• Title/Summary/Keyword: Railroad Systems

Search Result 767, Processing Time 0.037 seconds

A STUDY ON THE AERODYNAMIC DRAG REDUCTION OF HIGH-SPEED TRAIN USING BOGIE SIDE FAIRING (고속열차 대차 측면 페어링 적용을 통한 공기저항 저감 연구)

  • Moon, J.S.;Kim, S.W.;Kwon, H.B.
    • Journal of computational fluids engineering
    • /
    • v.19 no.1
    • /
    • pp.41-46
    • /
    • 2014
  • The aerodynamic drag of high-speed train has been calculated and the effect of bogie side fairing on the aerodynamic drag has been investigated. Computational Fluid Dynamics (CFD) simulation based on steady-state 3 dimensional Navier-Stokes equation has been conducted employing FLUENT 12 and the aerodynamic model of HEMU-430x, the Korean next generation high-speed train under development has been built using GAMBIT 2.4.6. Three types of bogie side fairing configuration, the proto-type without fairing, half-covered fairing to avoid the interference with the bogie frame and full-covered fairing have been adopted to the train model to compare the drag reduction effects of the bogie side fairing configurations and the numerical results yields that the bogie side fairing can reduce the aerodynamic drag of the 6-car trainset up to 7.8%. The aerodynamic drag coefficient of each vehicle as well as the flow structures around the bogie system have also been examined to analyze the reason and mechanism of the drag reduction by bogie side fairing.

Design of Wheel Profile to Reduce Wear of Railway Wheel (곡선부에서 차륜 마모 저감을 위한 차륜답면 형상 설계)

  • Choi, Ha-Young;Lee, Dong-Hyong;Song, Chang-Yong;Lee, Jong-Soo
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.29 no.6
    • /
    • pp.607-612
    • /
    • 2012
  • The wear problem of wheel flange occurs at sharp curves of rail. This paper proposes a procedure for optimum design of a wheel profile wherein flange wear is reduced by improving an interaction between wheel and rail. Application of optimization method to design problem mainly depends on characteristics of design space. This paper compared local optimization method with global optimization according to sensitivity value of objective function for design variables to find out which optimization method is appropriable to minimize wear of wheel flange. Wheel profile is created by a piecewise cubic Hermite interpolating polynomial and dynamic performances are analyzed by a railway dynamic analysis program, VAMPIRE. From the optimization results, it is verified that the global optimization method such as genetic algorithm is more suitable to wheel profile optimization than the local optimization of SQP (Sequential Quadratic Programming) in case of considering the lack of empirical knowledge for initial design value.

Fatigue Life Evaluation of Motor Block Bracket Units for KTX-Sancheon Trains (KTX-산천 열차용 모터 감속기 고정대의 피로 수명 평가)

  • Lee, Chan-Woo;Lee, Dong-Hyong
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.29 no.6
    • /
    • pp.626-631
    • /
    • 2012
  • In this study, fatigue life of the motor block bracket units for KTX-Sancheon trains was assessed. Design evaluation for railway structures was performed based on the UIC 566 regulation, and test and evaluation of fatigue life in welded parts was performed in accordance with standard ERRI B 12/RP17 and ERRI B 12/RP60. The actual vehicle dynamic stress testing was executed in KTX-Sancheon service line with the service operating speed. The dynamic stress was measured with commercial data acquisition system (MGC plus). The cumulative damage was evaluated by applying standard BS 7608 - Class F and cycle counting was used rain-flow counting method. As a result, the motor block bracket units for KTX-Sancheon trains was designed to fit the regulation and the safety of fatigue life for 30 years, assuming that KTX-Sancheon trains travels 600,000km annually, were confirmed under current operating conditions.

Efficiency Review for the Evaluation Method and standard for High speed Railway Rail Fastening System (고속철도 레일 체결장치 성능 평가방법 및 기준검토)

  • Kim In-Jae;Kang Kee-Dong;Han Sang-Chul;Yang Shin-Choo
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.818-823
    • /
    • 2004
  • In case of the Korea Railroad, when we would decide the track structure, it has been introduced the whole track structure system based on only the foreign application cases and data offered by manufacturers without the process of the objective performance verification. The value of property for track materials, derived from the calculation of track structure, was hard to perform the objective performance evaluation among track structure systems because each manufacturer adopted the different test method and standard. To solve the above-mentioned problem, it should suggest the technical and objective evaluation method about the performance of track materials and meet with the standard of High Speed railroad and international railroad through the establishment and revision of performance standard. In the objective and technical respects, it will be a major role to decide the track structure. In this paper, I would like to summarize the case which was improved the problem of test method and standard exposed from the performance verification of Rail Fastening System among the track structure systems of High speed railroad.

  • PDF

Implementation Technique of Real-time Monitoring System for High-Speed Rail Contact Wire with High Tension (고속철도 전차선로 고장력 실시간 모니터링 기술 구현)

  • Cho, Yong Hyeon;Park, Young;Jung, Hyun Jin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.8
    • /
    • pp.1256-1261
    • /
    • 2015
  • Along with the increase of railway catenary system operation speed to 400 km/h, there have been growing demands for good quality current collection systems that satisfy quality standards as well as criteria for safe working. Retaining uniform elasticity tension of contact wires is essential in maintaining high quality contact between pantograph and OCL (Overhead Contact Line) of current collection systems in high speed railways. Therefore, the tension of contact wire must be kept within tight tolerance limits in both working conditions and adverse weather conditions of catenary system. In accordance with these conditions, this paper presents a real time monitoring system for the tensioning device of the newly installed catenary system on the special route of Honam high speed line for 400 km/h operation. For the verification of the true value of tension of contact wires, we have developed ring-type tensioning sensors which were installed on supporting points of mast which compose the catenary system. According to the field test performed on the Honam high speed line catenary system, variation of tension was measured accurately in real-time.

Demand and Schedule Operation Mode for Personal Rapid Transit

  • Hwang, Jong-Gyu;Kim, Baek-Hyun;Kang, Seok-Won;Jeong, Rak Gyo
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • v.2 no.3
    • /
    • pp.356-360
    • /
    • 2013
  • The PRT (Personal Rapid Transit) system is a new transportation system in accordance with the requirements of the passengers. Although this PRT system was proposed a long time ago, it did not hold the limelight due to the several limitations in technology. However, the research and development has been active again recently thanks to the development in technology and the review on its applicability as the means of transportation linking to the urban transit system. Although most of these recent studies in relation to the PRT are focused on the hardware such as PRT vehicles or track structures, etc., the operational aspect of it is more important than that of any other means of public transportation. Therefore, among studies on operational aspect of this PRT system, this paper shows the result of study on technology in relation to the movement of vehicle to the station where it was called by the passenger through interface of the wayside control center with the vehicle control system in case where the passenger calls a vehicle at the station.

Analysis of Utilizing Regenerative Energy in Railway System through a DC Power Supply Simulation (DC 급전시뮬레이션을 통한 도시철도 회생에너지 활용 분석)

  • Shin, Seungkwon;Jung, Hosung;Kim, Hyungchul;Park, Jongyoung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.10
    • /
    • pp.1479-1484
    • /
    • 2014
  • This paper deals with regenerative energy in railway system which one of the largest customer in terms of load capability. Unlike the other loads of power system, loads of railway systems change in time and space. It has a characteristic amount of generating regenerative energy by frequent starting and braking in railway system. Therefore, it is expected higher utilization in railway system than the other systems. The purpose of DC power supply simulation is analyzing backed energy, regenerative energy by each railway vehicle and substation. In this paper, regenerative energy utilization are analyzed using DC power supply simulation and it is performed changing major influence on the design such as the number of installing absorber, internal resistance value, no-load voltage value at substation or operating parameters at regenerative energy utilization. After simulating, results are compared and analyzed.

Study of the Metropolitan Rapid Transport System to Minimize Sidetrack Construction (대피선 최소화를 고려한 광역철도 급행화 방안 연구)

  • Kim, Moo Sun;Kim, Jungtai;Kim, Taesik;Park, Sung Soo;Hong, Jae Sung;Cho, Yong Hyeon;Min, Jai Hong
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.5
    • /
    • pp.402-409
    • /
    • 2013
  • In metropolitan railway systems, the average commuting time keeps increasing as the scheduled speed increases, and this leads to a decline of rail service usage and competitiveness. Therefore, effective express operation for urban trains is required to improve the scheduled speed. In this study, based on the obtainable time shortening efficiency and economic viability, several express operations are suggested for urban railways and these suggestions are compared by considering high performance trains with acceleration/deceleration and maximum speed improvement. As a result, the optimum express system, which can minimize the cost for sidetrack construction, is suggested.

Risk Analysis Method Applied to Train Control Systems for Safety Assurance (열차제어시스템 안전성 확보를 위한 위험도 분석 방법 적용)

  • Jo, Hyun-Jeong;Hwang, Jong-Gyu
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.5
    • /
    • pp.71-76
    • /
    • 2007
  • Failures of equipments for train control systems are linked directly to extensive damages of human lives or financial losses from the increasing uses of train control equipments utilizing computers. Then safety activities for assuring safety and reliability are needed during the system life-cycle. Risk analysis is important phase to increase safety from determining the risk presented by the identified hazard. In this paper, we investigated several methods for risk estimation of safety activities, and then we drew a comparison between original methods to suggest optimized one in the application to train control systems. In the result of the comparison, we had plan to propose the risk analysis method called Best-Practice(BP) risk method combining advantages of the qualitative and the quantitative analysis. In addition, we attempted to apply the BP-risk method to domestic train control systems handling in Korea.

Development and Application of Safety Activity Process for Railway Signaling Systems (열차제어시스템 안전성 활동 기술체계의 분석 및 적용)

  • Hwang, Jong-gyu;Jo, Hyun-Jeong;Han, Chan-Hee;Cho, Woo-Sick;Ahn, Jin
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.1
    • /
    • pp.93-101
    • /
    • 2010
  • As safety-related regulations for signaling systems are standardized to IEC 61508/62278/62425, and others at the international level, safety activities and its assessment are required to be performed. And also there is the need to develop technologies for safety improvement to secure safety signaling systems in terms of technologies for safety activities on each life-cycle. In this paper we have developed the safety activity processes and technologies each steps of proposed processes respectively for railway signaling systems. And the proposed process and technologies are applied to the safety activities for mock-up signaling systems.