A trial run of locally-developed tilting train has been in process on Chungbuk line since the test vehicle was first produced. For the system stabilization, interface verification among the systems including track, structure, catenary and signaling system, not to mention the rolling stock, is very crucial. In the area of wayside structure, the stability of track structure and train run shall be evaluated through the review of impact by increased speed by developed train on track structure. The study thus was intended to evaluate the impact on track while a tilting train is running the conventional line(ballast track), which is vulnerable to accelerated train speed. The evaluation of tilting train test running the part of Honam line was conducted to identify the impact on existing track performance by tilting train. To identify the performance of each part of track components while tilting train and high speed train were running the existing line, wheel load, rail bending stress, vertical displacement of rail and sleeper were compared so as to evaluate the expected impact by tilting train for improving the train speed.
A trial run of locally-developed tilting train has been in process on Chungbuk line since the test vehicle was first produced. For the system stabilization, interface verification among the systems including track, structure, catenary and signaling system, not to mention the rolling stock, is very crucial. Therefore, in this study, the dynamic rail force of the tilting (Hanvit 200), high-speed (KTX) and general (Mugunghwa) vehicle caused by driving in transition curve track was measured. And, it compared the tilting response with the other by using the measured wheel load data in transition curve track, and then evaluated probability the range of wheel load fluctuation for the variable dynamic vertical and lateral wheel load. As a result, a range of wheel load by occured a change of cant from the high-speed and general vehicle which had fixed bogie structure was distributed throughout small deviation (${\Delta}8{\sim}13kN$). Otherwise, in case of the tilting train which was consisted of the pendulum bogie structure was distributed wide range about large deviation (${\Delta}25{\sim}28kN$) by changed of cant.
오늘날 산업 기술의 발달에 따른 고도화로 인해, 최근 우리 사회에 고속열차에 이어 무인운영 도시철도에 이르기까지 다양한 열차 시스템들이 개발 및 운용되고 있는 추세에 있다. 특히, 본 연구에서 대상으로 다룬, 도시철도 도메인에서는 기존 철도차량에 대해서 신호 제어 시스템을 운용하는 환경에서 보다 복잡화된 운용개념을 지원하기 위한 신규 신호 시스템 체계의 도입이 필요로 하고 있다. 또한, 기존의 존재하지 않은 컨셉을 바탕으로 개발되는 신호 시스템은 철도를 이용하는 승객들의 인적 피해를 최소화하기 위한 노력이 필요로 하고 있다. 본 연구에서는 신규 시스템 개발에 참여하는 다양한 도메인 엔지니어로 하여금 동일한 시각 제공과 통합된 방법론을 바탕으로 효율적인 신호시스템 설계 및 안전 활동을 위한 방법론을 제시 하고자 한다. 따라서, 서로 상이한 도메인 영역의 연계성 확보를 통해 향후 신규 시스템 설계시 보다 안전성 확보를 통한 설계적 무결성을 확보할 수 있는 방법론이 될 수 있을 것이다.
ATS(Automatic Train Stop) system makes train stop when it runs over the speed limit and ensure the safe operation of train. Seoul Metro line 2 in Korea, which started its passenger service in 1982, has adopted ATS system for its signaling system. The ATS system has only a train stop function at the time of emergency, and Seoul Metro is planning to replaced them with ATC(Automatic Train Control)/ATO(Automatic Train Operation) system which can provide the dedicated speed control for headway reduction and automatic operation of train. Until all the ATS system is replaced with the new ATC system, both systems are to operate simultaneously at the same metro line. In this situation, ATS system sometimes reveals improper operation: train stops suddenly without any obstacles in front of it. These emergency stops cause interruption of passenger service, and abnormal abrasion of wheels and rail. This paper makes it clear that these interruptions are caused by EMI phenomena between ATS on-board device and ATC wayside device : Signal current flowing in AF track circuit of ATC is turn out to be a EMI source that prevent normal operation of the ATS on-board device. Although the two systems have different frequency-ranges (ATS system has frequency range between $78{\sim}130$[kHz] and ATC system has frequency range between $9.5{\sim}16.5$[kHz]), it turned out that EMI phenomena appears between the both systems. This is investigated by measuring the output signal from ATS on-board device passing over ATC wayside device. The FFT(Fast Fourier Transform) analysis of the signal reveals that AF track circuit signal is transmitted to the ATS on-board device and induce noise causing improper operation. The countermeasures to the EMI phenomena are examined in three ways; blocking EMI transmission, enforcement of EMS (Electromagnetic Susceptibility) of ATS on-board device, and blocking the EMI source. It is suggested that the practical solution be blocking EMI source temporarily, that is breaking AF track circuit signal when the trains with ATS on-board device pass over it. To this purpose, TODS(Train Occupation Detection System) is developed, and has made a success in preventing the EMI problem of Seoul Metro line 2.
차량기지 검수고에 구조를 고려하였을 시, 철제빔으로 인해 열차를 검지하기 위한 궤도회로를 설치하기가 어렵고, 레일과 대지가 철제빔으로 연결되어 누설전류가 많아지므로 궤도회로 시스템을 적용할 수 없다. 그러므로 열차가 검수고에 들어오면 수작업으로 차량이 있다는 표시를 하여 사용하고 있으며, 잘못 취급할 시에는 열차충돌 혹은 탈선으로 이어지는 사고가 발생할 수 있다. 본 논문에서는 검수고에서 소프트웨어 프로그램을 이용하여 가상궤도회로를 적용하였다. 가상궤도회로의 알고리즘을 제시하였으며, 열차가 점유된 검수고 방향으로 신호를 취급하는 경우에 검수고 열차점유 표시 및 신호기 정지신호 표시로 인해 검수고에서 열차의 안전성을 확보하였다. 또한 프로그램의 신뢰도 및 가용도를 분석하여 소프트웨어에 적합한 결함허용 기법을 적용하였다.
도시철도 운행시스템에서 외란에 의해 지연이 발생하면 열차 사이에 간격편차가 발생하고 열차운행 상황이 불안정해진다. 따라서 이러한 불안정한 열차운행을 방지하기 위해서는 열차간격을 적절하게 제어하는 것이 필요하다. 본 논문에서는 상용 도시철도 운행시스템에서 외란에 의해 지연이 발생하는 경우에 안정한 운행을 위하여 간단하면서 효과적으로 적용할 수 있는 열차간격 최적제어 알고리즘을 제안한다. 제안한 알고리즘은 실시간 열차간격 편차의 크기에 따라 제어 대상열차를 결정하고 이산 열차간격 모델을 이용하여 대상열차의 정차시간을 조절함으로써 모든 열차가 적정 운행간격을 유지하도록 제어한다. 또한 시뮬레이션을 통하여 제안한 방법의 유효성을 확인한다.
지하철에서는 주로 LTE와 Wi-Fi를 통하여 급증하는 무선데이터서비스를 제공하고 있다. 승객의 이동에 따라 이용객 수가 급변하는 특성을 가지고 있으며, LTE는 사용자가 증가해도 안정적인 서비스 제공이 가능한 반면에 Wi-Fi는 이용객이 증가하면 접속시간이 증가하는 등 성능이 크게 저하되는 현상이 발생한다. 본 논문에서는 Wi-Fi 전송망에 대한 수학적 모델링 및 시뮬레이션을 통하여 이용객 증가에 따른 접속지연 증가 특성을 분석하였으며, 영업운영 중인 지하철 10개 역 구간에서 Wi-Fi 망에의 접속지연 및 손실률을 측정하여 비교하였다. 측정 및 분석 결과는 지하철에서의 LTE와 Wi-Fi 간 데이터 오프로딩 구성에 필요한 접속방법 및 향후 LTE-R 도입시 효율적인 망 구성에 적용할 수 있다.
A study which is to develop the low-cost urban railway system for low-density line such as Gwang-ju subway Line 2 is in progress, and its TCS(Train Control System) is required as an economic system which is able to train operation suitable in low-density line. We have developed the signaling equipment which is configured with automatic block system between stations, and the control center's equipment in order to meet the requirements of TCS mentioned above. In this paper, we propose the control procedure of ATS to be required for train operation management in the low-density line such as Gwang-ju subway Line 2. The control procedure of ATS considered all features such as the requirements analysis for train operation management, the functions of train control system to be applied and the block type. Also, it considered the station(interlocking, passenger, turn-back) type, station control(stop, route, departure, turn-back departure, turn-back) type, and train operation management for exiting and entering depot. The ATS control procedure proposed in this paper has an advantage in the cost and efficiency through unification and optimization of its function. And in cost of operating and maintenance, the ATS system has a feature that can be significantly reduced.
This paper presents a compensation method of unbalanced phase currents in interleaved bi-directional converters. Phase currents in interleaved bi-directional converter are apt to be unbalanced due to circuit parameter error and switch operation difference. This problem causes the switch element failure and the reduced efficiency of the converter. Therefore, it is necessary that a certain balance control algorithm is provided in interleaved bi-directional converter system. In this paper, a balance control algorithm based on the circular chain control method is proposed. Further, in order to reduce the number of phase current sensors, this paper shows a simple method in which phase currents can be extracted indirectly through a DC-link current sensor in both charging and discharging modes. The validity and the effectiveness of the proposed phase currents balance control algorithm are illustrated through the simulation results.
Traffic congestions in local cities have been getting worse since 1990s, so many local governments have considered the introduction of an LRT system. So far, there is no city operating the LRT due to social environments, financial reasons, feasibility and so on. But still many cities have examined LRT or started the construction. Until now, more than 30 cities are constructing LRT or planning the introduction of LRT and it becomes 96 routes, approximately 700km. With the support of MLTM, KRRI has developed automatic LRT system with rubber-wheels, K-AGT as a result of "LRT system technology development project" from 1999 to 2005 by investing 50.32 billion wons(the public 37, the private 13.32) and finished running durability test of 100,000km at Kyeong-san test line. Currently, two trains, coupled two cars respectively have running and signaling tested. K-AGT was appointed to supply for an extension line at Busan Subway Line 3(Minam-Anpyeong section) with 17 trains(six-unit car) 102 cars. However, except for Minam-Anpyeong section, other cities such as Uijeongbu, Yongin, Daegu(Line 3) and Kwangmyeong decided to use the foreign systems, not to use the product, a result of national R&D project. This results in a huge waste of foreign currency and it is expected to require much additional cost for maintenance. If local governments use the products of national R&D projects, many national benefits such as reducing imports and protecting home industries could be expected, therefore in this paper, some plans to encourage to use products of national R&D projects were dealt with.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.