A Study on the Possiblity of Schedule Speed Improvement for Kyeongbu HSR (경부고속철도의 표정속도 향상 가능성에 대한 고찰)

  • Yun, Jang-Ho;Eum, Ki-Young;Park, Jung-Hyun;Ryu, Seong-Chan
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1793-1801
    • /
    • 2011
  • The domestic railway has high speed trains as good as those of countries outside Korea, but the schedule speed in the domestic railway, which is calculated by dividing distance to destination by time, is lower than that of overseas trains. The object of this study is the necessity for the improvement of schedule speed in the Kyeongbu High speed railway. This study was conducted with analyzing foreign cases related to the improvement of schedule speed in order to satisfy the increasing traffic demand. The schedule speed against the high speed of railway advanced countries is over 65%, while it is about 50% in the domestic railway. In conclusion, This study confirmed that there are possibilities and plans about the improvement of schedule speed for using TPS analysis in the Kyeongbu High speed railway.

  • PDF

A Study on the Adjustment of Railway Schedule (수요를 고려한 열차 스케쥴 조정방안 연구)

  • Park Beom Hwan;Hong Sun Heum;Kim Dong Hui;Kim Gyeong Tae
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1546-1552
    • /
    • 2004
  • Railway schedule is periodically modified so that it could yield more profit by means of adjusting the schedule to demand. Most of related works are applicable under the given demand, but did not deal with dynamic relation between demand and schedule. To our knowledge, the methodology considering the relation is only the profitability evaluation model developed by SNCF. Our study suggests how to adjust the schedule to demand and therefore obtain more benefits using the profitability evaluation model.

  • PDF

Development and Case Study of 4D CAD System for Visualizing Schedule Data of Construction Project (건설시설물 공정정보 시각화를 위한 4D CAD시스템의 개발 및 적용사례 분석)

  • Kang, Leen-Seok;Yun, Seon-Mi;Kwon, Jung-Hui;Mun, Jin-Seok
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.4
    • /
    • pp.373-380
    • /
    • 2007
  • Recently, various 4D CAD systems for visualizing construction schedule data are being developed. Specially, in case of railway project, the numerical information of progress data should be changed with visualized data by long construction section because the railway project consists of long length in construction site. This study suggests a case study of development of 4D CAD system for visualizing schedule information and the major functions of developed system are verified by railway project. The detailed application procedure of 4D CAD system including input data for a railway project is described in the study. The practical application of 4D CAD system can be improved in railway project by these demonstration researches.

Development of Telepresence System for Schedule Management in Railway Construction Project (철도시설공사의 현장 공정관리를 위한 원격 영상 운영체계 개발)

  • Kang, Leen-Seok;Kim, Hyeon-Seung;Park, Jin-Jung;Moon, Hyoun-Seok;Shin, Min-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.1
    • /
    • pp.23-30
    • /
    • 2010
  • In the construction phase, the existing schedule management system by 4D CAD has been difficult to check for a status and progress of construction product in real-time because it simulates only VR (virtual reality) object based on a planned schedule. This study suggests a construction schedule management system by telepresence technique that can visualize progress status in real-time by using 4D CAD system based on remote monitoring. The telepresence methodology and system were developed in the study and they were verified for a railway construction project. The developed system can examine the status and progress of construction because it can compare 4D simulation based on planned schedule with real-time site images through web-camera.

A Study on the Improvement of Railway Construction Schedule Using KTX Construction Case (경부고속철도 사례분석을 통한 철도건설공기 개선에 관한 연구)

  • Yang, Yeonjong;Chung, Byunghyun
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.6
    • /
    • pp.662-669
    • /
    • 2012
  • In 2004, KTX operated in Korea on the 5th in the world. But there are various factor on planed schedule delay of Big National Construction Project like Seoul-Busan High Speed Rail Project(Seoul-Busan HSR). For example, Often change of government policy, project management control problem of design and construction, conflict of interested party like environmental organization/resident are the main delay factors. The suggestions for improvement of the construction schedule through the Seoul-Busan HSR will help to make a new leap forward in rail construction.

A pragmatic algorithm for the Minimum Railway Stock Maintenance Routing Problem (최소차량운용문제에 대한 실용적 해법)

  • Hong Seong-Pil;Kim Gyeong-Min;Lee Gyeong-Sik;Park Beom-Hwan;Hong Sun-Heum
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.25-32
    • /
    • 2006
  • Given a schedule of train to be routed by a Railway Stock, Railway Stock Routing Problem determine a sequence of train while satisfying turnaround time and maintenance restrictions. The objective is to minimize the Railway Stock during a week and each day simultaneously. And we prove that Railway Stock Routing Problem with maintenance restrictions is NP-hard. In this paper, we present two stage approaches that solve the Railway Stock Routing Problem in a reasonable time. In first stage we relax maintenance restrictions and formulate as a Min-cost-flow problem. Then, in the second stage, we attempt to satisfy maintenance restrictions using ours heuristic algorithm. We show the computational result of applying to an actual train schedule data.

  • PDF

A Study on Technology Trend according to Schedule Speed Improvement (표정속도 향상에 따른 기술동향 연구)

  • Lee, Hoon-Koo;Lee, Nam-Hyeong;Choi, Kyoung-Sun;Pyeon, Seon-Ho;Eum, Ki-Young
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.140-144
    • /
    • 2011
  • As a result of that the domestic railway technology has been progressed as times go by, the 1st and the 2nd steps for Gyeongbu HSR at the speed of more than 300km/h, were completed and Honam HSR - its operational speed is 350km/h - is under construction. Additionally, As a part of the expressization project for general lines, the Seoul-Chuncheon route at the speed of more than 180[km/h] is under construction and the Jeolla route is under design. At present, 11 countries (e.g. France, Germany, Belgium, Italy, the Netherlands, Spain, England, Japan, China and Taiwan) including Korea have high speed railways operated at the speed of more than 300[km/h]. As shown in the above, the domestic railway has high speed trains as good as those of countries outside Korea, but the schedule speed, which is calculated by dividing distance to destination by time, is lower than that of overseas trains. For overseas railway, the ratio of schedule speed to the highest speed is above 65%, while that of domestic railways is over 50%. It shows a significant difference between them. It is expected that the schedule speed improvement will increase the number of train operation and line capacities than now, so it shall achieve smooth transportation flow and improve the passengers' satisfaction. In this paper we describe the necessity for the improvement of schedule speed, by analyzing foreign cases related to the improvement of schedule speed in order to satisfy the increasing traffic demand.

  • PDF

A Method for Schedule Simulation Considering Rework and Uncertainty (재작업과 불확실성을 고려한 일정 시뮬레이션 방법론)

  • Kim, Chan-Mook;Park, Young-Won
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.1
    • /
    • pp.135-143
    • /
    • 2009
  • The majority of development projects fail to meet their target schedule and cost, with the overrun typically between 40 and 200 percent. These overruns happen because the planners underestimate the work or do not consider the need to rework at project planning. Representative schedule planning/management techniques such as Gantt Chart, PERT/CPM etc. that are used in domestic project planning are unable to reflect rework. This paper proposes a method to consider rework to provide more realistic estimates at schedule planning. Additionally, to prevent the underestimation of the work this paper proposes a simulation method that calculates a probabilistic estimated schedule and the associated variance based on the random variable modeling of individual task completion dates.

An Exploratory Development of Mathematical Programming Model for the Railway Conflict Resolution Problem on a Single Line Track (단선구간 열차경합해소 문제를 위한 수리계획 모형의 기본설계)

  • Oh Seog-Moon;Hong Soon-Heum;Kim Jae-Hee
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.4
    • /
    • pp.314-320
    • /
    • 2005
  • This paper is designed to help train dispatcher resolve railway conflicts in rent-time. We developed a mixed integer programming model to optimize the train schedule that determines the best overtaking or crossing positions, The objective of the model is to minimize the maximum lateness of the trains and reduce the total sum of the lateness, while satisfying the field constraints associated with the difference between passenger trains and freight trains, and the limited number of sidings. We applied the model on a portion of a single line track, Joong-Ang Line to ascertain the efficiency of the model, and showed how the model can be used to resolve the railway conflicts. The results indicates that our model can provide useful results in terms of optimal schedule for the test problem. This type of modeling approach would be useful for a train dispatcher to make a real-time railway conflict resolution.

A study on profitability of train schedule planning (열차공급계획의 수익성 분석에 관한 연구)

  • Woo Hee-Moon;Jang Seong-Yong;Kim Dong-hee
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1538-1545
    • /
    • 2004
  • In the train schedule plan corresponds to a master plan for transport services. This service plan must be constructed to minimize operational cost or maximize revenue considering transportation demands and resource capacities in the operation company, and it includes several sub-planning activities such as train operation frequency plan, train schedule plan, train capacity assignment plan, and rolling stock requirement plan. In this paper, we present profitability evaluation system for the current train schedule plan. The proposed system can be used for evaluating profitability by estimating train service revenue considering customer demands.