
    • /
    • 2003
  • Subway is working in the construction of station and wayside equipment which was controlled by central and local control operating system for more efficient management. Traffic controlled by functional integration to be interlocked but each part is constructed and operated individually that is not efficient. Therefore, this paper offer to plan of integrating central and local system in one place of each feild. Functional integration plan will help central and local system to link strengthening. This is also offering to integrating central of an officer in command and integrating local of control station and office.

  • PDF

A Study on the measures to improve the difficulties of military personnel in social disasters - Focusing on the case of a railway dispatch - (사회적 재난에 투입된 군 병력들의 고충 개선방안에 관한 연구 -철도파견 사례를 중심으로 -)

  • Yoon, Bo-Yeon;Namgoong, Seung-pil;Park, Sang-Hyuk
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.4
    • /
    • pp.37-41
    • /
    • 2019
  • The following study, as the importance of military role in a national disaster is emerging as a part of comprehensive security, there has been a number of elements of social disaster-related support in support of each type of national disaster aimed to improve the military's role towards comprehensive security but there has been no regular study of this topic. The point of this study is to analyze various aspects and hardships during the mission and improve the effectiveness of future support missions by observing and interviewing the military personnel which substituted the role of train drivers in the Seoul Metro in 2016, when the Korean Railroad Corporation [KORAIL] Workers Union was on strike [72 days] which is the longest period of a national disaster requiring military assistance.

Efficient Application Way of Six Sigma at Railway Construction Project (철도건설사업의 6시그마의 효율적 적용방안)

  • Hong, Sung-Heui;Jung, Sung-Bong
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1251-1262
    • /
    • 2011
  • K-company, being in charge of domestic railway construction and facilities management, got a success rate of 41% with the implement of a improvement scheme by prosecuting of 6 Sigma and the achievement of CTQ (Success criteria : more than 0.5 in achievement of CTQ). It is clear that the factors having an effect on achievement of CTQ are the level of project when pushing forward the project(Big Y and small y according to the scope of the work), the degree of interest of an officer in charge like sponsors, and the continuous feedback toward the implement of a improvement scheme. For improvement CTQ achievement, firstly redefine about a type of project. Secondly, derive small y by Big Y and derives a unit work by small y. Then grouping the unit works and achieve Big Y by performing of every unit work as an executive subject. Thirdly organize a committee of subject selection which is supervised by the general manager. Therefore exhibit staff's leadership, for example motivation, by strong incentives. Lastly, provide ongoing learning and enhance system monitoring about a result management of an betterment execution department.

  • PDF