The aerodynamic drag of high-speed train has been calculated and the effect of bogie side fairing on the aerodynamic drag has been investigated. Computational Fluid Dynamics (CFD) simulation based on steady-state 3 dimensional Navier-Stokes equation has been conducted employing FLUENT 12 and the aerodynamic model of HEMU-430x, the Korean next generation high-speed train under development has been built using GAMBIT 2.4.6. Three types of bogie side fairing configuration, the proto-type without fairing, half-covered fairing to avoid the interference with the bogie frame and full-covered fairing have been adopted to the train model to compare the drag reduction effects of the bogie side fairing configurations and the numerical results yields that the bogie side fairing can reduce the aerodynamic drag of the 6-car trainset up to 7.8%. The aerodynamic drag coefficient of each vehicle as well as the flow structures around the bogie system have also been examined to analyze the reason and mechanism of the drag reduction by bogie side fairing.
Journal of the Korean Society for Precision Engineering
/
v.29
no.6
/
pp.607-612
/
2012
The wear problem of wheel flange occurs at sharp curves of rail. This paper proposes a procedure for optimum design of a wheel profile wherein flange wear is reduced by improving an interaction between wheel and rail. Application of optimization method to design problem mainly depends on characteristics of design space. This paper compared local optimization method with global optimization according to sensitivity value of objective function for design variables to find out which optimization method is appropriable to minimize wear of wheel flange. Wheel profile is created by a piecewise cubic Hermite interpolating polynomial and dynamic performances are analyzed by a railway dynamic analysis program, VAMPIRE. From the optimization results, it is verified that the global optimization method such as genetic algorithm is more suitable to wheel profile optimization than the local optimization of SQP (Sequential Quadratic Programming) in case of considering the lack of empirical knowledge for initial design value.
Journal of the Korean Society for Precision Engineering
/
v.29
no.6
/
pp.626-631
/
2012
In this study, fatigue life of the motor block bracket units for KTX-Sancheon trains was assessed. Design evaluation for railway structures was performed based on the UIC 566 regulation, and test and evaluation of fatigue life in welded parts was performed in accordance with standard ERRI B 12/RP17 and ERRI B 12/RP60. The actual vehicle dynamic stress testing was executed in KTX-Sancheon service line with the service operating speed. The dynamic stress was measured with commercial data acquisition system (MGC plus). The cumulative damage was evaluated by applying standard BS 7608 - Class F and cycle counting was used rain-flow counting method. As a result, the motor block bracket units for KTX-Sancheon trains was designed to fit the regulation and the safety of fatigue life for 30 years, assuming that KTX-Sancheon trains travels 600,000km annually, were confirmed under current operating conditions.
Kim In-Jae;Kang Kee-Dong;Han Sang-Chul;Yang Shin-Choo
Proceedings of the KSR Conference
/
2004.10a
/
pp.818-823
/
2004
In case of the Korea Railroad, when we would decide the track structure, it has been introduced the whole track structure system based on only the foreign application cases and data offered by manufacturers without the process of the objective performance verification. The value of property for track materials, derived from the calculation of track structure, was hard to perform the objective performance evaluation among track structure systems because each manufacturer adopted the different test method and standard. To solve the above-mentioned problem, it should suggest the technical and objective evaluation method about the performance of track materials and meet with the standard of High Speed railroad and international railroad through the establishment and revision of performance standard. In the objective and technical respects, it will be a major role to decide the track structure. In this paper, I would like to summarize the case which was improved the problem of test method and standard exposed from the performance verification of Rail Fastening System among the track structure systems of High speed railroad.
The Transactions of The Korean Institute of Electrical Engineers
/
v.64
no.8
/
pp.1256-1261
/
2015
Along with the increase of railway catenary system operation speed to 400 km/h, there have been growing demands for good quality current collection systems that satisfy quality standards as well as criteria for safe working. Retaining uniform elasticity tension of contact wires is essential in maintaining high quality contact between pantograph and OCL (Overhead Contact Line) of current collection systems in high speed railways. Therefore, the tension of contact wire must be kept within tight tolerance limits in both working conditions and adverse weather conditions of catenary system. In accordance with these conditions, this paper presents a real time monitoring system for the tensioning device of the newly installed catenary system on the special route of Honam high speed line for 400 km/h operation. For the verification of the true value of tension of contact wires, we have developed ring-type tensioning sensors which were installed on supporting points of mast which compose the catenary system. According to the field test performed on the Honam high speed line catenary system, variation of tension was measured accurately in real-time.
Hwang, Jong-Gyu;Kim, Baek-Hyun;Kang, Seok-Won;Jeong, Rak Gyo
Journal of international Conference on Electrical Machines and Systems
/
v.2
no.3
/
pp.356-360
/
2013
The PRT (Personal Rapid Transit) system is a new transportation system in accordance with the requirements of the passengers. Although this PRT system was proposed a long time ago, it did not hold the limelight due to the several limitations in technology. However, the research and development has been active again recently thanks to the development in technology and the review on its applicability as the means of transportation linking to the urban transit system. Although most of these recent studies in relation to the PRT are focused on the hardware such as PRT vehicles or track structures, etc., the operational aspect of it is more important than that of any other means of public transportation. Therefore, among studies on operational aspect of this PRT system, this paper shows the result of study on technology in relation to the movement of vehicle to the station where it was called by the passenger through interface of the wayside control center with the vehicle control system in case where the passenger calls a vehicle at the station.
The Transactions of The Korean Institute of Electrical Engineers
/
v.63
no.10
/
pp.1479-1484
/
2014
This paper deals with regenerative energy in railway system which one of the largest customer in terms of load capability. Unlike the other loads of power system, loads of railway systems change in time and space. It has a characteristic amount of generating regenerative energy by frequent starting and braking in railway system. Therefore, it is expected higher utilization in railway system than the other systems. The purpose of DC power supply simulation is analyzing backed energy, regenerative energy by each railway vehicle and substation. In this paper, regenerative energy utilization are analyzed using DC power supply simulation and it is performed changing major influence on the design such as the number of installing absorber, internal resistance value, no-load voltage value at substation or operating parameters at regenerative energy utilization. After simulating, results are compared and analyzed.
Kim, Moo Sun;Kim, Jungtai;Kim, Taesik;Park, Sung Soo;Hong, Jae Sung;Cho, Yong Hyeon;Min, Jai Hong
Journal of the Korean Society for Railway
/
v.16
no.5
/
pp.402-409
/
2013
In metropolitan railway systems, the average commuting time keeps increasing as the scheduled speed increases, and this leads to a decline of rail service usage and competitiveness. Therefore, effective express operation for urban trains is required to improve the scheduled speed. In this study, based on the obtainable time shortening efficiency and economic viability, several express operations are suggested for urban railways and these suggestions are compared by considering high performance trains with acceleration/deceleration and maximum speed improvement. As a result, the optimum express system, which can minimize the cost for sidetrack construction, is suggested.
Failures of equipments for train control systems are linked directly to extensive damages of human lives or financial losses from the increasing uses of train control equipments utilizing computers. Then safety activities for assuring safety and reliability are needed during the system life-cycle. Risk analysis is important phase to increase safety from determining the risk presented by the identified hazard. In this paper, we investigated several methods for risk estimation of safety activities, and then we drew a comparison between original methods to suggest optimized one in the application to train control systems. In the result of the comparison, we had plan to propose the risk analysis method called Best-Practice(BP) risk method combining advantages of the qualitative and the quantitative analysis. In addition, we attempted to apply the BP-risk method to domestic train control systems handling in Korea.
Hwang, Jong-gyu;Jo, Hyun-Jeong;Han, Chan-Hee;Cho, Woo-Sick;Ahn, Jin
Journal of the Korean Society of Safety
/
v.25
no.1
/
pp.93-101
/
2010
As safety-related regulations for signaling systems are standardized to IEC 61508/62278/62425, and others at the international level, safety activities and its assessment are required to be performed. And also there is the need to develop technologies for safety improvement to secure safety signaling systems in terms of technologies for safety activities on each life-cycle. In this paper we have developed the safety activity processes and technologies each steps of proposed processes respectively for railway signaling systems. And the proposed process and technologies are applied to the safety activities for mock-up signaling systems.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.