• 제목/요약/키워드: Rail site

검색결과 99건 처리시간 0.024초

철도차량용 휠과 레일의 피로균열시작 수명에 관한 연구 (Study on the fatigue crack initiation life in rail wheel contact)

  • 김태완;설광조;조용주
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 추계학술대회 논문집(I)
    • /
    • pp.733-738
    • /
    • 2002
  • In this study, contact fatigue in wheel-rail contact is simulated. It is necessary to calculate contact stress and subsurface stresses accurately to predict fatigue behavior. Contact stresses are obtained by contact analysis of semi-infinite solid based on influence function and subsurface stress field obtained by using rectangular patch solutions. Based on these stress values, several multiaxial high-cycle fatigue criteria are used and the critical loads corresponding to fatigue limits are calculated. The simulation results show that the critical load is decreasing rapidly and the site of crack initiation also moves rapidly to the surface from the subsurface when friction coefficient exceeds a specific value for all of three fatigue criteria.

  • PDF

희생양극법을 적용한 철도 레일의 방식효과 모니터링 연구 (A Study on Monitoring of Mitigation of Rail Corrosion using Sacrificial Anode Cathodic Protection Method)

  • 최정열;박종윤;이규용;정지승
    • 문화기술의 융합
    • /
    • 제5권4호
    • /
    • pp.367-371
    • /
    • 2019
  • 본 연구에서는 해양성 기후조건에 있는 철도 레일의 부식으로 인한 선로장애를 최소화하고 레일의 부식을 저감시키기 위한 방식대책으로써 희생양극법을 제시하고 방식효과를 실험적으로 입증하였다. 또한 제안된 희생양극을 현장에 시험부설하여 26개월 이상 장기 레일부식모니터링 및 현장적용성을 검토하고 레일부식의 효과를 입증하였다. 셀로판테이프법을 이용한 부식상태 모니터링 결과, 현장시험부설 후 약 26개월이 경과된 현 시점에서의 희생양극의 외관상태는 양호하며, 레일복부와 희생양극의 용접부 이상 및 기타 특이사항은 발견되지 않았으나, 희생양극을 설치하지 않은 개소에서는 녹의 진전이 빠르게 진행되었다. 또한 희생양극의 적정 설치간격은 1.0~1.5m까지가 상대적으로 가장 안정적인 부식피막을 형성하는 것으로 조사되었다. 약 26개월의 모니터링 결과, 희생양극의 설치는 설치간격이 다소 넓더라도 해양성 기후조건에 있는 철도 레일의 전반적인 부식발생 수준을 안정화하는 데에 도움을 줄 수 있어 부식에 취약한 환경에 부설된 철도 레일에 적용이 가능할 것으로 분석되었다.

철도디젤차량에서 배출되는 오염물질의 배출량 산정방법 개발 (Development of Estimation Methods of Pollutant Emissions from Railroad Diesel Rolling Stocks)

  • 박덕신;김동술
    • 한국대기환경학회지
    • /
    • 제20권4호
    • /
    • pp.539-553
    • /
    • 2004
  • Up to the present time, many methods to estimate emissions from a particular diesel engines have wholly depended on the quantity of diesel fuel consumed. Then, the recommended emission factors were normalized by fuel consumption, and further total activity was estimated by the total fuel consumed. One of main purposes in the study is newly to develop emission factors for the railroad diesel rolling stock (RDRS) and to estimate a total amount of major gaseous pollutants from the RDRS in Korea. Prior to develop a Korean mode emission factor. the emission factor from the USEPA was simply applied for comparative studies. When applying the USEPA emission factors, total exhaust emissions from the RDRS in Korea were estimated by 28,117tons of NOx, 2,832.3tons of CO, and 1,237.5tons of HC, etc in 2001. In this study, a emission factor for the RDRS, so called the KoRail mode (the Korean Railroad mode) has been developed on the basis of analyzing the driving pattern of the Gyeongbu-Line especially for the line-haul mode. Explicitly to make the site specific emission factors, many uncertainty problems concerning weighting factors for each power mode, limited emission test, incomplete data for RDRS, and other important input parameters were extensively examined. Total exhaust emissions by KoRail mode in Korea were estimated by 10,960tons of NOx, and 4,622tons of CO, and so on in the year of 2001. The emissions estimated by the USEPA mode were 2.6 times higher for NOx, and 1.6 times lower for CO than those by the KoRail mode. As a conclusion, based on the emission calculated from both the USEPA mode and the KoRail mode, the RDRS is considered as one of the significant mobile sources for major gaseous pollutants and thus management plans an(1 control strategies for the RDRS must be established to improve air quality near future in Korea.

ei-Rail을 활용한 노선설계 모형의 적용 및 중앙선/서해안선 사례분석 (Implementation and Analysis of Railway Design Model using ei-Rail with Joong-Ang and Seo-Hae Lines)

  • 신영호;김정현;오지택
    • 대한토목학회논문집
    • /
    • 제35권2호
    • /
    • pp.407-415
    • /
    • 2015
  • 철도사업을 추진함에 있어, 지금까지 대부분의 사업은 노선과 선형계획은 엔지니어가 현장 사전조사 결과 및 지형도 등을 이용하여 한정된 수의 대안을 설정하여 분석하는 방식으로 수행되어 왔다. 본 연구에서는 유전자 알고리즘을 이용한 지능형 철도선형계획 프로그램(ei-Rail)을 개발하여, 가능한 모든 대안에 대하여 선형요소 및 공사비에 대한 평가를 가능하게 하였다. 그리고 기존에 계획된 노선에 대한 비교 평가를 통하여 기존 대안보다 사업비를 절감할 수 있을 뿐만 아니라, 이에 소요되는 비용과 시간도 단축할 수 있는 것으로 나타났다. 본 연구의 결과는 향후 국내외 철도사업 계획 수립에 소요되는 비용과 시간, 그리고 전체 사업비 절감을 가능케 함으로써 철도분야 발전에 도움이 될 수 있을 것으로 기대할 수 있다.

Coil Gun Electromagnetic Launcher (EML) System with Multi-stage Electromagnetic Coils

  • Lee, Su-Jeong;Kim, Ji-Hun;Song, Bong Sob;Kim, Jin Ho
    • Journal of Magnetics
    • /
    • 제18권4호
    • /
    • pp.481-486
    • /
    • 2013
  • An electromagnetic launcher (EML) system accelerates and launches a projectile by converting electric energy into kinetic energy. There are two types of EML systems under development: the rail gun and the coil gun. A railgun comprises a pair of parallel conducting rails, along which a sliding armature is accelerated by the electromagnetic effects of a current that flows down one rail, into the armature and then back along the other rail, but the high mechanical friction between the projectile and the rail can damage the projectile. A coil gun launches the projectile by the attractive magnetic force of the electromagnetic coil. A higher projectile muzzle velocity needs multiple stages of electromagnetic coils, which makes the coil gun EML system longer. As a result, the installation cost of a coil gun EML system is very high due to the large installation site needed for the EML. We present a coil gun EML system that has a new structure and arrangement for multiple electromagnetic coils to reduce the length of the system. A mathematical model of the proposed coil gun EML system is developed in order to calculate the magnetic field and forces, and to simulate the muzzle velocity of a projectile by driving and switching the electric current into multiple stages of electromagnetic coils. Using the proposed design, the length of the coil gun EML system is shortened by 31% compared with a conventional coil gun system while satisfying a target projectile muzzle velocity of over 100 m/s.

엘리베이터 가이드 레일 브라켓의 방진라이너 적용효과에 관한 분석 (An Analysis on the Effect of Application on Vibration Isolation Liner of Elevator Guide Rail Bracket)

  • 노승권;김은도;오종석;조재웅
    • 한국융합학회논문지
    • /
    • 제10권8호
    • /
    • pp.145-151
    • /
    • 2019
  • 본 연구에서는 고층아파트 승강로 근접세대에 대한 진동 및 소음저감대책의 일환으로 승강기 가이드 레일 브라켓에 방진라이너를 적용하여 그 효과들을 분석하였다. 방진라이너 성능 분석결과, 카 측에서는 65.49%, 카운터 측에서는 90.05%의 방진성능을 확인할 수 있었다. 그러므로, 엘리베이터 가이드 레일 브라켓의 방진라이너의 진동저감 효과를 상당히 가지고 있다. 방진라이너 적용의 경우 제진빔 적용에 비해 승강기 운행통로(승강로) 면적은 7.26 ~ 22.22% 감소, 재료비와 설치비는 3,840,000원 ~ 9,780,000원의 절감효과를 확인할 수 있었다. 또한, 중량물인 제진빔에 비해 경량물인 방진라이너를 적용할 경우, 설치현장의 안전사고 예방에 효과가 클 것으로 사료된다.

도심지 터널 암반분류를 위한 선형배열 상시진동 탄성파탐사 적용 (Application of linear array microtremor survey for rock mass classification in urban tunnel design)

  • 차영호;강종석;조철현;이건
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 한국지구물리탐사학회 2005년도 공동학술대회 논문집
    • /
    • pp.157-164
    • /
    • 2005
  • 일반적인 물리탐사기법은 도심지내에서 구조물, 전도성 지장물, 차량 등 인공 잡음으로 인하여 그 적용성에 많은 제약을 받는다. 전철이 운행하는 철로 하부에 대한 탐사 역시 전선 및 열차진동이 일반 물리탐사 적용을 제한한다. 본 과업에서는 그 대안으로 선형배열 상시진동탄성파탐사를 적용하였다. 상시진동탐사(mircotremor survey)기법에는 철로를 운행하는 기차와 주변 도로위의 차량에 의한 진동이 오히려 양호한 송신원으로 활용 될 수 있다. 선형배열 상시진동탐사기법에서는 일반적인 굴절법 장비를 이용하여 일상적인 진동을 기록하고, 파동장의 변환을 수행하여 표면파의 분산곡선을 얻는다. 이후 발췌한 분산곡선에 대한 반복적인 수치모델링을 통하여 전단파속도를 구한다. 본 과업에서는 기존 철로를 따라 하부의 터널심도까지의 전단파속도를 전체 터널구간에 대하여 얻기 위하여 40m간격으로 선형배열을 이동하면서 자료를 획득하였다. 측선상의 시추공에서 수행한 SPS검층을 통하여 획득한 전단파속도와 RMR의 비교한 결과 전단파 속도와 RMR이 높은 상관관계에 있음을 확인할 수 있었으며, 상시진동탐사기법을 통하여 획득한 전단파속도 역시 RMR과의 양호한 상관관계를 나타냄을 알 수 있었다. 이러한 상관관계를 이용하여 도심지 철도터널 전체 구간에서 암반분류를 위한 RMR 추정이 가능하였다.

  • PDF

철도노반의 개량방법 (The Improvement Method of Railway Roadbed)

  • 심재범
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 춘계학술대회 논문집
    • /
    • pp.621-626
    • /
    • 2005
  • A major part of permanent way maintenance effort is justified by inadequacies in the track substructure and in particular in drainage conditions, which need to be put right across the entire network. In most cases nowadays, improvements of the substructure can be carried out on rail to a high standard of quality. However, this entails substantial movements of material for the removal of spoil and provision of new material. In the future, recycling of old material on site, and use of geosynthetics, will be necessary to help considerably reduce this volume.

  • PDF

경부선 철도 소음진동의 전파특성에 관한 기초 연구 (A Study on the Characteristics of Railroad Noise and Vibration Propagation in KYOUNGBU Line)

  • 김석홍;이성춘;김준호
    • 소음진동
    • /
    • 제3권1호
    • /
    • pp.47-55
    • /
    • 1993
  • In order to maintain comfortable life environment around railroad site, noise from train itself, and to train & rail interaction, and the vibration transmitted through the ground should be controlled to the extent of permissible level. In order to achieve this, the basic railroad noise & vibration data such as magnitude and frequency characteristics of them are necessary to establish the counterplan for railroad noise & vibration. In this study, we measured and analysed the characteristics of time variation, frequency, direction and distance attenuation of noise and vibration of the railroad between Seoul and Pusan.

  • PDF

레일긴장기의 성능을 고려한 효율적인 장대레일 설정방법 (Evaluation of Installation Length of CWR Considering Rail Tenser's Capacity And Track Maintenance)

  • 박옥정;김응록
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.72-79
    • /
    • 2010
  • 한국국철은 1966년 경부선에서 1.8km의 장대레일을 부설한 이래, 레일 장대화 개량사업을 지속적으로 확대하고 있으며 최근에 착공하거나 계획 중인 주요본선은 전면 장대화하도록 권장하여 부설지역이 광범위해지고 부설률이 증가함으로써 장대레일 관리가 한층 중요하게 되었다. 그러나 최근에는 산업화, 도시화 과정에서 과다 배출된 이산화탄소 등의 온실효과로 등 지구온난화에 따른 장대레일 작업가능시기 단축, 재설정 등 장대레일 작업의 대폭 증가에 대응하여 제한된 유지보수인력, 낙후된 기술과 장비로 장대레일을 적기에 관리는 매우 힘들어 효율적인 장대레일 관리대책이 요구되고 있다. 이러한 관점에서 전국 주요 간선철도 지역의 기후변화와 장대레일 설정온도, 지점별 대기온도 관련 기상자료, 각종 장대레일 관리기준, 한국국철의 안전사고, 장애기록, 절손현황, 기존의 레일 온도측정치, 장대레일 연구자료 등을 종합 분석하고 레일긴장기 소요성능을 검토한 결과, 철도현장에 주로 사용하고 있는 70Ton급 긴장기는 영하온도대역의 긴장력 및 설정연장 1km 이상의 경우 성능에 여유가 없을 것으로 분석되었다. 따라서 1회 설정구간을 과다하게 계획하지 말고, 기온이 영상으로 올라가 레일용접이 가능한 적정시점을 택하여, 레일온도와 설정온도차를 최대한 줄이는 것이 바람직 할 것으로 판단되었다.

  • PDF