• 제목/요약/키워드: Rail site

검색결과 99건 처리시간 0.021초

장대레일의 진동저감효과에 관한 연구 (Vibration Reduction Effect of the Continuously Welded Rail)

  • 황선근;엄기영;고태훈
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2000년도 추계학술대회 논문집
    • /
    • pp.119-125
    • /
    • 2000
  • In this study, field measurements and analysis of vibration before and after the installation of continuously welded rail were performed. The vibration data obtained at the same locations before and after were analyzed to find out the characteristics of vibration level. The component of train-induced impulsive vibration at the rail joints varies depending upon the distance from the source, however mostly low frequency vibration which propagates long distance causes the problems of vibration. Even though it is expected that there may be certain degree of discrepancy in the amount of reduction in vibration depending upon site ground conditions, it was found that installation of continuously welded rail shows reduction in train-induced vibration.

  • PDF

레일부유궤도 시스템에 대한 성능 평가 (Performance Evaluation On Floating Rail Track System)

  • 김순철;강정옥;지윤배;한광섭;전병찬
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.756-762
    • /
    • 2004
  • Up to now, the only way is Floating Slab Track System, which cuts off vibration by installing spring between concrete slab and ground for the lines of particularly requiring attenuating vibration. The weak point of Floating Slab Track System is large increase of construction cost because normally the structure is getting bigger. In regards to this matter, Floating Rail Track System has been developed, which cuts off vibration by floating the first cause of vibration rail, and the system is in operation. In the thesis, the application of new attenuating vibration track system has been confirmed by studying theoretical background of Floating Rail Track System and evaluating dynamic deflection of track and attenuating of noise and vibration performance through various measurements from laboratory tests and site inspection.

  • PDF

Numerical Analysis for Development of Vertical Falling Prevention System

  • Kwon, Oh-Heon;Kim, Sang-Tae;Kang, Ji-Woong
    • International Journal of Safety
    • /
    • 제8권2호
    • /
    • pp.1-4
    • /
    • 2009
  • Various falling prevention systems with vertical guided rail have been supplied in order to prevent falling accidents and acquire the long life and cost down for the maintenance. Almost the imported system is composed of a guided rail and the comfort components. It has the mechanism that cannot be dismounted from the guided rail at the accident site. Thus, the aim of this study is to develop a falling prevent system that has a direct dismounting function, which can release easily from the falling accident point. This system has a high durability and robust. And the cost efficiency of the system and safety for workers also are improved remarkably. From the results, we showed the proposed new falling system is sufficiently safety and satisfies the KOSHA regulation through the numerical stress analysis. Also it is expected as the useful and effective safety device for workers.

안전난간유형에 따른 작업자 안전의 상관관계에 대한 실험적 연구 (An Experimental Study on the Correlationship Between Highrised Safetyguard and Workers' Safety)

  • 손기상
    • 한국안전학회지
    • /
    • 제16권2호
    • /
    • pp.80-84
    • /
    • 2001
  • Work stress and health are very important factors related to workers' condition and work safety, Author has conducted a couple of tests to check up three people's pulses before they work during their work for three types of safety guard in construction site. Work type, age, weight, sex experience year, ambient temperature n recorded as variables in this study. These are checked and asked by the author directly, before their pulse check Also, workers' Pulses were measured at height H-0 and H-9.0m to understand psychological the degree of psychological nervousness degree. POLAR protrainer NVTM HRM system(wrist recorder and sensor) was used for the site test. There are three(3) different types of construction safety guard which have been used for, this study. They are usually or frequently used and found in the site. Four different ranges of age groups(20's, 30's 40's, 50's) carpenters are assisted to the test sites with wearing pulse recorder and sensor respectively. All three types of safety guards have the same height 90㎝ even though they are different types. On top of five(5) stories tublar framed scaffolding is fabricated, similar to the one in site, where those safety guards are installed. The older(=more experienced) the workers are the more stable they are. it is shown. Also, It is verified the visually uncomfortable rail type can cause workers to psychologically be unstable.

  • PDF

전철 고상홈 전기통전 위험요인 분석 및 대책 연구 (A study on the Hazard analysis and Improving methods for an Electrical shock on the Platform)

  • 왕종배;조연옥
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.258-262
    • /
    • 2004
  • In this paper, the hazard factors on voltage rising effect between the rail and the earth were reviewed in subway system of AC traction line according to moving condition and location of the train. Site measuring of voltage rising between conductor part of train and station floor was performed to ascertain the risk level on the passenger. Plans for preventing hazard of rail-voltage rising and electrical shock on the passengers at platform were proposed.

  • PDF

지하철 직류 급전시스템의 표유전류 실태조사 (On-site Investigation of the Stray Current Condition in DC-Powered Subway System)

  • 하윤철;배정효;하태현;이현구;김대경
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.373-375
    • /
    • 2003
  • The subway, a typical electrified transit, is operated by the 1500 V DC-powered system with the overhead positive feeder and the rails negative return. This return path would bring about considerable stray current circuits, that is, from the bottom of rails to sell and then to the station ground, unless the rail-to-soil resistance is sufficiently high. The stray current can cause electrolytic corrosion of subway metallic structures and adjacent underground utilities. In this paper, we reports on-site investigation of the stray current condition, especially influenced by drainage method. The drainage method including both forced drainage and polarized drainage, extensively adopted as a countermeasure for electrolytic corrosion of underground pipelines, was found out to exert a harmful influence upon rail components as well as the pipelines.

  • PDF

유한요소해석을 통한 EMS 레일 단면 해석 (Section Analysis of EMS Rail by Finite Element Analysis)

  • 유병권
    • 대한기계학회논문집 C: 기술과 교육
    • /
    • 제3권1호
    • /
    • pp.63-69
    • /
    • 2015
  • 운반설비 중 보편적 기술의 하나인 EMS (Electric Monorail System)는 천장 트러스에 매달려 운반물을 이송하는 장치로, 공간 활용의 극대화라는 장점과 더불어 저소음 등 작업 환경이 개선된다는 점에서 널리 이용되고 있다. 본 논문에서는 운반물의 하중을 지지하고 고속 이송시 가이드 역할을 하여 이탈을 방지하는 EMS 레일에 대하여 다양한 방법으로 해석하고, 이를 바탕으로 레일 단면 설계의 최적화 방향을 모색한다. 경량이면서 고강성을 지닌 레일은 트러스에 가해지는 하중을 최소화 하고 이로 인한 레일 생산비 절감 및 설치 작업성 향상 등을 기대할 수 있다.

기후변화에 대비한 장대레일 온도특성 연구 (Investigation on the Temperature Characteristics of CWR for the Climate Change)

  • 최진유;이규세;배현웅;박범호;임남형
    • 한국철도학회논문집
    • /
    • 제13권2호
    • /
    • pp.179-185
    • /
    • 2010
  • 장대레일 좌굴과 파단에 대한 안정성을 확보하고 효율적인 유지관리를 위해서는 레일온도의 특징을 파악하는 것이 매우 중요하다. 최근 들어, 기후변화에 의해 여름철 최고 대기온도는 상승하고 겨울철 최저 대기온도는 점점 하강하고 있다. 이러한 현상은 연간 레일온도의 변화량에 영향을 미치게 되고 설정온도와 관리온도의 변화를 일으킬 수 있다. 본 연구에서는 기후 및 온도 측정시스템을 구축하여 기후요소를 포함한 레일온도를 실측하였다. 실측자료의 심층적인 분석을 통하여, 기존 레일온도 추정식은 특정한 조건(기후요소들의 특정 조합) 에서만 적용이 가능함을 알 수 있었다. 현장의 실제 기후요소를 고려한 레일온도를 확률론적 접근으로 예측하는 것이 더욱 합리적일 것이다.

다목적 바닥 레벨조인트 공법의 개발 및 성능평가에 관한 연구 (Development and Performance Evaluation of Floor Level Joint System)

  • 최윤철;서수연;지남용;이리형
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2002년도 봄 학술발표회 논문집
    • /
    • pp.953-958
    • /
    • 2002
  • The finishing method of concrete floor using automatic surface finisher is one of new technologies in concrete floor construction. The development of high technologies in construction will increase in order to satisfy the demand to construct high quality building. Using this method, it is possible to increase the quality of building as well as to reduce the labor work in site. In this paper, a system which can be used to finish the concrete floor using automatic surface finisher, is presented and its structural capacities are evaluated. The system is composed of rail which guides the surface vibrator and absorbs the volume change of concrete, and a device supporting the rail. From the experimental work for these devices, it was shown that the support and rail had suitable strength to resist the automatic surface finisher. For design purpose, also, effective span of supports was tabulated.

  • PDF

하이드로 포밍 성형공정 해석을 위한 강소성 유한요소 프로그램 개발 및 적용 (Rigid-Plastic Finite Element Approach to Hydroforming Process and Its Application)

  • 강범수
    • 한국정밀공학회지
    • /
    • 제17권4호
    • /
    • pp.22-28
    • /
    • 2000
  • By using the finite element method, the Oyane's ductile fracture integral I was calculated from the histories of stress and strain according to every element and then the forming limit of hydroforming process could be evaluated. The fracture initiation site and the forming limit for two typical hydroforming processes, tee extrusion and bumper rail under different forming conditions are predicted in this study. For tee extrusion hydroforming process, the pressure level has significant influence on the forming limit. When the expansion area is backed by a supporter and bulged, the process would be more stable and the possibility of bursting failure is reduced. For bumper rail, the ductile fracture integral i is not only affected by the process parameters, but also by the shape of preforming blank. Due to no axial feeding on the end side of the blank, the possibility of cracking in hydroforming of the bumper rail is influenced by the friction condition more strongly than that of the tee extrusion. All the simulation results show reasonable plastic deformation, and the applications of the method could be extended to a wide range of hydroforming processes.

  • PDF