• Title/Summary/Keyword: Railway line

Search Result 1,611, Processing Time 0.056 seconds

A study on the development of Railway Signal Network using Dual Master Self-Healing Ring scheme (자기치유링 방식을 이용한 이중 마스터 구조의 철도신호용 광네트워크 개발에 관한 연구)

  • 신석균;이재호;류등렬;김정용;이기서
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.535-542
    • /
    • 2002
  • This paper show communication network scheme problem for the railway is solved which were electrical noise and line break in wayside using rerouting communication line, Considering the availability and the maintainability based on the reliability in design of communication networks. At first, Self-Healing Ring algorithm is suggested in that solution which is satisfied with above requirements. And also, in the advanced type, Dual Master scheme is suggested that the problem which is occurred in line break of both main and sub line at the same time can be solved using DMSHR(Dual Master Self Healing Ring). Therefore total reliability in railway system is going to be advanced using DMSHR scheme.

  • PDF

Development of Movable nose crossing turnout on concrete track using Fast Clip (Fast clip을 적용한 콘크리트궤도용 노스가동 분기기 개발)

  • Hwang, Kwang-Ha;Ryou, Ki-Tae;Park, Chun-Bok;Park, Kwang-Ryoun;Yun, Byung-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.287-296
    • /
    • 2011
  • Turnout is a mechanical installation enabling railway trains to be guided from one track to another at a railway junction. A movable nose crossing frog is a device used at a railway turnout to eliminate the gap at the common crossing (High manganese, block, assembly crossing)which can cause impact damage, noise and vibration. Our government has a plan speed up of conventional line to 250km/h semi-high speed. We had already developed flexible turnout with fixed crossing(High manganese) and SFC fastening system can cover in the semi-high speed line In this study is about development of the movable nose crossing turnout available Semi-high speed line on concrete track. This paper describes about geometry, attack angle, bending stress at the nose, switching force, safety of continuous welded long rails. This movable nose crossing turnout is expected greatly increases passing speed of turnout in national railway.

  • PDF

A Study of improving regenerative energy utilization in Urban DC railway systems through sharing substations (철도 변전소 공유를 통한 직류 도시철도 시스템 회생에너지 이용률 향상 방안 연구)

  • Jung, Seung-Min;Lee, Han-Sang;Byun, Gil-Sung;Jang, Gil-Soo;Kwon, Sae-Hyuk;Kim, Hyung-Chul
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.2181-2182
    • /
    • 2011
  • This paper deals with power integration of large urban railway systems for improvement of regenerative energy utilization. The main idea of this paper is that the integration of railway power systems will increase efficiency through sharing regenerative energy. To verify the effects of this system, case studies for Seoul Metro Line has been performed. Where railway data of Seoul Subway Line 5 and Line 7 are used. In this work, the integrated railway system is modelled using Compaq Visual Fortran.

  • PDF

Running Characteristics for On-Line Test of Railway Vehicle

  • Han, Young-Jae;Kim, Seog-Won;Seo, Sung-Il;Mok, Jin-Yong;Lee, Su-Gil;Kim, Young-Mo
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.1347-1350
    • /
    • 2005
  • Recently, as the road capacity reaches a limit and environmental problems become serious, there exists a gradual increasing need for railway vehicles that are environment-friendly, punctual, reliable and safe. Accordingly, in addition to conventional railroad vehicles, lots of vehicles are being newly developed. Using the developed installed measurement system, the performance characteristics of railway vehicle could be monitored precisely. After recording the input real time data of each signal from railway vehicle to the network line, we could acquire the needed information through post processing program. We could verify the running performances of railway vehicle using this system. As a result, many latent defects have been found and corrected in the prototype train. The measurement systems have contributed to dramatic reduction of the developing period.

  • PDF

A study on measures to place an order for selection of tailor-made rolling stock systems for Gimpo urban transit (김포도시철도 맞춤형 차량시스템 선정을 위한 발주방안 검토)

  • Choi, Si-Haeng;Lim, Byeong-Gok;Jeon, Seo-Tak;Park, Jong-Hyuk
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.816-822
    • /
    • 2010
  • A comprehensive review for the selection of urban rail vehicle systems that best suit Gimpo railway line is taking place with consideration of the project area characteristics in light of line planning, passenger demand, supply of rolling stock, and railway construction and operation. Various aspects of vehicle systems including passenger demand on concerned lines, regional characteristics, vehicle types, and railway construction and operational settings should be taken into consideration. In addition, request for the introduction of customized vehicle systems reflecting the convenience of transit users such as wide and hospitable inner space, low noise, flexible operation of 2 to 4 car train-set and eye catching slim bridge piers is increasing. A study on alternatives to place an order to opt for optimum rolling stock systems considering line characteristics of Gimpo City's urban railway and future passenger demand while meeting the needs of Gimpo City has been conducted.

  • PDF

Suggestion to Improve the Railway Infra for Speed Increase of High-speed Train in Gyeongbu Line (경부선 고속열차 증속을 고려한 철도인프라 보강 방안)

  • Kim, Jung-Hun;Park, Dae-Geun;Won, Yong-Hoan;Kim, Man-Cheol;Kang, Young-Jong
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1249-1253
    • /
    • 2009
  • Enhancements of transport capacity in Gyeongbu line are continuous with the operating cost reduction and Korean economic development. Besides, requirements of a people about speed-up and customer service after the opening of high-speed railway(KTX) are being increased nowadays. Therefore, development and effort for speed increase of high-speed railway(KTX) have to be encouraged and supported by the government. In this study, market and technology trends for speed increase of high-speed train in Korea and abroad were investigated. As a result, we suggested to improve the railway infra for speed increase of high-speed train in Gyeongbu line.

  • PDF

Test operation and development of Automatic/Driverless operation system for the standardized type EMU (표준전동차 자동/무인운전기술 개발 및 시운전에 관한 연구)

  • 한성호;안태기;이수길;이관섭;김원경;최규형
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.172-179
    • /
    • 2000
  • The automatic/driverless operation which are great important techniques in metro railway are required to increase higher safety, greater reliability, and transport capacity. To satisfy such demands, we must have the system design iかd testing technique for the railway system operation. These techniques are related to the onboard train control and communication systems which include TCMS(Train Control md Monitoring System), ATO(Automatic train Operation), ATC(Automatic train Control), and TWC(Train to wayside communication). These sub-systems must be interfacing with not only each others but also the signal system on the ground. We tested the train control system on Test line that has been developed on the basis of the standardized type EMU for korea railway systems. This test line which is located in Sangju, have been constructed for testing 7 & 8 line of Seoul Metro railway.

  • PDF

Problems and Improvements of Transportation on TSR (TSR 운송의 주요문제점 및 개선방향)

  • 최은영;이찬우;정흥채
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.343-348
    • /
    • 2002
  • We are going to build a direct railway line between Europe and Asia by connecting North-South line. It can reduce a transportation distance by above 10,000km. But problems of TSR which is most important line have been exposed such as backward facilities and operations. In this paper we find out problems of TSR in detail and show those improvements.

  • PDF

A Study on the Revitalization Strategy for Inter-Korean Railway by Building the Railway Logistics Depot - Focused on the Donghae Line - (철도 물류기지 구축을 통한 남북철도 활성화 방안 연구 - 동해선을 중심으로 -)

  • Kim, Young-Min;Cho, Chi-Hyun
    • Journal of Distribution Science
    • /
    • v.8 no.2
    • /
    • pp.5-12
    • /
    • 2010
  • The allotment rate for railway transportation keeps an yearly 6% in Korea. However, the railway logistics will cause the opposite result according to the continuous investment and logistics rationalization. The study on railway logistics as well as inter-Korean railway that might highly contribute to the development of railway logistics is not enough at all. The purpose of this paper is to study the revitalization strategy for inter-Korean railway by forecasting the demand and the scale of railway logistics depot. The revitalization strategies for inter-Korean railway through railway logistics depot are as followings. First, it is necessary to strengthen the partnership with coal user in the logistics depot. Second, it is encouraged to provide the financial assistance that are needed in the maintenance of the decrepit North Korea's track as well as the establishment of Donghae northern line that is from Gangneung to Jejin. Third, the railway cost on long/short transportation and large sized shipper is needed to apply in a flexible way. Fourth, it is necessary to obtain the railway traffic right by involving the foreign mining development. Fifth, it is encouraged to constantly find the small sized shipper like cement company.

  • PDF