• Title/Summary/Keyword: Railway Project

검색결과 575건 처리시간 0.027초

철도종합안전프로젝트를 위한 시스템엔지니어링 적용 체계 연구 (A Study on the Application System of the Systems Engineering for the Railway Total Safety Project)

  • 최요철;조연옥
    • 한국철도학회논문집
    • /
    • 제9권4호
    • /
    • pp.487-492
    • /
    • 2006
  • This paper presents the Case of Systems Engineering Application for the Railway Total-Safety Project. Key points to consider for project are: 1) Establish the SE Based-Project organization system, 2) Define the SE Activities, 3) Manage technically the SE Based-Project, etc. They were of much help that the Railway Total-Safety Project which were efficiently implemented and managed. As I take it, the Systems Engineering is very reasonable approach for the systematical and technical conduct of a project.

Benefits of Early Stakeholder Involvement in Korean Railway Infrastructure Project

  • KANG, SungWook;KIM, DongHee;YU, JaeKyun;LEE, KyungChul;MOON, DaeSup
    • 융합경영연구
    • /
    • 제9권5호
    • /
    • pp.15-25
    • /
    • 2021
  • Purpose: In the Korean railway infrastructure process, contractors and operators are involved at a later stage, which results in significant inefficiency. This study examines the benefits of early stakeholder involvement in Korean railway infrastructure projects and provides practical guidelines. Design, data and methodology: Literatures and foreign cases are analyzed. Building on the new product development model, we derive propositions explaining the relationship between early stakeholder involvement and the performance of Korean railway infrastructure project. Results: Major propositions include that early involvement of contractor has a positive effect on the project performance by shortening the infrastructure construction period and that early involvement of railway operator has a positive effect on the project performance by improving the effectiveness of railway infrastructure. Four requirements for the success of early stakeholder involvement are addressed. Conclusions: This study suggests that early stakeholder involvement shortens the construction period and improves railway infrastructure effectiveness. Academic contribution is to present the framework on railway infrastructure projects as holistic interactions among stakeholders. Practical contribution is to provide railway policy makers and other business practitioners with policy guidelines to improve railway infrastructure project process and to recommend an open access to relevant data.

편익귀속을 고려한 철도사업의 평가방법론에 대한 고찰 (Review of Railway Projects Evaluation Methodologies considering the Benefit Incidence)

  • 정병두;박정욱;김경철
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1999년도 추계학술대회 논문집
    • /
    • pp.65-72
    • /
    • 1999
  • In this paper, we reviewed the evaluation methodologies of railway project considering the benefit incidence. Generally railway projects are much more reduced tile energy consumption, traffic accident and environmental pollution than road projects. But conventional B/C analysis of railway project does not measured including those benefits. Also there is a few attention to an incidence of benefits producing from railway construction. So we developed the evaluation method of railway project contained the railway oriented benefits and also considered of the benefit incidence producing from railway construction.

  • PDF

건설시설물 공정정보 시각화를 위한 4D CAD시스템의 개발 및 적용사례 분석 (Development and Case Study of 4D CAD System for Visualizing Schedule Data of Construction Project)

  • 강인석;윤선미;권중희;문진석
    • 한국철도학회논문집
    • /
    • 제10권4호
    • /
    • pp.373-380
    • /
    • 2007
  • Recently, various 4D CAD systems for visualizing construction schedule data are being developed. Specially, in case of railway project, the numerical information of progress data should be changed with visualized data by long construction section because the railway project consists of long length in construction site. This study suggests a case study of development of 4D CAD system for visualizing schedule information and the major functions of developed system are verified by railway project. The detailed application procedure of 4D CAD system including input data for a railway project is described in the study. The practical application of 4D CAD system can be improved in railway project by these demonstration researches.

경전철사업에서의 철도전문기관과 지자체 간의 협력사례 (Cooperation Case between Railway Specialized Authorities and Local Government in LRT Project)

  • 송재일
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.2217-2224
    • /
    • 2011
  • The railway industry has well developed with Korea's economic growth as follows - Industrial railway's electrification in 1973, Seoul subway opening in 1974, Busan subway opening in 1985, High speed railway opening in 2004. But LRT as city transportation means has been faced with many difficulties. Looking at the LRT projects implemented until now, there are some issues like the transportation demand, the quality & safety of RS and facilities, the poor management of inhabitant complaints and the failure to maintain policy coherence. They have caused not only the project schedule to extend but also the project costs to increase, even to obstruct the project progress itself in some cases. These risk factors become the obstacle of LRT project's success, but it is said that more basic problem is the lack of risk management capability of competent authorities in railway business. Under these circumstance, Railway specialized Authorities and Local government have cooperated to identify various risk factors and to prepare the measures in advance, so we try to introduce this cooperation case, which will help other local government as an useful reference.

  • PDF

철도투자 효율성 향상을 위한 투자전략에 관한 연구 (A Study on the Investment Strategy that improves the Rail-infrastructure Investment Efficiency)

  • 김성;이종국;김윤양
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1574-1586
    • /
    • 2008
  • Railway is the most effective transportation than any other traffic. But due to the its expensive maintenance fee and various components like roadbed, rail, rollingstock, electric and signal etc, the construction cost of the railway is usually higher than highway. Such a reason, a lot of cost and period are needed to complete the railway project. In addition that considering the decreasing of the SOC budget, the investment in the railway industry is getting hard than ever. This study analyzed the cost, term of work, freight & passenger transportation demand of the wide area railway electrification project and main line improvement project. And it compared the estimation value and real value of the projects like cost and period etc. And this study surveyed the economic feasibility including factors which are not considered in the feasibility study guide. With those results, This study suggest the project management and evaluation method to enlarge the efficiency of the railway construction project.

  • PDF

시스템 엔지니어링을 적용한 철도종합안전기술개발사업의 2차년도 성과물 검증 기준 및 결과 (Verification specifications and results of the railway total safety technology development project adopting systems engineering)

  • 한순우;윤혁진;신정무;김상암;조연옥
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1209-1215
    • /
    • 2007
  • To establish the national railway safety system, the railway total safety technology development project has been promoted by Ministry of Construction and Transportation (MOCT) since August 2004. The project is mainly focused on the prevention of a critical railway accident and the reduction of accident/mortality rate. To achieve its goal effectively, the project is composed of 15 sub-projects each of which can be categorized into three different technological area. This work deals with the verification results for the outcomes of the sub-projects carried out at the 2nd year of the project. A new verification procedure is developed and applied to the project based on the system engineering. Three criterions - The suitability of the realization of a function, the suitability of a physical structure, the suitability of a design analysis report - are used for the verifications. The verification results are investigated by calculating standard deviations of scores of each results.

  • PDF

고속전철용 네트워크(TCN) 분석 Tool (TCN Analyzer for Korea High Speed Railway)

  • 전정우;정판규;김용주
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 A
    • /
    • pp.480-482
    • /
    • 1999
  • TCN standard has been applied to international train for provision of interoperability among European countries. In this paper, several TCN analyzers developed by European companies are introduced and the urgent need of TCN project engineering tool is emphasized for Korean High Speed Train.

  • PDF

한국형 고속전철용 신호시스템의 실험실 시험을 위한 통합 신호시스템 (Integrated Railway Signaling Systems for Laboratory Testing of Next-generation High-speed Train)

  • 황종규;이종우;박용진
    • 전기학회논문지P
    • /
    • 제53권1호
    • /
    • pp.32-39
    • /
    • 2004
  • Railway signaling systems consist of several vital computerized equipment such as CTC(Centralized Traffic Control), EIS(Electronic Interlocking System), ATC(Automatic Train Control) and so on. Currently, the project for development of railway signaling systems for the next-generation high-speed train is progressed according to the G7 project and railway signaling related several companies and research institute are joined this project consortium. The railway signaling systems, being developed in this project, called as a kTCS(Korean Train Control System), is composed of kTCS-CTC, kTCS-IXL, kTCS-ATC and etc. kTCS signaling systems have to be operated at the laboratory testing level as integrated signaling systems by interface between each railway signaling systems before railway field installation and revenue service. To solve this matter, communication protocols between each signaling equipment are designed and message codes for each defined protocols have defined. And also several equipment has developed for the railway integrated signaling systems for laboratory testing. We has plentifully tested and verified the designed protocols and the characteristics of integrated railway signaling systems with our developed each kTCS signaling equipment and communication protocols. In this paper, the integrated kTCS system including communication protocols is presented.

철도안전프로젝트에 적용한 시스템엔지니어링 관리계획서 작성에 관한 연구 (A Study on the Systems Engineering Management Plan for the Railway Safety Project)

  • 최요철;조연옥
    • 한국철도학회논문집
    • /
    • 제9권4호
    • /
    • pp.482-486
    • /
    • 2006
  • The Systems Engineering Management Plan (SEMP) is the primary, top level technical management document for the integration of all engineering activities at the project plan phase. This document defined the activities to plan, control, and perform overall engineering integration. To develop the SEMP for Railway Safety System, several standards are reviewed and analyzed. And then a common requirement for SEMP preparation is derived from the results of analysis. Also, the SEMP example available practically applies to Railway Safety System. In particular, The SEMP focused on controling technical program management has been organized so far, but in this study the detailed contents of SEMP put stress on project management is derived. And it is related to each other between project management and technical engineering management. At the end, to continuously manage the items and contents of the SEMP, a database management and an automatic document generation system is presented using Computer-Aided Systems Engineering (CASE) tool.