• Title/Summary/Keyword: Railway Track

Search Result 1,567, Processing Time 0.032 seconds

Dynamic analysis of railway vehicle by using track coordinates (트랙 좌표계를 이용한 철도차량 운동 해석)

  • Kang, Ju-Seok
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.818-823
    • /
    • 2011
  • 6-generalized coordinates of absolute translational displacements and angular displacements measured at Cartesian coordinates system fixed at the ground has been used to describe general dynamic behavior of a rigid body in mechanical systems. However, track coordinates system moving with the centerline of the track can be used to develop dynamic formulations for railway vehicle. It is easy to impose the constraints of track coordinates by the virtue of track coordinates system moving with track centerline. In this analysis, dynamic equations of railway vehicle by using track coordinates system is derived and the simulation results are presented.

  • PDF

A Study on High-Speed Railway Track Maintenance Scheduling Using ILOG (ILOG를 이용한 고속선 궤도 유지보수 일정계획에 관한 연구)

  • Nam, Duk-Hee;Kim, Ki-Dong;Kim, Sung-Soo;Lee, Sung-Uk;Woo, Byoung-Koo;Lee, Ki-Woo
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1177-1190
    • /
    • 2010
  • The high-speed railway track occurs train operating result track irregularity, subsidence of the track, ballast abrasion. This is the unusual condition. High-speed railway track maintenance task is the behavior which repairs unusual section by using the human resource or machine resource. The resource used to maintenance task is restrictive. A resource can be efficiently used if the high-speed railway track maintenance scheduling is used. So the more task can be performed in the fit time. In conclusion, this manages the unusual condition of a track efficiently. So additional expenses is minimized cause by deteriorating unusual condition. And it offers comfortable ride to passenger. However, maintenance scheduling has to reflect well practical situation and environment. That's maintenance scheduling is used. We gather the opinions of the hands-on workers. So in this paper define field situation and condition. And suggest mathematical model about this. And we developed the track maintenance scheduling software engine using ILOG.

  • PDF

Mapping vertical bridge deformations to track geometry for high-speed railway

  • Gou, Hongye;Ran, Zhiwen;Yang, Longcheng;Bao, Yi;Pu, Qianhui
    • Steel and Composite Structures
    • /
    • v.32 no.4
    • /
    • pp.467-478
    • /
    • 2019
  • Running safety and ride comfort of high speed railway largely depend on the track geometry that is dependent on the bridge deformation. This study presents a theoretical study on mapping the bridge vertical deformations to the change of track geometry. Analytical formulae are derived through the theoretical analysis to quantify the track geometry change, and validated against the finite element analysis and experimental data. Based on the theoretical formulae, parametric studies are conducted to evaluate the effects of key parameters on the track geometry of a high speed railway. The results show that the derived formulae provide reasonable prediction of the track geometry change under various bridge vertical deformations. The rail deflection increases with the magnitude of bridge pier settlement and vertical girder fault. Increasing the stiffness of the fasteners or mortar layer tends to cause a steep rail deformation curve, which is undesired for the running safety and ride comfort of high-speed railway.

A New Slab Track System (새로운 슬래브궤도 시스템)

  • 강보순
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.213-218
    • /
    • 2002
  • A new German high speed railway slab track was investigated. The construction objective was to provide a durable and maintenance free track system consisting of precast concretepanels of consistently high quality and highest achievable accuracy in track geometry. The System on the basis of precast panels similar to the slab track system constructed on the line Dachau- Karlsfeld in 1997.

  • PDF

Modal Tests of Railway Bridges considering the Type of Track Structures (철도교량 동특성 분석을 위한 궤도형식별 모달 테스트)

  • Kim, Sung-Il;Yu, Jin-Young;Mun, Je-U;Hong, Seong-Mo;Kim, Jong-Tae
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.101-108
    • /
    • 2008
  • The dynamic behavior of railway bridges originates from dynamic properties of various spans and structural types. As a result, the exact estimation of dynamic properties of the railway bridge can produce the exact estimations of dynamic performances of the railway bridge. The damping ratio affects the dynamic reponses of the railway bridge in the vicinity of the critical speed seriously. Eurocode, National Annex of each European country and Japan have their own specification for the damping ratio for the estimation of dynamic performance of railway bridges. In our case, the specification for Honam high speed railways follows the Eurocode. In the present study, for the verification and regulation of the damping ratio and investigation of various dynamic properties, modal tests of various structural types are performed. In addition, for the investigation of effects of track structures on the dynamic property of the bridge, ballast track and concrete track are installed and tested.

  • PDF

Random vibration analysis of train-slab track-bridge coupling system under earthquakes

  • Zeng, Zhi-Ping;He, Xian-Feng;Zhao, Yan-Gang;Yu, Zhi-Wu;Chen, Ling-Kun;Xu, Wen-Tao;Lou, Ping
    • Structural Engineering and Mechanics
    • /
    • v.54 no.5
    • /
    • pp.1017-1044
    • /
    • 2015
  • This study aimed to investigate the random vibration characteristic of train-slab track-bridge interaction system subjected to both track irregularities and earthquakes by use of pseudo-excitation method (PEM). Each vehicle subsystem was modeled by multibody dynamics. A three-dimensional rail-slab- girder-pier finite element model was created to simulate slab track and bridge subsystem. The equations of motion for the entire system were established based on the constraint condition of no jump between wheel and rail. The random load vectors of equations of motion were formulated by transforming track irregularities and seismic accelerations into a series of deterministic pseudo-excitations according to their respective power spectral density (PSD) functions by means of PEM. The time-dependent PSDs of random vibration responses of the system were obtained by step-by-step integration method, and the corresponding extreme values were estimated based on the first-passage failure criterion. As a case study, an ICE3 high-speed train passing a fifteen-span simply supported girder bridge simultaneously excited by track irregularities and earthquakes is presented. The evaluated extreme values and the PSD characteristic of the random vibration responses of bridge and train are analyzed, and the influences of train speed and track irregularities (without earthquakes) on the random vibration characteristic of bridge and train are discussed.

Numerical Analysis of Track Irregularity in Excavation Adjacent to Railway Trackbed (수치해석을 통한 철도노반 인접 굴착 시 궤도틀림 분석)

  • Seokjun Lee;Dongwook Oh;Seongmin Jang;Batchimeg, Banzragchgarav;Hyuksang, Jung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.12
    • /
    • pp.39-45
    • /
    • 2023
  • In this paper, a track irregularity according to adjacent deep excavation of railway was analyzed using three-dimensional numerical analysis. The construction for excavation adjacent to the railway track is likely to have a negative impact on train operations. Despite mandatory assessments of the stability and impact on adjacent structures during construction, reports continue to indicate ongoing settlement and track irregularity resulting from construction. Changes in the groundwater level and stress state of the ground due to excavation are pointed out as causes for settlement and track irregularity in structures adjacent to the excavation. In this study, therefore, numerical analysis was conducted taking into account factors that induce track irregularity during adjacent excavation work as variables. The KRL-2012 standard train load was applied to simulate operating trains. As a results, The position of the train load, the distance from the excavation point, had a significant impact on track irregularity, and there was a significant occurrence of track misalignment when the train load was applied. The impact of the groundwater level was not significant.

A Study on Coupling Coefficient Between Rail and Reinforcing Bars in Concrete Slab Track (콘크리트 슬래브궤도에서 레일과 철근 사이의 결합계수에 대한 연구)

  • Kim, Min-Seok;Lee, Sang-Hyeok;Kwon, Jae-Wook;Lee, Jong-Woo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1169-1177
    • /
    • 2008
  • The system of the railway signaling using the track transmits the approved speed to the location of a train and it. Referring to the way of transmitting train control information, there are the one transmitting it to the on-board system of a train using the direct track, the another transmitting it establishing an instrument, and the other transmitting an instrument by a railway track. The one is the method using the direct track as a conductor for composing the part of the track and attaining the information controlling a train by transmitting a signal to the track. It is used for the high-speed railway and the subway. The method using the track attains information by transmitting it to returned information, and the on-board system of a train attains it by magnetic coupling. Because many reinforcing bars on the concrete slab track are used, interaction between a rail and a reinforcing bar that is not produced on ballast track is made. Due to the interaction, the electric characteristic of rail is changed. In the current paper, we numerically computed the coupling coefficient between the rail and the reinforcing bar based on the concrete slab track throughout the model related to the rail and the reinforcing bar using the concrete slab track that is used in the second interval of the Gyeongbu high-speed railway, and we defined the coupling coefficient not changed in the electric characteristic of rail in the condition that there is no interaction between the rail and the reinforcing bar.

  • PDF

An Investigation on German High Speed Railway Slab Track (독일 고속철도 슬래브궤도의 고찰)

  • 강보순
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.508-513
    • /
    • 2001
  • State of the German high speed railway slab track were investigated. The Permanent Way consisting of rails and sleepers laid on ballast is a technically and economically viable solution. After two decades of targeted research and development activities Slab Track turned out to be a reasonable option on special fields.

  • PDF

A Study on Dynamic characteristics in the Ballast gravel in Gyeongbu High Speed Railway (경부고속철도 토공부의 자갈도상에 대한 진동특성 연구)

  • Park, Jun-O;Kang, Tae-Ku;Hong, Won-Pyo
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.84-90
    • /
    • 2009
  • The gravel ballast in the ballasted track has the function to not only transfer/scatter the train loads to subgrade through rail and sleeper but also elastically support the train loads. Because track irregularities results inevitably from the repetitive train loads, the track maintenance should be undertaken for correcting them. By analyzing the track maintenance history in the Gyeongbu high speed railway, this study tries to choose the local two spots in the railway in which the repair frequencies are maximum and relative small; to analyze their dynamic characteristics as well as grade; and to compare them with maintenance history. As the dynamic characteristics of track, the vertical displacement and vibrating acceleration of sleeper as well as acceleration of ballast are measured/analyzed. Furthermore, by collecting soil and gravel on the reinforced roadbed and undertaking ballast screening test, the size distributions are compared with grade distribution standards of high speed railway.

  • PDF