• Title/Summary/Keyword: Railway Conflict Resolution Problem

Search Result 8, Processing Time 0.02 seconds

A Pilot Study to Deploy the Railway Conflict Detection and Resolution System in Korean Railway (열차경합 검지 및 해소시스템의 한국철도 적용에 관한 선행연구)

  • 오석문;홍순흠;최인찬
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.2
    • /
    • pp.71-76
    • /
    • 2004
  • In this paper, we propose a pilot study to deploy the Railway Conflict Detection and Resolution System(RCDRS) in the context of Korean Railway(KORAIL). KORAIL plans to deploy in near future RCDRS, which is a decision support module placed on the top level of the Railway Traffic Management System(RTMS). This study entails the review of the state-of-art researches and projects in the field of the railway traffic management, as well as the analysis of the traffic characteristics of the major railroad lines in KORAIL. The analysis provides a basis to choose a solution approach for the railway conflict detection and resolution problem that each individual line faces. This study plays a role as a pilot study for a full systematic approach, in which interactions between lines require further advanced analysis to take the entire KORAIL lines into consideration rather than a myopic approach.

A Study on GA Approach for the Railway Traffic Conflict Resolution (열차경합 해소에서 유전자 알고리즘의 적용에 관한 연구)

  • 오석문;홍순흠;김성호
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.128-134
    • /
    • 2002
  • This paper is to investigate adoptability of the genetic algorithm to the railway traffic conflict resolution problem. We categorize the problem in two cases, one is the specific-boundary case and the other is not. GA is may be used in the first case, but not for second case. For a sample problem, an GA is designed, and the GA is being compared with Ho's.

  • PDF

An Exploratory Development of Mathematical Programming Model for the Railway Conflict Resolution Problem on a Single Line Track (단선구간 열차경합해소 문제를 위한 수리계획 모형의 기본설계)

  • Oh Seog-Moon;Hong Soon-Heum;Kim Jae-Hee
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.4
    • /
    • pp.314-320
    • /
    • 2005
  • This paper is designed to help train dispatcher resolve railway conflicts in rent-time. We developed a mixed integer programming model to optimize the train schedule that determines the best overtaking or crossing positions, The objective of the model is to minimize the maximum lateness of the trains and reduce the total sum of the lateness, while satisfying the field constraints associated with the difference between passenger trains and freight trains, and the limited number of sidings. We applied the model on a portion of a single line track, Joong-Ang Line to ascertain the efficiency of the model, and showed how the model can be used to resolve the railway conflicts. The results indicates that our model can provide useful results in terms of optimal schedule for the test problem. This type of modeling approach would be useful for a train dispatcher to make a real-time railway conflict resolution.

The Train Conflict Resolution Model Using Time-space Network (시공간 네트워크를 이용한 열차 경합해소모형)

  • Kim, Young-Hoon;Rim, Suk-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.6
    • /
    • pp.619-629
    • /
    • 2015
  • The train conflict resolution problem refers to an adjustment of the train operation schedule in order to minimize the delay propagation when a train conflict is predicted or when a train conflict occurs. Previous train studies of train conflict resolutions are limited in terms of the size of the problems to be solved due to exponential increases in the variables. In this paper, we propose a train conflict resolution model using a time-space network to solve the train conflict situation in the operational phase. The proposed model adjusts the size of the problem by giving only the dwell tolerance in the time-space network only for stops at the station after a train conflict. In addition, the proposed model can solve large problems using a path flow variable. The study presents a train delay propagation analysis and experimental results of train conflict resolution assessments as well using the proposed model.

A Review on Field Constraints for Railway Conflict Detection and Resolution Problem; focusing on the Korean Regional Railway System (열차경합 검지 및 해소 문제를 위한 현실제약의 고찰: 한국철도의 사례를 중심으로)

  • Oh Seog-Moon;Kim Jae-Hee;Hong Soon-Heum;Park Bum-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1374-1378
    • /
    • 2004
  • Railway conflict detection and resolution problem (RCDRP) involves complicated field constraints that should be considered for practical service. In this paper, we address those constraints in brief. Particularly, following situations are addressed; (1) temporal change of network topology, (2) consideration of diverse conditions of track and train, for example, single/double tracks and passenger/freight service, (3) siding capacity limitation, (4) bidirectional sides used by both inbound and outbound trains, (5) regulation for passenger transfer service, (6) consideration of siding length, (7) Restriction on stopping before the track segment with steep slope.

  • PDF

Design of Decision Support Systems for Railway Conflict Resolution Problem using Expert Systems (전문가 시스템을 이용한 열차경합 해소를 위한 의사결정 지원 시스템 구축)

  • Kim Tack-Ryoung;Lee Sang-In;Park Jin-Bae;Joo Young-Hoon;Hong Hyo-Sik;You Kwang-Kyun
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.1054-1059
    • /
    • 2005
  • 본 논문은 철도청 사령실 통합 신호설비 구축사업에 적용할 열차 경합의 효과적인 해소 기법을 제시하고자 한다. 열차경합의 검지 및 해소 시스템 (Railway Conflict Detection and Resolution System)은 열차 운행관리 시스템(Railway Traffic Management System, RTMS)의 의사결정 지원 모듈이다. 이 모듈은 열차운행의 정시성을 유지하기 위하여 매우 중요한 기능을 수행하고 있다. 하지만 현재 5개 지역본부별로 나뉘어서 기능이 수행되고 있고, 사령의 경험에 의하여 수작업 형태로 이루어지고 있기 때문에 전체 시스템의 관점에서 보면 최적의 해소안이 도출되고 있지 못하다. 따라서 본 논문에서는 시스템을 전역적으로 고려하여 최적의 해소안을 제시하고자 한다. 또한 최적화의 개념을 도입하기 위하여 6가지의 가중치를 설정하고, 이 가중치를 고려한 지연시간의 합을 목적함수의 값으로 설정한다. 본 시스템은 이러한 가중치의 합을 최소로 하는 복수의 해소안을 제시한다.

  • PDF

A Study on the Railway Traffic Conflict Resolution Problem using GA (유전자 알고리즘을 이용한 열차경합 해소문제에 관한 연구)

  • Oh, Seog-Moon;Kim, Young-Hoon;Kim, Sung-Ho;Kim, Dong-Hee;Hong, Soon-Heum
    • Proceedings of the KIEE Conference
    • /
    • 2002.07d
    • /
    • pp.2736-2739
    • /
    • 2002
  • This paper is a study on the railway traffic conflict resolution(RTCR) using genetic algorithm(GA). Using GA, many complicated problems can be expressed in the easy way, and good solutions can be found in a reasonably short time. Due to the above merits, we focus to GA first of all. We express the sample RTCR problem and algorithm of Korean railroad using GA. From the Mark Ho's[2,3] results, we introduce a chromosome scheme in addition.

  • PDF

An Exploratory Development of Railway-timetable Rescheduling Model Considering Transferring Service between KTX and Conventional Train on a Double Line Track (KTX열차와 일반열차 간 접속대기를 고려한 복선구간 열차시각표 재수립 모형의 기본설계)

  • Kim, Jae-Hee;Oh, Seok-Moon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.6
    • /
    • pp.1337-1345
    • /
    • 2009
  • In the railway, the delay of a train may affect the schedule of other trains. Hence, the timetable management activity involving overtaking and transferring becomes an important issue. The timetable rescheduling is the conflict resolution of the disrupted schedule and a matter of deciding the sequence of moves among trains and the place for meeting. In Korea, there are few cases where operations research models were applied to railway timetable rescheduling problem in consideration of the transfer between Korea Train eXpress (KTX) trains and conventional trains. Hence, we present a mathematical approach that can minimize the total delay of the whole trains secondly. We applied the model to the exemplary section of a double-line track, the Gyung-Boo Line, and it is confirmed that the mathematical model could effectively address the transfer service as well as the complicated railway conflicts of Gyung-Boo Line.