• Title/Summary/Keyword: Railroad site

Search Result 140, Processing Time 0.027 seconds

Study of Effectiveness of Signal Preemption Strategy using VISSIM (VISSIM을 이용한 Signal Preemption 전략도입 및 효과분석)

  • Jo, Han-Seon;O, Ju-Taek;Lee, Jae-Myeong;Park, Dong-Ju
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.4 s.90
    • /
    • pp.93-101
    • /
    • 2006
  • The signalized intersections near highway-railroad grade crossing are operated without signal preemption in Korea when trains are approaching the crossing. This signal operation is very dangerous because queues from the intersection can extend back over the track, thereby creating the Potential for a serious vehicle-train accident. And the queues from the crossing can extend to the intersection with the normal signal operation while trains Pass the crossing. In this case the intersection is disrupted, and delay and the Potential for vehicle accident increase highly In order to improve the intersection performance and Protect the accident the crossings and intersections. signal Preemption designed to provide a special control mode should be implemented. In this study it was shown that intersection Performance near highway-railroad grade crossing improved using signal preemption. When signal Preemption is implemented at the test site, the delay was reduced by about 9sec/veh. Even though there were vehicle-train accidents at the crossing in all 30 simulations without signal preemption. there was no vehicle-train accidents at all when signal preemption is used.

The Effects of Sand Compaction by Watering through Field Compaction Test and Numerical Analysis (현장 및 수치해석을 통한 모래 물다짐지반의 다짐효과 연구)

  • Chun, Byungsik;Jang, Younsoo;Kim, Kwanggyu;Park, Dukhyum;Sung, Hwadon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.6
    • /
    • pp.13-19
    • /
    • 2007
  • This study examines a cause for damage of synthetic resins straight pipe occurred after pipe construction of underground electric power duct pipelines of ${\bigcirc}$ section work, ${\bigcirc}$ line, ${\bigcirc}{\bigcirc}$ city railroad. For this, we analyzed a parameter used for plan and structural analysis through a literature review. And the site condition was analyzed in detail, and test construction of the pipe line that simulated the site pipe line and test on compaction by watering were performed. In addition, an examination on subsurface settlement influence of foundation ground through a structural safety and a numerical analysis of power transmission pipe line was performed. As a result of the performance, relative density gained by compaction by watering was more than average and relative degree of compaction according to technical specification standard showed the result of about 90% in the case of good compaction by watering.

  • PDF

Evaluation of Train Running Safety for Direct Fixation Concrete Track on Light Rapid Transit (경전철 직결식 콘크리트 궤도구조의 열차주행안전성 평가)

  • Choi, Jung-Youl;Kim, Jun-Hyung;Chung, Jee-Seung;Lee, Sun-Gil
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.5
    • /
    • pp.41-46
    • /
    • 2017
  • The coefficient of derailment and the rate of wheel load reduction were used as the index of train running safety that was directly affected the train derailment safety. In aspects of track, the train running safety depends on the complex interaction between wheel and rail, and the track-vehicle conditions (i.e., the curvature, cant, track system, vehicle speed and the operation conditions, etc). In this study, the relationship between the train running safety and the track curvature and vehicle speed for direct fixation concrete tracks currently employed in Korean light rapid transit was assessed by performing field tests using actual vehicles running along the service lines. The measured dynamic wheel load, lateral wheel load and lateral displacement of rail head were measured for same train running on four tested tracks under real conditions, which included curved and tangent tracks placed on the tunnel and bridge, thus increasing the train speed by approximately maximum design speed of each test site. Therefore, the measured dynamic track response was applied to the running safety analysis in order to evaluate the coefficient of derailment, the rate of wheel load reduction and the track gauge widening at each test site, and compare with the corresponding Korean train running safety standard. As the results, the lateral track response of direct fixation concrete track appeared to increase with the decreased track curvature; therefore, it was inferred that the track curvature directly affected the train running safety.

The Study of Monitoring System for Enhancement Electrical Point-machine Maintenance (전기선로전환기 유지보수 향상을 위한 모니터링 시스템의 연구)

  • Park, Jae-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.11
    • /
    • pp.3115-3120
    • /
    • 2009
  • An electric point-machine which changes over a turnout so that it enables a train to be operated in the routine that a train is to proceed has been installed and used in most of the railways such as not only urban railways but also main-line railways. Most of the maintenance works in this electric point-machine is that the maintenance workers manually measure motor power, control power and display power in the site with the use of portable counters. Especially in case of NS or NS-AM electric point machine, the maintenance cycle is so frequent that during the operation casualty accidents caused by carelessness occurs as well as more staff is required for this measurement. In this paper we propose a system for monitoring the state of electric point machine installed in the site to improve maintenance efficiency and it is expected that this monitoring system confirms any measured values on electric point machines in real-time and improves maintenance efficiency.

Comparative Study to Predict Power Generation using Meteorological Information for Expansion of Photovoltaic Power Generation System for Railway Infrastructure (철도인프라용 태양광발전시스템 확대를 위한 기상정보 활용 발전량 예측 비교 연구)

  • Yoo, Bok-Jong;Park, Chan-Bae;Lee, Ju
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.4
    • /
    • pp.474-481
    • /
    • 2017
  • When designing photovoltaic power plants in Korea, the prediction of photovoltaic power generation at the design phase is carried out using PVSyst, PVWatts (Overseas power generation prediction software), and overseas weather data even if the test site is a domestic site. In this paper, for a comparative study to predict power generation using weather information, domestic photovoltaic power plants in two regions were selected as target sites. PVsyst, which is a commercial power generation forecasting program, was used to compare the accuracy between the predicted value of power generation (obtained using overseas weather information (Meteonorm 7.1, NASA-SSE)) and the predicted value of power generation obtained by the Korea Meteorological Administration (KMA). In addition, we have studied ways to improve the prediction of power generation through comparative analysis of meteorological data. Finally, we proposed a revised solar power generation prediction model that considers climatic factors by considering the actual generation amount.

Evaluation on Field Application of Controlled Low-Strength Materials Made of Coal Ash in Reclamation Site (석탄회를 활용한 저강도고유동화재의 공유수면매립현장에 대한 적용성 평가)

  • Kong, Jin-Young;Jung, Hyuk-Sang;Cho, Sam-Deok;Kim, Ju-Hyong;Hyun, Jae-Hyuk;Chun, Byung-Sik
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.12
    • /
    • pp.27-39
    • /
    • 2012
  • This paper presented the strength and environmental characteristics of reclaimed-ground filled with controlled low-strength materials (CLSM) made of coal ash, small amounts of cement, and water in a reclamation site and evaluated the possibility of the use of coal ash on reclamation materials for beneficial use. Three-month period of SPT, CPT, environmental effects evaluation etc. were conducted. N values and cone resistances in ground filled with CLSM were greater than or similar to those in dredging sand. In case of land filled with coal ash except cement these values were lower than those in dredging sand. The results of soil and seawater pollution were lower than test criteria without high pH. Also the values of PH test were measured between pH 5.0~9.0, the criteria of industrial water in the Law for the Underground Water of Korea.

Dynamic Parameter Estimation of a CANDU Type Containment Using Ambient Vibration Measurements (상시진동을 이용한 CANDU형 격납건물의 동적파라미터 산정)

  • Choi, Sanghyun;Park, Sooyong;Hyun, Chang-Hun;Kim, Moon-Soo
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.2
    • /
    • pp.188-196
    • /
    • 2012
  • Dynamic parameters such as natural frequencies can provide global stiffness information of a structure, and thus be utilized in monitoring structural integrity of large structures such as a containment. To identify the dynamic parameters without interrupting normal operation, a modal analysis method based on ambient vibration measurements should be applied. In this study, dynamic parameters of the containment of Wolsong Unit 2 are identified using ambient vibration measurement data. The feasibility of the study is verified using a numerical model for the containment. From the modal analysis, dynamic parameters of the containment with acceptable correlation to analytical modes can be estimated.

Case Study Research in Earthwork Site Digitization for Smart Construction (스마트 건설을 위한 토공현장 디지털화 적용성 검증)

  • Park, Jae-woo;Kim, Seok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.22 no.5
    • /
    • pp.529-536
    • /
    • 2019
  • Recently, various efforts have been tried in the construction industry to improve productivity by applying the fourth industrial revolution technology. Among the various technologies, researches for the automation and digitization of earthworks are being carried out steadily. As the interest in the benefits of digitalization of the earthwork field has increased, there have been more cases of technology development and application for digitalization of the earthwork field. However, there is not enough case study to present the analysis results of application cases. The purpose of this study is to verify the feasibility of applying the digitization technology of the earthwork in actual worksite. In order to digitize the worksite terrain, it is required the process of field measurement, measurement data registration, earthwork information input, and analysis cell generation. Particularly, it is possible to achieve information-enabled digitization rather than digitalizing only the shape through the input of the earthwork information and the analysis cell generation. By using the digital information of the earthwork field, it is possible to visually recognize the change of the earthwork field, so that it is expected to enhance the worker 's understanding and to be highly applicable to the management work. It is expected that the digital technology of earthwork site will be able to know the precise amount of volume change of the earthwork numerically, and it will be highly applicable to construction management.

A Case Study on Blasting at the Tunnel Excavation in an Adjacent Section of a Subway Station (지하철역 인접구간에서의 터널 발파굴착 사례)

  • Lee, Hyo;Kim, Jeoung-Hwan;Hwang, Nam-Sun
    • Explosives and Blasting
    • /
    • v.40 no.2
    • /
    • pp.25-34
    • /
    • 2022
  • Recently, there has been an increasing number of cases of improving constructability by using electronic detonators with precise delay time in tunnel blasting sites. This case is a case of conducting test blasting using with non-electric detonator and electronic detonator at the site of 『Seoul Metropolitan Area Express Railroad Route A Private Investment Project Section 00』 that requires careful management of vibration and noise. Although this site was designed with a non-electric detonator, it was attempted to improve the advance rate and control vibration and noise by mixing the non-electric detonator and the electronic detonator due to the decrease in the advance rate. As a result of the blasting, the target value was achieved with an advance rate of about 85% and a maximum measured value of vibration and noise is 0.215cm/sec and 73.22dB(A) which were measured below regulatory standards. As blasting works in downtown areas, it is necessary to designate measurement and management objects to continuously manage vibration and noise.

perforation of tunnel in limestone formation (석회암층의 터널관통사례)

  • Kim, Yong-Il;Hwang, Nak-Yeon;Jeong, Du-Seok;Hong, Jong-Sang;Lee, Nae-Yong
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2007.03a
    • /
    • pp.64-80
    • /
    • 2007
  • This paper presents a case study on the excavation of a long tunnel(16.2km) named as "Sol-An tunnel", which connects between Mt. Dongbaek station and Dokye station in the Young-dong Railroad. This site is located in a complex geological region with faults, cavities and coal measures as sedimentary rocks area. It occurred geotechnical problems unexpectedly by running water when tunnelling in limestone area within those geological structures. This tunnel caused surface settlements through the decrease of ground water level and soil washed-out affecting by cavities and faults within limestone formation. This paper presents a analysis of source through a close investigation and measures. And also, does preventive measures about returns of settlements reflected by properties of limestones.

  • PDF