• Title/Summary/Keyword: Railway Schedule

Search Result 99, Processing Time 0.027 seconds

Mixed Operation with Express Train for Urban Railways in Seoul Metropolitan Area (대피선 설치를 통한 수도권 광역철도 급행화 방안)

  • Son, Gi-Min
    • Journal of Korean Society of Transportation
    • /
    • v.25 no.5
    • /
    • pp.195-207
    • /
    • 2007
  • The urban railways connecting between the inner city and suburb of Seoul metropolitan area, has lost the competitiveness against cars because too many stops deteriorated operating speed and passenger's level of service. This paper suggests that an express train should be introduced into the urban railway system in order to sort out such a complication. There are two considerations in the present study. Firstly, train schedule problem should be taken into account. In this regard, a new model for urban railway system was developed by revising the existing models dealing with single line freight railway. Approximate branch and bound algorithm based on conflict group rather than a single conflict was adopted. Consequently, it was found that the time saving in calculating the optimal schedule is the most meaningful contribution of the algorithm. The second consideration is associated with the application of the model. A case study was carried out using the actual operation data from Ansan line. In conclusion, the operation speed of the line can increase considerably with minimal number of new sidings.

Evaluation of Train Capacity Pattern Considering Customer Demands (고객수요를 고려한 열차용량패턴에 관한 연구)

  • Kim Dong-Hee;Kim Seong-Ho;Hong Sun-Heum
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.507-513
    • /
    • 2004
  • In the railway system, transportation plan corresponds to a m aster plan for transport services. This service plan must be constructed to minimize operational cost or maximize revenue considering transportation demands and resource capacities in the railway operation company, and it includes several sub-planning activities such as train operation frequency plan, train (schedule) plan, train capacity assignment plan, and rolling stock requirement plan. In these sub- planning processes, train can be con side red as a product for providing customer services, and customer demands and operational advantages must be considered. In this paper, we present an effect estimation system for the train capacity pattern in a train schedule, and the effect of capacity pattern can be expressed as minimum spilled demand, minimum train service cost, and maximum train revenue or profit.

  • PDF

Improved Morphing Visualization Methodology for Effective 4D Expression of Railway Facility (철도시설의 효율적 4D구현을 위한 개선된 Morphing 시각화 방법론 구축)

  • Moon, Hyoun-Seok;Kwon, Jung-Hui;Kim, Chang-Hak;Ji, Sang-Bok;Kang, Leen-Seok
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.350-353
    • /
    • 2006
  • Generally, 4D CAD can be used for visualizing construction schedule information in railway construction project. It is important that 3D CAD object should be represented by real construction situation according to construction site condition. However, it is difficult to visualize real construction situation in 4D CAD viewer because 3D objects should be separated by limited duration of each activity. This study suggests a morphing technology for visualizing 4D object by each activity schedule according to real construction progress.

  • PDF

Estimating Line Capacity Considering High-Speeding and Diversification of Trains (열차 속도향상과 다양화를 감안한 선로용량 산정에 관한 연구)

  • Ki, Hyung-Seo;Park, Dong-Joo;Choi, Jong-Bin;Choo, Jun-Sup
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.5
    • /
    • pp.623-630
    • /
    • 2009
  • The Korean railway system is a mass transit system consisting of a variety of train types such as common trains, high-speed train (KTX) and Metropolitan Express Railway (EMU). Its operation is based on the official timetable and it provides us with safe, accurate, quick and comfortable service. The objective of this study is to propose and prove more practical method for estimating line capacity by considering high-speeding and diversification of trains. In particular, the focus of this study is to reduce the discrepancy between the result of the theoretical line capacity estimation and the real line capacity of the operating agency of the Korean railway. In order to achieve the object, this study introduces a new railway capacity notion by considering TPS of line alignment, the operation type, train control and signaling system, etc. Through a practical schedule diagram exemplification, the result of the proposed method is verified as well.

Cooperation Case between Railway Specialized Authorities and Local Government in LRT Project (경전철사업에서의 철도전문기관과 지자체 간의 협력사례)

  • Song, Jae-Il
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2217-2224
    • /
    • 2011
  • The railway industry has well developed with Korea's economic growth as follows - Industrial railway's electrification in 1973, Seoul subway opening in 1974, Busan subway opening in 1985, High speed railway opening in 2004. But LRT as city transportation means has been faced with many difficulties. Looking at the LRT projects implemented until now, there are some issues like the transportation demand, the quality & safety of RS and facilities, the poor management of inhabitant complaints and the failure to maintain policy coherence. They have caused not only the project schedule to extend but also the project costs to increase, even to obstruct the project progress itself in some cases. These risk factors become the obstacle of LRT project's success, but it is said that more basic problem is the lack of risk management capability of competent authorities in railway business. Under these circumstance, Railway specialized Authorities and Local government have cooperated to identify various risk factors and to prepare the measures in advance, so we try to introduce this cooperation case, which will help other local government as an useful reference.

  • PDF

A study on Development of method for Train Schedule Simulation (철도 차량운행계획 시뮬레이션 방법론 개발에 대한 연구)

  • Shin, Dae-Sup;Park, Eun-Kyung;Lee, Jin-Sun;Lee, Seon-Ha
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.1
    • /
    • pp.88-95
    • /
    • 2012
  • Presently, because making process of train service plan consist of various constraint condition, for example structure of track, structure of track in station, train maintenance time and others for considering to be necessary of train management, it has been had extremely complex structure problems. For these reasons, it has big problems to compare analysis for various train service time-table. A study suggest methodology to choice service the most effective schedule and plan of train put before comparative analysis on making train diamond picture's expected effect of established possible various train time-table in making process of train service schedule for improving effectiveness and organization of train service schedule establishment. A study uses Line-Blocking theory for analyzing train service time-table and analyze example for regional train Sadang to Ansan section in 4line.

Optimization of Planning-Level Locomotive Scheduling at KNR and Development of Its Implementation Prototype Program (한국철도에서의 계획단계 동력차 스케줄링 최적화 및 전문가 지원시스템의 프로토타입 프로그램 개발에 관한 연구)

  • 문대섭;김동오
    • Proceedings of the KSR Conference
    • /
    • 1999.11a
    • /
    • pp.46-53
    • /
    • 1999
  • As of July 1999, i,185 lomocotives(excluding metropolitan area electric locomotives) are in Korean National Railroad(KNR). With this limited number of resources assigning locomotives to each trains of timetable is very important in the entire railway management point of view because schedule can be regarded as goods in transportation industry. On a simple rail network, it is rather easier to assign proper locomotives to trains with the experience of operating experts and get optimal assignment solution. However, as the network is getting bigger and complicated, the number of trains and corresponding locomotives will be dramatically increased to rover all the demands required to service all of the trains in timetable. There will be also numerous operational constraints to be considered. Assigning proper locomotives to trains and building optimal cyclic rotations of locomotive routings will result in increasing efficiency of schedule and giving a guarantee of more profit. The purpose of this study is two fold: (1) we consider a planning-level locomotive scheduling problem with the objective of minimizing the wasting cost under various practical constraints and (2) development of implementation prototype program of its assigning result. Not like other countries, i.e. Canada, Sweden, Korean railroad operates on n daily schedule basis. The objective is to find optimal assignment of locomotives of different types to each trains, which minimize the wasting cost. This problem is defined on a planning stage and therefore, does not consider operational constraints such as maintenance and emergency cases. Due to the large scale of the problem size and complexity, we approach with heuristic methods and column generation to find optimal solution. The locomotive scheduling prototype consists of several modules including database, optimization engine and diagram generator. The optimization engine solves MIP model and provides an optimal locomotive schedule using specified optimization algorithms. A cyclic locomotive route diagram can be generated using this optimal schedule through the diagram generator.

  • PDF

An Algorithm for detection and Resolution of Train Conflicts Occurring Within Station (역내 열차 경합 검지 및 해소를 위한 수리 모형 및 해법)

  • Park, Bum-Hwan;Kim, Kyung-Min;Hong, Soon-Heum;Kim, Young-Hoon
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.179-185
    • /
    • 2007
  • In large station with high density traffic, trains can be hardly controlled by CTC but by station dispatcher because CTC has difficulties in monitoring all states of affairs happening within each station such as departures, arrivals of many trains from different lines and shunting of trains to move between yards and platforms, etc. Therefore the station's dispatcher has to make quick decision about how to reschedule the times and routes for all the trains scheduled within a specific time window. And such decision becomes harder when an unexpected delay occurs because a delay occurring in a train propagates other trains as time goes on. Generally, it is called the conflict detection and resolution to adjust beforehand the distorted schedule due to a delay to original schedule. Our research is different from the state of the arts in that ours determines simultaneously the routes and the times of arrival and departure of trains, although others do only the arrival and departure time of the trains without considering the alternative routes and shunting of the station. This study suggests a mathematical approach for how to detect in advance and resolve efficiently the conflicts occurring within a station and it will be shown how to reduce delay using our approach by means of analysing the schedule of ChyungRyangRi station.

Estimating Line Capacity Considering High-Speeding and Diversification of Trains (열차 속도향상과 다양화를 감안한 선로용량 산정에 관한 연구)

  • Ki, Hyung-Seo;Park, Dong-Joo
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1839-1850
    • /
    • 2009
  • The Korean railway system is a mass transit system in which a various types of trains such as common trains, high-speed train (KTX), Metropolitan Express Railway (EMU) are operated. It is operated based on a timetable and provides us with safety, regularity, quickness and comfortable service. The objective of this study is to propose a method for estimating line capacity considering high-speeding and diversification of trains. In particular, the focus of this study is on the closing gap between the result of the existing line capacity estimation method and the real-world line capacity of the operating agency of the Korean railway. For this, this study introduces a new railway capacity definition by considering TPS of line alignment according to the operation type, train control and signaling system, etc. The verification of the proposed method using a practical schedule diagram exemplification is discussed as well.

  • PDF

An Exploratory Development of Railway-timetable Rescheduling Model Considering Transferring Service between KTX and Conventional Train on a Double Line Track (KTX열차와 일반열차 간 접속대기를 고려한 복선구간 열차시각표 재수립 모형의 기본설계)

  • Kim, Jae-Hee;Oh, Seok-Moon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.6
    • /
    • pp.1337-1345
    • /
    • 2009
  • In the railway, the delay of a train may affect the schedule of other trains. Hence, the timetable management activity involving overtaking and transferring becomes an important issue. The timetable rescheduling is the conflict resolution of the disrupted schedule and a matter of deciding the sequence of moves among trains and the place for meeting. In Korea, there are few cases where operations research models were applied to railway timetable rescheduling problem in consideration of the transfer between Korea Train eXpress (KTX) trains and conventional trains. Hence, we present a mathematical approach that can minimize the total delay of the whole trains secondly. We applied the model to the exemplary section of a double-line track, the Gyung-Boo Line, and it is confirmed that the mathematical model could effectively address the transfer service as well as the complicated railway conflicts of Gyung-Boo Line.