A Train control system is intended to assure train operation safety and to improve train operation efficiency. To perform these missions, the Train Control System consists of train safety space control part, train route control part and train operation management part. Train control technology changed from track circuit based to wireless based. And Wireless based train control technologies were developed by some railway signaling companies in Korea. To commercialize these control technologies, the development project is carried now. This project did analyze system requirements, and made the system development specification. Now this project finished system functions allocation, which will be performed by some subsystem. This paper describes roles of each function and the allocation of these functions to each subsystem.
IEC 62278 presents a process to implement a consistent approach to the management of reliability for railway applications. A reliability program has to be established at the outset of a project in order to manage reliability activities effectively through the life cycle. The first step of the reliability program is to evaluate reliability requirements and targets based on the system specifications. The system specifications are derived from the customer's needs. The way in which the system requirements reflect the customer's needs is strongly dependent on the characteristics of the product. In general the customer of commercial trains presents the system requirements from their needs. However, the relation between the customer and supplier is equivocal for a project to development a prototype train, and the reliability program should be different from that of an usual commercial project. This paper deals with a process to manage reliability activities for the development of a protype train based on the experiences obtained from the development of the Korea High-Speed Train: Hanvit-350.
The objectives of this paper are to introduce the PI(Public Involvement) in railway project and case study about public participation in decision making process for Ko-Yang light rail line development, besides to emphasize the importance of information considering the difference of resident location, regional character and so on are investigated before and after public participation. As the results, it was clarified about PI activities styles that consensus is not achieved in Ko-Yang public participation, the psychological factor such as the knowledge and satisfaction, receptivity about light rail project strongly is affected to making decision.
Kwon, Sam-Young;Park, Chun-Soo;Cho, Yong-Hyeon;Lee, Ki-Won;Park, Young
Proceedings of the KSR Conference
/
2008.06a
/
pp.428-432
/
2008
The next Korean high speed train development project is started. In testing stage of this project, the 400km/h maximum speed test will be conducted. In Korean railway infrastructure conditions the 400km/h seems to be a critical speed especially in the aspect of the overhead contact lines. The current collection performance of the 400km/h which is predicted by dynamic interaction simulation are described in this paper. To discuss the permissible criteria of contact forces, displacements and percentage contact loss, the French 575km/h current collection conditions are simulated. Furthermore, review of the simulation results of the Korean 400km/h current collection conditions is conducted through comparison with that of the French 575km/h.
This study is about a feasibility study for the practical using Urban Transit Maglev system based on systems engineering. First of all we defined what phase is matched with the project for feasibility study in the system life cycle and identified tasks that shall be done in the phase. Finally we suggested how to do in this project. The Urban Transit Maglev system is not wholly new system. It has similar architecture to a legacy urban railway system. But it is the system that is partially introduced new technology, because there are many projects have this characteristic within the country, we expect that this study may provide references.
The first task for the development of a train system is to define the system and to determine its requirements. Reliability target is one of the requirements defined in the system requirements. In railway applications it is advised to follow the procedures given in IEC 62278 to fulfill reliability requirements. The reliability requirements are derived from the customer's needs. The way in which the system requirements reflect the customer's needs is strongly dependent on the characteristics of the product. In general the customer of commercial trains presents the system requirements from their needs. However, the relation between the customer and supplier is equivocal for a project to development a prototype train, and the reliability program should be different from that of an usual commercial project. This paper deals with the reliability management and assessment plan carried out for the on-going "Next generation high-speed train development project".
Research and development project for the gearboxes of Korea High Speed Train is being run as one of the 'G7 Project' to achieve the Technical Independency in the area for the High Speed - High Load Gearboxes. Executing this project we domesticate the technologies for Design, Analysis, Manufacturing and Testing. Acquired high-technologies can be applied not only to the Rolling Stocks, but also to other Industrial Areas including the Cars and Aerovehicles. The prototypes had been tested on the roller rig and are being tested on the railway.
Since 1996, the G7 R&D and High-Speed Rail development project have been accomplished and it will be completed in 2007. During that time, we have achieved the origin design technique based on technique development experience. However, in order to magnify and to promote the growth of the origin design technique for railway industry to be a growth motive industry in future from intensive speed elevation and new technique competition of advanced nations, we need to prepare the next generation high-speed rail technique and to sustain expansion of the technique with getting hold of new technique tendency of the world. Therefore, this paper make research into necessity of the next generation high-speed rail development project, making an analysis of foreign countries cases and forward plan.
This paper shows the systematic design technology for development of new high speed rolling stock and the important item by the instance of G7 R&D project titled "Development of High Speed Railway Technology". This paper also describes core technology and concrete examples of its application during the development of high speed rolling stock.
Recently the Korean Government is increasing investment and interest on railway in the transportation field as "low carbon and green growth" policy become main national development strategy. While railway competitiveness is weakening over the road from the inconvenient door-to-door and transfer system of railway, it is meaningful to review excellent railway transfer system of advanced countries and adapt their implications for Korea. Their transfer systems like Japan, Hongkong, France, U.K. and German can be categorized in this research as kinds of transfer & connectivity system and transfer facility & flow planning, and, as a result, their implications can be concluded. Also, analyzing transfer system of Korea's main stations and reviewing the difference between Korea and other countries, this paper suggests main principles and directions of urban planning, alignment of rail line, partnership of project stakeholder in the establishment of transfer system in the railway station in the future.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.