• Title/Summary/Keyword: Railroad-tunnel

Search Result 233, Processing Time 0.026 seconds

Performance evaluation of lattice girder depending on the quality of steel (강재 품질에 따른 격자지보재의 성능평가)

  • Jung, Hyuk-Sang;Shin, Young-Wan;Song, Ki-Il;Shin, Jong-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.2
    • /
    • pp.165-173
    • /
    • 2016
  • This paper dealt with contents on the performance evaluation of standardized steel and non-standardized steel of lattice girder. Lattice girder is arch type tunnel supports made of structural steel bar and it is girder used to ensure the stability of tunnel by suppressing any transformation of ground as much as possible during tunnel excavation. The performance evaluation of lattice girder can be conducted through bending strength test, tensile strength test and tunnel standard specification specifies that welding structural steel with over 500MPa yield strength shall be used. However, it is difficult to distinguish visually between standardized steel and non-standardized steel onsite if low-quality structural steel is used. Accordingly, this paper conducted performance evaluation of standardized steel and non-standardized steel of lattice girder to point out the issue of deteriorated yield strength of non-standardized steel, while proposed a method of verifying yield strength onsite.

Investigation of Subsurface Deformations for the Shallow Tunnel In A Granular Mass Using Two-Dimensional Laboratory Model Test and Numerical Analysis (2차원 실내모형실험과 수치해석을 이용한 사질토 지반의 얕은 터널에 대한 지중변형에 대한 규명)

  • Lee, Yong-Joo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.219-228
    • /
    • 2006
  • In urban areas, tunnelling induced ground deformations, particularly ground settlements should be considered in order to minimize the damage of adjacent structures. Therefore, an appropriate monitoring system for the tunnel construction should be setup at the planning or design stage. A number of studies on ground settlements due to tunnelling in soft ground have been carried out so far. However, most studies have focused on clay soil rather than sand soil. In particular, a few studies on behaviour of subsurface deformations in granular material have been reported. In this study, two-dimensional laboratory model test with aluminium rods regarded as continuum granular material and close range photogrammetric technique, and numerical analysis were carried out in order to identify the behaviour of subsurface deformations due to shallow tunnelling. Direction and magnitude of displacement vectors from the model test was identical to the numerical analysis. In particular, the vector direction was appeared to be toward a point below the tunnel invert level. A narrow 'chimney or tulip like' pattern of vertical displacement was confirmed by both the model test and numerical analysis. This is consistent with the field data. In addition to the qualitative comparison, the quantitative comparison of subsurface settlements according to 2D volume loss showed good agreement between the model test and numerical analysis. Therefore, close range photogrammetric technique applied in the model test may be used to validate the result from the continuum numerical analysis.

  • PDF

Structural Stability Analysis Study for Existing Subway Tunnels Using a 3D Stress-Pore Pressure Coupled Finite Element Modelling of NATM Tunneling (NATM 터널굴착시 응력-간극수압 연계 3차원 유한요소모델링을 통한 기존 지하철터널의 구조적 안정성 해석연구)

  • Kong, Byung-Seung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.6 s.58
    • /
    • pp.192-203
    • /
    • 2009
  • In the new Seoul-Busan high speed railroad construction specially in area of city center passage the roadbed establishment is recommended the staibility for the existing subway tunnel segments of Busan subway 1st and 2nd lines regarding the appearance condition, a quality condition and the durability of the objective facility, and it evaluates the numerical analysis using MIDAS/GTS which leads the stability of the objective facility and investigatesd tunnels. Fundamental issues in tunneling under high groundwater table are discussed and the effect of groundwater on tunnel excavation was examined using a 3D stress-pore pressure coupled Finite-Element Method. Based on the results the interaction mechanism between the tunnelling and groundwater is identified. In the both of 1st and 2nd Line the maximum sinkage, unequal sinkage and the lining stress from numerical analysis are within permission and the damage degree is appearing to be disregarded. But it enforces necessary Pre-grouting in order to minimize an actual tunnel face conduct and when the tunnel is excavated it is also necessary to minimize the outflow possibility.

A probabilistic assessment of ground condition prediction ahead of TBM tunnels combining each geophysical prediction method (TBM 현장에서 막장전방 예측기법 결과의 확률론적 분석을 통한 지반상태 평가)

  • Lee, Kang-Hyun;Seo, Hyung-Joon;Park, Jeongjun;Park, Jinho;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.3
    • /
    • pp.257-272
    • /
    • 2016
  • It is usually not an easy task to counter-measure on time and appropriately when confronting with troubles in mechanized tunnelling job-sites because of the limitation of available spaces to perform those actions with the existence of disk cutter, cutter head, chamber and other various apparatus in Tunnel Boring Machine (TBM). So, it is important to predict the ground condition ahead of a tunnel face during tunnel excavation. Efforts have been made to utilize geophysical methods such as elastic wave survey, electromagnetic wave survey, electrical resistivity survey, etc for predicting the ground condition ahead of the TBM tunnel face. Each prediction method among these geophysical methods has its own advantage and disadvantage. Therefore, it might be needed to apply several geophysical methods rather than just one to predict the ground condition ahead of the tunnel face in the complex and/or mixed grounds since those methods will compensate among others. The problem is that each prediction method will give us different answer on the predicted ground condition; how to combine different solutions into a most reasonable and representative predicted value might be important. Therefore, in this study, we proposed a methodology how to systematically combine each prediction method utilizing probabilistic analysis as well as analytic hierarchy process. The proposed methods is applied to a virtual job site to confirm the applicability of the model to predict the ground condition ahead of the tunnel face in the mechanized tunnelling.

Physiological Status Assessment of Locomotive Engineer During Train Operation

  • Song, Yong-Soo;Baek, Jong-Hyen;Hwang, Do-Sik;Lee, Jeong-Whan;Lee, Young-Jae;Park, Hee-Jung;Choi, Ju-Hyeon;Yang, Heui-Kyung
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.1
    • /
    • pp.324-333
    • /
    • 2014
  • In this study, physiological status of locomotive engineers were measured through EEG, ECG, EDA, PPG and respiration signals from 6 subjects to evaluate their arousal status during train operating. Existence of tunnels and mechanical vibration of train using 3-axes acceleration sensors were recorded simultaneously and were correlated with operator's physiological status. As the result of the analyzed subjects' physiological signals, mean SCR was increased in the section where more body movement is required. The RR interval was decreased before and after train stop due to the higher level of mental tension. The intensity of beta wave of EEG was found to be higher before and after train stop and tunnel section due to the increased mental arousal and tension. Therefore, it is expected that the outcomes of the physiological signals explored in this study can be utilized as the quantitative assessment methods for the arousal status to be used for sleepiness prevention system for vehicles operators which can greatly contribute to public transportation system safety.

Analysis of Overhead Rigid Conductor Line for the Subway tunnel section (지하철 터널 구간 강체가선 방식의 특성분석)

  • Yim Geum-Kwang;Chang Sang-Hoon;Kim Wang-Gon
    • Proceedings of the KSR Conference
    • /
    • 2003.10c
    • /
    • pp.493-499
    • /
    • 2003
  • Railroad, a superior mode of public transportation provides safe, efficient, speedy, comfortable and economical service, has fundamentally different characteristics from airplanes, ships and cars. Among the unique characteristics of a railroad is the fact that it operates on fixed track with multiple car trains. The subway system was first selected as the best solution to difficult automobile traffic conditions and environmental problems. Seoul subway no.1line (Jongno line) was opened for service on August 15, 1974. Seoul city has completed and now operates eight subway lines (286.7km) since 1974. At present the subways operate in Busan, Daegu and Incheon city, and are under construction in Gwangju and Daejeon city. The power source for subway trains has been electricity since 1896, and power supply systems are the third rail type and/or the catenary system. The typical catenary system is the rigid bar type. R-bar and T-bar are used in the rigid bar type of catenary system, and the two types of R-bar and T-bar are uesd in Korea also. R-bar is used only for AC 25kV power supply and T-bar for DC 1,500V. From 30 years of subway experience I would like to suggest the most economic catenary system to ensure of safety, reliability and expediency for the railway lines to be constructed and the forthcoming replacement due to the life cycle after studying and analysing the characteristics, advantages and disadvantages of R-bar and T-bar.

  • PDF

Modeling of Old Masonry Lining in Railroad Tunnels (철도터널내 조적식 라이닝의 모형화에 관한 연구)

  • Lee, J.S.;Shin, H.K.;Kim, M.I.
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.3 no.3
    • /
    • pp.3-13
    • /
    • 2001
  • The behavior of the masonry lining is studied to gain basic information on how to reinforce the masonry tunnels. Apart from the previous works on the masonry structures, the multi-course masonry structure, realistic in field condition, is considered and the constitutive relationship of the masonry is, therefore, established. The design charts of the orthotropic material properties are proposed according to the stiffness ratio and the crack initiation and subsequent propagation model is also considered to model the brittle nature of the masonry. A numerical analysis on the masonry panel is investigated to verify the proposed model and future works of the masonry lining are briefly explained.

  • PDF

Study on Thermal Performance of Energy Textile in Tunnel (터널 지열 활용을 위한 에너지 텍스타일의 열교환 성능 연구)

  • Lee, Chulho;Park, Sangwoo;Sohn, Byonghu;Choi, Hangseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.5
    • /
    • pp.1907-1914
    • /
    • 2013
  • Textile-type heat exchangers installed on the tunnel walls for facilitating ground source heat pump systems, so called "energy textile", was installed in an abandoned railroad tunnel around Seocheon, South Korea. To evaluate thermal performance of the energy textile, a series of long-term monitoring was performed by artificially applying daily intermittent cooling and heating loads on the energy textile. In the course of the experimental measurement, the inlet and outlet fluid temperatures of the energy textile, pumping rate, temperature distribution in the ground, and air temperature inside the tunnel were continuously measured. From the long-term monitoring, the heat exchange rate was recorded as in the range of 57.6~143.5 W per one unit of the energy textile during heating operation and 362.3~558.4 W per one unit during cooling operation. In addition, the heat exchange rate of energy textile was highly sensitive to a change in air temperature inside the tunnel. The field measurements were verified by a 3D computational fluid dynamics analysis (FLUENT) with the consideration of air temperature variation inside the tunnel. The verified numerical model was used to evaluate parametrically the effect of drainage layer in the energy textile.

Analysis of the Current Collection Quality for Next Generation High-Speed Trains with Measurements of the Dynamic Contact Force (동적 접촉력 측정을 통한 차세대 고속열차의 집전성능 분석)

  • Oh, Hyuck Keun;Ji, Hyung Min;Kim, Young Guk;Kim, Seogwon
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.3
    • /
    • pp.157-164
    • /
    • 2014
  • The contact force between the pantograph and the catenary is a key factor determining the current collection quality, as they can ensure stable electrical power to the train. In this study, we analyzed the dynamic contact force for HEMU-430X depending on the train speed. It was confirmed through the results that the standard deviation of the contact force increases with an increase in the train speed. It was also verified that the span of the catenary system is a very important factor with regard to the contact force when analyzed with frequency analysis. To secure stable power in speed that exceeds 400km/h, the statistical variation of the contact force should be minimized. To realize this, the catenary tension was increased and the mass of the pan-head was decreased. The ensuing effects were then quantitatively analyzed in terms of the contact force. In addition, the differences in the contact force between a tunnel and an open field were analyzed based on a frequency analysis.

Analysis of Tuning Unit Characteristic for Track Circuit Maintenance Efficiency (궤도회로의 유지보수 효율화를 위한 동조 유니트 특성 분석)

  • Kim, Yong-Kyu;Baek, Jong-Hyen;Park, Jae-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.12
    • /
    • pp.3594-3599
    • /
    • 2009
  • The train control system used in Gyeongbu-line is classified in ATC, IXL and CTC. The ATC data related to speed and space control for trains are transmitted from wayside to onboard by way of UM71 AF track circuits and BSP Loop. The information transferred by track circuits is composed of operation data which directly influence to the train operation and the information transferred by BSP Loop is used in the section which requires the additional data transmission about the particular track-side environment such as tunnel, hot box detector or insulated section. In this paper, for the BA type turning unit of the UM71 AF track circuits which is mainly used in the linking section of existing and high-speed lines from the opening of the Gyeongbu line till the present, we not only analyze the characteristics of BA but also compare and analyze baseline values and the measured values. With this analysis, we will be able to propose how to solve the problems about operation and maintenance such as track circuit malfunctions of the relevant sections.