• Title/Summary/Keyword: Railway feeding system

Search Result 117, Processing Time 0.021 seconds

Analysis of Eddy Current Loss on Permanent Magnets of Interior Permanent Magnet Synchronous Motor for Railway Transit (철도차량용 매입형 영구자석 동기전동기의 영구자석 와전류 손실 분석 연구)

  • Park, Chan-Bae;Lee, Hyung-Woo;Lee, Byung-Song
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.4
    • /
    • pp.370-375
    • /
    • 2012
  • In order to apply Interior Permanet Magnet Synchronous Motor(IPMSM) to the propulsion system of the railway transit, 110kW class IPMSMs with high-power density are designed as a concentrated winding model and a distributed winding model in this study. The concentrated winding model designed in this study is 6 poles/9 slots and the distributed winding model is 6 poles/36 slots. In general, the eddy current losses in the permanent magnets of IPMSM are caused by the slot harmonics. The thermal demagnetization of the magnet by the eddy current losses at high rotational speed often becomes one of the major problems in the IPMSM with a concentrated windings especially. A design to reduce eddy current losses in permanent magnet design is important in IPMSM for the railway vehicle propulsion system which requires high-speed operation. Therefore, a method to devide the permanent magnet is proposed to reduce the eddy current losses in permanent magnet in this study. Authors analyze the variation characteristics of the eddy current losses generated in permanent magnet of the concentrated winding model by changing the number of the division of the permanent magnets.

A Study on the Voltage Drop and Earth Leakage Current according to Interval of AT in the AT Feeding Method (AT급전방식에서 AT간격에 따른 전압강하 및 대지누설전류에 대한 연구)

  • Kim, Min-Seok;Choe, Seung-Hyuk;Lee, Jong-Woo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.9
    • /
    • pp.1708-1714
    • /
    • 2011
  • AT feeding system of the electric railway system is installed every about 10km at between the feeder and catenary in parallel and the mid-point of the transformer is connected to the rail The supply voltage of this system is doubled than rolling stock voltage. So the voltage drop is smaller than usual. And the other merit of this system is the decreasing inductive disturbance to the communication line because of the reduced current in rail which runs reversed in a point of view of rolling stock. Also, ATP(Auto Transformer Post) is installed to reduce the voltage drop and to mitigate the inductive disturbance, but still now the proper distance between the ATP and AT feeding system is not established which ranges from 2 to 10[km]. The stable result of simulation(which is set that the end of the line AT is installed) to the voltage drop and inductive disturbance can not analyzes the effect to the supply system due to the ATP. This paper analyzes the effect to the system depending on the location of ATP by forecasting the voltage drop and inductive disturbance.

A Study on the Propagation of Harmonic Current in the Traction Power Supply System (철도 전력공급시스템에서의 고조파전류 확대현상에 관한 연구)

  • Oh, K.H.;Chang, S.H.;Han, M.S.;Lee, C.M.;Shin, H.S.
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.908-910
    • /
    • 1998
  • Modern AC electric car has PWM(Pulse Width Modulation) -controlled converters, which give rise to higher harmonics. The current harmonics injected from AC electric car is propagated through power feeding circuit. As the feeding circuit is a distributed constant circuit composed of RLC, the capacitance of the feeding circuit and the inductance on the side of power system cause a parallel resonance and a magnification of current harmonics at a specific frequency. The magnified current harmonics usually brings about various problems. That is, the current harmonics makes interference in the adjacent lines of communications and the railway signalling system. Furthermore, in case it flows on the side of power system, not only overheating and vibration at the power capacitors but also wrong operation at the protective devices can occur. Therefore, the exact assessment of the harmonic current flow must be undertaken at design and planning stage for the electric traction systems. From these point of view, this study presents an approach to model and to analyse traction power feeding system focused on the amplification of harmonic current. The proposed algorithm is applied to a standard AT(Auto-transformer)-fed test system in which electric car with PWM-controlled converters is running.

  • PDF

Practical diagnostic technique for catenary surge arrester in electric railway (전차선로용 피뢰기 진단기법 적용 연구)

  • Han, Moon-Seob;Jang, Dong-Uk;Jung, Ho-Sung;Kil, Gyung-Suk
    • Proceedings of the KIEE Conference
    • /
    • 2005.07b
    • /
    • pp.1631-1633
    • /
    • 2005
  • This paper describes the measurement result of leakage current flowing arrestors connected in catenary line to propose an optimal management methods. 27 arrestors set in 7 locations were tested. The leakage currents are included a harmonics of electric train during the operation of electric train in feeding section and in case of feeding earthing system.

  • PDF

Electromagnetic Induction Voltage according to the Position of Telecommunication Line from the Power Feeding Plant of Electrified Railway System (전기철도의 급전소 위치 관계에 따른 통신선 전자유도 전압)

  • Lee, Sangmu;Choi, Munhwan;Cho, Pyung-Dong
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2015.05a
    • /
    • pp.689-692
    • /
    • 2015
  • That induced voltage by an electrified railway line is related with the position of telecommunication line between traction power feeding systems is practically varified by measurements in the real field. This experimented fact is conformed with the calculated simulation provided by the ITU-T Directives concerning the protection of telecommunication lines against harmful effects from electric power and electrified railway lines. Therefore it is needed to consider at what position a telecommunication line is parallelized with power feeding line of traction system when an induction phenomenon is evaluated or measurement is carried out besides the length of parallelization and the separate distance between power line and telecommunication line.

  • PDF

A Study on the Design Procedure of the Eight Pole Magnetic Bearings for the Inner-rotor and the Outer-rotor Type

  • Lee, Jun-Ho;Park, Chan-Bae;Lee, Byung-Song;Lee, Su-Gil;Kim, Jae-Hee;Jung, Shin-Myung;Lee, Hyung-Woo
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.6
    • /
    • pp.1424-1430
    • /
    • 2013
  • This paper presents design procedure of the magnetic bearings used for high-speed electric machines and flywheel energy storage systems. Magnetic bearing can be categorized by inner-rotor type and outer-rotor type according to the position of the rotary disc. These two types are applicable based on application environments such as application space, required attraction force, and controllability. Magnetic bearing is generally designed based on the ratio (geometrical coefficient or geometrical efficiency) of pole width to rotor journal radius but proper ratio is only decided by the analysis. This is the difficulty of the magnetic bearing design. In this paper, proper design technology of the inner-rotor type and outer-rotor-type eight pole magnetic bearings is introduced and compared with the FEM analysis results, which verifies the proposed design procedure is suitable to be applied to the design of the magnetic bearings for the industrial applications and flywheel energy storage system.

A Control Method of Phase Angle Regulator for Parallel-Feeding Operation of AC Traction Power Supply System (교류전기철도 병렬급전 운영을 위한 위상조정장치 제어기법)

  • Lee, Byung Bok;Choi, Kyu Hyoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.5
    • /
    • pp.672-678
    • /
    • 2020
  • The parallel-feeding operation of an AC traction power supply system has the advantages of extending the power supply section and increasing the power supply capacity by reducing the voltage drop and peak demand caused by a train operation load. On the other hand, the parallel-feeding operation is restricted because of the circulating power flow induced from the phase difference between substations. Moreover, the power supply capacity is limited because of the unbalanced substation load depending on the trainload distribution, which can be changed by the train operation along the railway track. This paper suggests a Thyristor-controlled Phase Angle Regulator (TCPAR) to reduce the circulating power flow and the unbalanced substation load, which depends on the phase difference and the trainload distribution and provides a feasibility study. A dedicated control model of TCPAR is also provided, which uses substation power supplies as the input to control the circulating power flow and an unbalanced substation load depending on the phase difference and the trainload distribution. Simulation studies using PSCAD/EMTDC shows that the proposed TCPAR control model can reduce the circulating power flow and the unbalanced substation load depending on the phase difference and the trainload distribution. The proposed TCPAR can extend the parallel-feeding operation of an AC traction power system and increase the power supply capacity.

Applying New Algorithm on AC Auto-Transformer Feeding System under Multiple Trains Operating (AT 교류 철도급전계통 내 다수 열차 운행시 새로운 계통해석 알고리즘 연구)

  • 전용주;추동욱;전명수;임성정;김재철
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.712-719
    • /
    • 2000
  • This paper presents a new algorithm to analyze a train voltages of multi-trains in auto-transformer-fed AC railway systems, using electrical equivalent change. The train current will be divided into circulation and return currents, and these current values are the same. By evaluating each current independently, the result will be more precise. The train current flows through the all auto-transformer corresponding to track impedance. In analyzing the railway system, the algorithm is based on the K.C.L, K.V.L, superposition and circuit separation method. Multi-train's voltages are determined by calculating the catenary voltage at each train's position and adding up these train's voltage drop. Case studies use a field operational data, show that tile proposed method is easily applied.

  • PDF

Analysis for Catenary Voltage of The ATs-Fed AC Electric Railroad System (교류전기철도 급전시스템의 전차선 전압해석)

  • 이승혁;정현수;김진오
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.490-496
    • /
    • 2002
  • This paper presents exact Autotransformers(ATs)-fed AC electric Railroad system modeling using constant current mode far locomotives. An AC electric railroad system is rapidly changing single-phase load, and at a feeding substation, 3-phase electric power is transferred to paired directional single-phase electric power. As the train moves along a section of line between two adjacent ATs. The proposed AC electric railroad system modeling method considers the line self-impedances and mutual-impedances. The constant current mode model objectives are to calculate the catenary and rail voltages with the loop equation. When there are more than one train in the AC electric railroad system, the principle of superposition applies and the only difference between the system analyses for one train. Finally, this paper shows the general equation of an AC electric railroad system, and that equation has no relation with trains number, trains position, and feeding distance.

  • PDF

Analysis and compensation of the current unbalance considering dynamic characteristic of feeding traction loads (철도 부하의 동적 특성을 고려한 전류 불평형의 분석과 보상)

  • 김기표;김진오
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.17 no.1
    • /
    • pp.54-60
    • /
    • 2003
  • Feeding traction loads from the public power system may lead to some current and voltage unbalance and consequently affects the operation of its energy-supply system and other equipment connected with it. This paper introduces an analysis of the current unbalance caused by the demands of an electric railway on a public power system. And the results with compensator and without compensator are simulated, and eventually the formula about the current unbalance is suggested. The Scott-connected transformer is adopted in Korea National Railway System. So Scott-connected transformer among the various transformer connection schemes is analyzed in this paper. Also, the formulas about the unbalance and compensating current can be derived by using two parameters(M-phase and T-phase current) of secondary Scott-connected transformer. So, the practical and accurate simulation can be done through dynamic models by using scheduling of traction.